Loading…
Loading…
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
25 Dec 2025, 11:00 amClosed
AMARBIR SINGH KANG
GAS SBU, Bharat Petroleum Corporation Limited
Bharat Petroleum Corporation Limited invites bids through limited e-tendering for appointment of AGENCY FOR OBTAINING STATUTORY PERMISSIONS FOR DEVELOPMENT OF CITY GAS DISTRIBUTION PROJECT IN LAKHIMPUR KHERI, SITAPUR, BAHRAICH, SHRAWASTI, BALRAMPUR, SIDDHARTH NAGAR & MAHARAJGANJ GA OF BPCL
23439
1000447157
Limited Tender
Works
GAS SBU
₹1 L
21 Apr 2026
9 Dec 2025
25 Dec 2025
10 Dec 2025
25 Dec 2025
10 Dec 2025
10 Dec 2025 - 25 Dec 2025
Unpriced SOW - Obtaining Statutory Permission for Development of City Gas Distribution Project in lakhimpur Kheri, Sitapur, Bahraich,
Shrawasti, balrampur, Siddharth Nagar & Maharajganj GA of BPCL
Sr. No Description Unit Quantity Quoted/Unquoted
10 Permission NH along - Obtaining permission for laying Gas pipeline along with OFC
cable from apropriate NH authority (NHAI/NH PWD) for laying along the RoU of
National highway within 3 months of intimation given by BPCL to bidder for applying
At each crossing location, application for combined permission needs to be applied for
pipeline (with carrier pipe) and OFC with duct. For measurement purpose, payment
against this line item will be paid on per km length of highway for which approval has KM 70 Quoted/Unquoted
Note: This permission should also include permission for any roads which are
connecting to or terminating at highway and are within the RoU of the highway, even if
the permission for these roads is required to be obtained from seperate authority,
bidder will obtain permission from same without any additional cost.
20 Permission NH Crossings - Obtaining permission for laying gas pipeline along with
OFC cable from appropriate NH authority for crossings at desired location within
months of intimation given by BPCL to bidder for applying of NOC. At each crossing
location, application for combined permissions needs to be applied for pipeline (with
NO. 3 Quoted/Unquoted
carrier pipe) and OFC (with duct). For measurement purpose, at each crossing location
permission so obtained for pipeline and OFC will be treated as one (single). Quantity
will be treated as one (1), even if seperate applications are applied for pipeline and
OFC at crossing location.
30 Permission - Reserved Forest
Obtaining permission for laying Gas pipeline along with OFC cable from Forest
Department for Protected/Reserved Forest within 5 months of intimation given by
BPCL to bidder for applying for NOC.For measurement purpose, permission letter so NO. 1 Quoted/Unquoted
obtained for the particular area for pipeline and OFC will be treated as one (single).
Quantity will be treated as one (1), even if separate applications are applied for
Pipeline and OFC.1. All range area will be considered as one.
40 Permission - Protected Forest
Obtaining permission for laying Gas pipeline along with OFC cable from Forest
Department for Protected/Reserved Forest within 3 months of intimation given by
BPCL to bidder for applying for NOC.For measurement purpose, permission letter so NO. 3 Quoted/Unquoted
obtained for the particular area for pipeline and OFC will be treated as one (single).
Quantity will be treated as one (1), even if separate applications are applied for
Pipeline and OFC.1. All range area will be considered as one.
NHAI Access Permission
Obtaining Acess Permission from NHAI/NH PWD for setting up of Fuel Station (CNG
Station) within 3 Months including Conducting site survey upto distance of 1.5km on
both the sides of plot including photography and videography of plot, Preparation of
proposal for online submission to NHAI and online submission of proposal including
preparation of 5 nos. files- 3 original + 2 photocopies, Liasoning with PIU/Executive NO. 2 Quoted/Unquoted
engineer/SE/Chief Engineer office including NH consultant, arranging site visits along
with NH officials, submission of replies to the queries including submission of any
supporting document/drawing and forwarding the clearnace to RO office & Liasoning
with RO office NHAI, arranging site visits along with NH officials, submission of replies
to the queries including submission of any supporting document/drawing and getting
60 DM NOC for setting up of CNG/CGS/PRS Station
Obtaining DM NOC from District Magistrate for setting up of CNG/CGS/PRS Station
within 3 Months including preparation of drawings, proposal, cooridnation woth NO. 3 Quoted/Unquoted
respective departments, arranging site visits along with various departments, replying
to technical queries, submission of replioer to queries & getting Final NOC.
70 Permission- PWD Along
Obtaining permission for laying Gas pipeline along with OFC cable from Appropriate
Authority for particular area/location (as instructed by BPCL) within 1.5 months of
intimation given by BPCL to bidder for applying for NOC.For measurement purpose, NO. 1 Quoted/Unquoted
permission letter so obtained for the particular area for pipeline and OFC will be treated
as one (single). Quantity will be treated as one (1), even if separate applications are
applied for Pipeline and OFC.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
23439.pdf
pdf • 22.33 MB
BUDGETDOC_23439.pdf
pdf • 0.19 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .