Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹9.3 LAccepted-AOC | ₹9.3 L | L1 | Accepted-AOC firm became L1 for the respective work orders |
| 2 | L1₹9.4 LAccepted-AOC | ₹9.4 L Quoted ₹9.8 L | L1 | Accepted-AOC firm became L1 for the respective work orders |
| 3 | L1₹16.9 LAccepted-AOC | ₹16.9 L Quoted ₹18.7 L | L1 | Accepted-AOC firm became L1 for the respective work orders |
| 4 | L1₹22.2 LAccepted-AOC | ₹22.2 L Quoted ₹22.5 L | L1 | Accepted-AOC firm became L1 for the respective work orders |
| 5 | L1₹1.1 CrAccepted-AOC | ₹1.1 Cr Quoted ₹1.2 Cr | L1 | Accepted-AOC firm became L1 for the respective work orders |
| Sl No | Description | Qty | Unit | RAGUNATH T N | SYED IRSHED | Katheja auto electrical works | MAHAA SREE MOTORS | FARADAY ELECTRICALS |
|---|---|---|---|---|---|---|---|---|
| 1.00Work order for Reconditioning work of Electrical assembly & Spares through Labour Contract | ||||||||
| 1.01 | Rewinding of Self Starter Armature (Ashok Leyland & TATA)
Self Starter Armature Strapping, Cleaning and rewinding with same flat enamel wire of correct specification, Changing of new Commutator) | 800 | Nos | 6,00,000 ₹7,08,000 | - | 5,68,000 ₹6,70,240 Lowest | - | - |
| 1.02 | Re-Conditioning of Alternator (Ashok Leyland &TATA)
(Dismantling, Cleaning, Reconditioning of Rotor Assy. Replacing the Carbon Brush, Replacing with new/RC spares, Assembling and Checking.) | 1,000 | Nos | 3,95,000 ₹4,66,100 Lowest | - | 5,25,000 ₹6,19,500 | 4,90,000 ₹5,78,200 | - |
| 1.03 | Re-Conditioning of Self Starter (Ashok Leyland & TATA)
(Dismantling, Cleaning, Reconditioning of Solenoid switch, Drive assembly and Brush Gear, Replacing the Carbon Brush, Replacing with new/RC spares, Assembling and Checking.) | 2,400 | Nos | 9,48,000 ₹11,18,640 Lowest | - | 12,60,000 ₹14,86,800 | 11,76,000 ₹13,87,680 | - |
| 1.04 | Re-Conditioning of Starter Coil Assembly - Ashok Leyland
(Strapping, Cleaning, Rewinding with new wire of correct specification, Soldering, Dipping in Varnish, Checking) | 760 | Nos | 4,86,400 ₹5,73,952 | 4,56,000 ₹5,38,080 | 3,42,000 ₹4,03,560 | 3,35,920 ₹3,96,385.6 Lowest | - |
| 1.05 | Re-Conditioning of Starter Coil Assembly - TATA
(Strapping, Cleaning, Rewinding with new wire of correct specification, Soldering, Dipping in Varnish, Checking) | 120 | Nos | 1,32,000 ₹1,55,760 | 96,000 ₹1,13,280 | 64,800 ₹76,464 Lowest | 64,800 ₹76,464 Lowest | - |
| 1.06 | Re-Conditioning of Rotor Assembly.- TATA
(Strapping, Cleaning, Rewinding with new wire of correct specification, Changing of SRE-Bearing and Slip Ring, Checking) | 160 | Nos | 1,60,000 ₹1,88,800 | 1,28,000 ₹1,51,040 | 90,400 ₹1,06,672 | 88,800 ₹1,04,784 Lowest | - |
| 1.07 | Re-Conditioning of Rotor Assembly – Ashok Leyland(Strapping, Cleaning, Rewinding with new wire of correct specification, Changing of SRE-Bearing and Slip Ring, Checking) | 760 | Nos | 4,86,400 ₹5,73,952 | 4,56,000 ₹5,38,080 | 3,80,000 ₹4,48,400 Lowest | 4,02,800 ₹4,75,304 | - |
| 1.08 | RC Work of Self Starter Main Field (Leyland & TATA)
(Cleaning, Main Field Taping, Replacement of New Pole Screw and Carbon Bush) | 1,200 | Nos | 4,80,000 ₹5,66,400 | 5,88,000 ₹6,93,840 | 4,68,000 ₹5,52,240 Lowest | 4,74,000 ₹5,59,320 | - |
| 1.09 | RC Work of SRE Shield (Ley & TATA) | 1,200 | Nos | 3,12,000 ₹3,68,160 | - | 1,92,000 ₹2,26,560 Lowest | 2,28,000 ₹2,69,040 | - |
Tender Value
Refer Docs
EMD Value
₹80,000
Closing Date
4 Feb 2025, 2:30 pmClosed
Managing Director
No.2, Pallvan salai, Pallavan Illam, MTC (Chennai) Ltd., Chennai -600 002
The Reconditioning works shall be carried out by the bidder either inside or outside (depends up on the item) MTC premises
2025_MTC_517301_1
119/49519/PSP3/MTC/2024
Open Tender
Miscellaneous Services
Piece-work
365 days
Chennai
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹80,000
Yes
8 Aug 2025
7 Jan 2025
4 Feb 2025
7 Jan 2025
4 Feb 2025
8 Jan 2025
Work order for Reconditioning work of Electrical assembly & Spares through Labour Contract
Rewinding of Self Starter Armature (Ashok Leyland & TATA) Self Starter Armature Strapping, Cleaning and rewinding with same flat enamel wire of correct specification, Changing of new Commutator)
Re-Conditioning of Alternator (Ashok Leyland &TATA) (Dismantling, Cleaning, Reconditioning of Rotor Assy. Replacing the Carbon Brush, Replacing with new/RC spares, Assembling and Checking.)
Re-Conditioning of Self Starter (Ashok Leyland & TATA) (Dismantling, Cleaning, Reconditioning of Solenoid switch, Drive assembly and Brush Gear, Replacing the Carbon Brush, Replacing with new/RC spares, Assembling and Checking.)
Re-Conditioning of Starter Coil Assembly - Ashok Leyland (Strapping, Cleaning, Rewinding with new wire of correct specification, Soldering, Dipping in Varnish, Checking)
Re-Conditioning of Starter Coil Assembly - TATA (Strapping, Cleaning, Rewinding with new wire of correct specification, Soldering, Dipping in Varnish, Checking)
Re-Conditioning of Rotor Assembly.- TATA (Strapping, Cleaning, Rewinding with new wire of correct specification, Changing of SRE-Bearing and Slip Ring, Checking)
Re-Conditioning of Rotor Assembly – Ashok Leyland(Strapping, Cleaning, Rewinding with new wire of correct specification, Changing of SRE-Bearing and Slip Ring, Checking)
RC Work of Self Starter Main Field (Leyland & TATA) (Cleaning, Main Field Taping, Replacement of New Pole Screw and Carbon Bush)
RC Work of SRE Shield (Ley & TATA)
RC Work of Drive Assembly (Lucas & Bosch Make) (Leyland&TATA) (Cleaning, replacing ball, spring, rubber kit, cup and grease packing)
RC Work of Small Bus Stator Coil -(Leyland &TATA) (Strapping, Cleaning, Rewinding with new of correct Specification, Soldering, Dipping in Varnish, Checking)
RC Work Of Small Bus Rotor Coil- (Leyland & TATA) (Strapping, Cleaning, Rewinding With New Wire Of Correct Specification, Changing Of SRE- Bearing And Slip Ring Checking)
RC Of Small Bus Armature - (Leyland & TATA) (Self Starter Armature Stapping, Cleaning And Rewinding With Same Flat Enamel Wire Of Correct Specification, Changing Of New Commutator)
RC Work of Small Bus Main Field -(Leyland &TATA) (Cleaning, Main Field Taping, Replacement Of New Pole Screw And Carbon Bush)
RC Work Of Small Bus Drive Assembly - (Leyland & TATA) (Cleaning, Replacing Ball, Spring, Rubber Kit, Cup And Grease Packing)
Reconditioning of Leyland A/C Bus Blower Motor (Dismantling, Cleaning, Replacing the Carbon Brush, Replacing/Rewinding the Armature if necessary, Replacing the Bearings if necessary, Assembling Checking)
Reconditioning of Leyland A/C Bus Condenser Fan (Dismantling, Cleaning, Reconditioning of Brush Gear, Replacing/Rewinding the Armature if necessary, Replacing the Bearings if necessary, Assembling Checking)
Reconditioning of Leyland A/C Bus Alternator 150 Amps (Dismantling, Cleaning, identify the Repair Spares and Replace the new spares, Replacing the Bearings if necessary, Assembling and Checking.)
Reconditioning of Leyland BSIV & A/C Bus Wiper Motor (Dismantling, Cleaning, identify the Repair Spares and Replace the new spares, Assembling and Checking.)
Reconditioning of Leyland BSIV & A/C Bus Wiper Armature (Dismantling, Cleaning, Removing the Burned Wire and Rewinding the New Wire, Varnishing and Checking)
Reconditioning work of Ceiling Fan Rotor Coil
LED Tube light assembly - 2 feet (Dismantling the cover, clean with soap oil, check the electrical line, Replace the defective parts with new spares, Assembling, Testing and painting to be done)
Reconditioning work of LED strip light 55" (Dismantling, Cleaning and washing, Check the electrical line, Replace the defective parts with new spares, White paint to be done and paste the strip in the putty, Assembling and testing)
Reconditioning work of LED strip light 97" (Dismantling, Cleaning and washing, Check the electrical line, Replace the defective parts with new spares, White paint to be done and paste the strip in the putty, Assembling and testing)
Reconditioning work of Battery main cable (Remove the sleeve, Inspect the cable, Terminal, both side lug properly. If terminal found to be defective (rust), clean with acid, check and replace the Terminal (if necessary) and dip with lead. After dipping the terminal, the insualtion done on the dipped area, Assembling (cover with sleever) and Testing.)
Reconditioning work of Battery earth cable (Remove the sleeve, Inspect the cable, Terminal, both side lug properly. If terminal found to be defective (rust), clean with acid, check and replace the Terminal (if necessary) and dip with lead. After dipping the terminal, the insualtion done on the dipped area, Assembling (cover with sleever) and Testing.)
Reconditioning work of Battery Looping cable (Remove the sleeve, Inspect the cable, Terminal, both side lug properly. If terminal found to be defective (rust), clean with acid, check and replace the Terminal (if necessary) and dip with lead. After dipping the terminal, the insualtion done on the dipped area, Assembling (cover with sleever) and Testing.)
Reconditioning work of Battery both side lug cable (Remove the sleeve, Inspect the cable, Terminal, both side lug properly. If terminal found to be defective (rust), clean with acid, check and replace the Terminal (if necessary) and dip with lead. After dipping the terminal, the insualtion done on the dipped area, Assembling (cover with sleever) and Testing.)
Reconditioning work of small bus Battery main cable (Remove the sleeve, Inspect the cable, Terminal, both side lug properly. If terminal found to be defective (rust), clean with acid, check and replace the Terminal (if necessary) and dip with lead. After dipping the terminal, the insualtion done on the dipped area, Assembling (cover with sleever) and Testing.)
Reconditioning work of small bus Battery earth cable (Remove the sleeve, Inspect the cable, Terminal, both side lug properly. If terminal found to be defective (rust), clean with acid, check and replace the Terminal (if necessary) and dip with lead. After dipping the terminal, the insualtion done on the dipped area, Assembling (cover with sleever) and Testing.)
RC work of 1 HP Jet pump motor (Dismantling the motor -pump, impeller, core, water seal, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding & Impeller to be change (if necessary) Assembling, Testing and painting to be done)
RC work of 1.5 HP Jet pump motor (Dismantling the motor -pump, impeller, core, water seal, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding & Impeller to be change (if necessary) Assembling, Testing and painting to be done)
RC work of 2 HP Jet pump motor (Dismantling the motor -pump, impeller, core, water seal, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding & Impeller to be change (if necessary) Assembling, Testing and painting to be done)
RC work of 3 HP Jet pump motor (Dismantling the motor -pump, impeller, core, water seal, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding & Impeller to be change (if necessary) Assembling, Testing and painting to be done)
RC work of 0.5 HP Monoblock Motor (Dismantling the motor -pump, impeller, core, water seal/rope, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding & Impeller to be change (if necessary) Assembling, Testing and painting to be done)
RC work of 1 HP Monoblock Motor (Dismantling the motor -pump, impeller, core, water seal/rope, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding & Impeller to be change (if necessary) Assembling, Testing and painting to be done)
RC work of 2 HP Monoblock Motor (Dismantling the motor -pump, impeller, core, water seal/rope, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding & Impeller to be change (if necessary) Assembling, Testing and painting to be done)
RC work of 3 HP Monoblock Motor (Dismantling the motor -pump, impeller, core, water seal/rope, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding & Impeller to be change (if necessary) Assembling, Testing and painting to be done)
RC work of 5 HP Monoblock Motor (Dismantling the motor -pump, impeller, core, water seal/rope, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding & Impeller to be change (if necessary) Assembling, Testing and painting to be done)
RC work of 7.5 HP Monoblock Motor (Dismantling the motor -pump, impeller, core, water seal/rope, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding & Impeller to be change (if necessary) Assembling, Testing and painting to be done)
RC work of 5 HP Air Compressor Motor (Dismantling the motor, pulley, core, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding to be change (if necessary), Assembling the motor and fixing pulley, Testing and painting to be done)
RC work of 10 HP Air Compressor Motor (Dismantling the motor, pulley, core, bearing and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding to be change (if necessary), Assembling the motor and fixing pulley, Testing and painting to be done)
RC work of 1.5 HP KRE Machine motor (Dismantling the motor, shaft, core, bearing, oil seal and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or shaft bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding to be change (if necessary), Assembling the motor, Testing and painting to be done)
RC work of 0.5 HP KRE Machine motor (Dismantling the motor, shaft, core, bearing, oil seal and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or shaft bend, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding to be change (if necessary), Assembling the motor, Testing and painting to be done)
RC work of 3 HP Car washer motor (Dismantling the motor, shaft, core, bearing, key and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or shaft bend/key, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding to be change (if necessary), Assembling the motor, Testing and painting to be done)
RC work of 5 HP Car washer motor (Dismantling the motor, shaft, core, bearing, key and all required spares, Cleaning all the required spares and core, inspecting all the parts whether physically damage or shaft bend/key, Fixing insulation paper, Replacing the new spares for the defective parts, coil rewinding to be change (if necessary), Assembling the motor, Testing and painting to be done)
RC work of 3 HP Starter assembly (Dismantling the starter and all required spares like Relay, Contactor and test board, Cleaning all the required spares, inspecting all the required parts, Replacing the new spares for the defective parts, Assembling and Testing the starter)
RC work of 5 HP Starter assembly (Dismantling the starter and all required spares like Relay, Contactor and test board, Cleaning all the required spares, inspecting all the required parts, Replacing the new spares for the defective parts, Assembling and Testing the starter)
RC work of 10 HP Starter assembly (Dismantling the starter and all required spares like Relay, Contactor and test board, Cleaning all the required spares, inspecting all the required parts, Replacing the new spares for the defective parts, Assembling and Testing the starter)
RC work of Battery charger (Dismantling the battery charger and all required spares, Cleaning all the required spares, inspecting the diode, Rotory switch from Multimeter/Ammeter, output checked from Transformer, Replacing the new spares for the defective parts, Assembling and Testing the battery charger)
RC work of Ceiling fan assembly (Dismantling the body, Fan guard and leaf, Cleaning all the required spares like coil core, inspecting all the required parts and check the shaft bend, Fixing Insulation paper, Replacing the new spares for the defective parts, Rewinding the coil (if necessary) Assembling and Testing and the Ceiling fan)
RC work of Air circulator assembly (Dismantling the body, Fan guard and leaf, Cleaning all the required spares like coil core, inspecting all the required parts and check the shaft bend, Fixing Insulation paper, Replacing the new spares for the defective parts, Rewinding the coil (if necessary) Assembling and Testing and the Air circulator assy.)
RC work of Exhaust fan assembly (Dismantling the body, Fan guard and leaf, Cleaning all the required spares like coil core, inspecting all the required parts and check the shaft bend, Fixing Insulation paper, Replacing the new spares for the defective parts, Rewinding the coil (if necessary) Assembling and Testing and the Exhaust fan assy)
RC work of Grease Luber pump assembly (Dismantling, Cleaning and washing of defective parts, Replace the new spares for the defective, Assembling and Testing)
RC work of Grease pistol assembly (Dismantling, Cleaning and washing of defective parts, Replace the new spares for the defective, Assembling and Testing)
Outside43
Outside44
Outside45
Outside46
Outside47
Outside48
Outside52
Outside53
SYED IRSHED
RAGUNATH T N
Inside3
Outside33
Outside51
MAHAA SREE MOTORS
Outside5
Outside6
Outside13
Outside21
Outside41
Outside50
Outside54
Katheja auto electrical works
Outside5
Outside7
Outside8
Outside9
Outside10
Outside11
Outside12
Outside14
Outside15
Outside16
Outside17
Outside18
Outside19
Outside20
Inside25
Inside26
Inside27
Inside28
Inside29
Inside30
Outside31
Outside32
Outside35
Outside36
Outside37
Outside38
Outside39
Outside40
Outside42
Outside49
Outside55
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .