| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹31.6 LAccepted-AOC | L1 | Accepted-AOC L1 | |
| 2 | L2₹41.0 L+₹9.3 L (29.6%)Rejected-AOC | L2 | Rejected-AOC L2 | |
| 3 | L3₹46.3 L+₹14.6 L (46.3%)Rejected-AOC | L3 | Rejected-AOC L3 |
Tender Value
₹35.5 L
EMD Value
₹50,000
Closing Date
26 Mar 2024, 4:00 pmClosed
Chief Executive Officer
Chief Executive Officer Park Centre, Technopark Phase I Campus, Trivandrum
SUPPLY, INSTALLATION TESTING AND COMMISSIONING OF HVAC VRF SYSTEM AT BHAVANI BUILDING ROOF TOP SPACE, TECHNOPARK PHASE I CAMPUS, TRIVANDRUM
2024_ETPK_657203_1
ETPK/PH-I/2023-24/AT-200
Open Tender
Miscellaneous Works
Item Rate
70 days
Bhavani Building, Technopark Phase I Campus
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,950
₹50,000
30 Apr 2024
9 Feb 2024
27 Mar 2024
9 Feb 2024
26 Mar 2024
12 Feb 2024
10 Feb 2024 - 26 Feb 2024
Amount
Supply, installation, testing, and commissioning of an air-cooled VRV/VRF outdoor unit equipped with an Inverter Scroll Compressor. The system shall utilize eco-friendly R410A refrigerant. The scope includes the provision of an outdoor stand and Vibration Isolation pads to ensure stable and noise-minimized operation. Additionally, the contractor must supply and install a suitable rating of XLPE armored cable, which is essential for the commissioning of the units. The power isolator has to be provided within a radius of 5 meters from the outdoor unit. The contractor is also responsible for the accurate and adequate charging of refrigerant gas, which must be carried as per OEM recommendations. The unit should have a minimum IPLV of 5.76 for 22 HP and 5.33 for 32 HP ( The minimum capacity of the equipment should be as follows). (Approved Make: Daikin/LG/Haier/Mitsubishi)
Supply, installation , testing , and commissioning of Central Remote Controller System with a 10-inch touch screen. This system will be responsible for controlling the VRV/VRF System directly, without the integration of a third-party Building Management System (BMS). This should include the provision of high-quality communication cables and necessary equipment designed to ensure efficient and loss-free data transmission. The proposed location for the installation of the screen is Module I (electrical room), as indicated in the provided layout plan. The system should be capable of facilitating online service functionalities. This includes remote monitoring, adjustment capabilities, and diagnostic features to ensure efficient and proactive management of the VRV/VRF system. The contractor must ensure that the Central Remote Controller System is fully compatible with the VRV/VRF units and adheres to all the specifications and standards set by the Original Equipment Manufacturer (OEM). The contractor is also responsible for providing comprehensive training to the relevant personnel on the operation and maintenance of the Central Remote Controller System. All necessary training and documentation, including detailed manuals and troubleshooting guides, should be provided as part of the commissioning process. The quote must include all aspects of the supply, installation, testing, and commissioning of the Central Remote Controller System, ensuring that the system is fully operational, user-friendly, available online, and capable of delivering optimal performance in managing the VRV/VRF system.
Supply, installation, testing, and commissioning of the Tenant Billing Software system, designed to align with the specific billing parameters of Technopark. This process includes the provision of all necessary hardware and software components, along with reliable communication cables, including the Power Consumption Distribution Gateway. The software must be capable of accurately calculating the power consumption of each indoor unit. This calculation will be based on a variety of operational parameters, including the status of the unit, return air temperature, the position of the electronic expansion valve, and baseline values as determined by the manufacturer. It is essential that the billing system reflects the actual energy consumption of the corresponding units, providing a transparent and accurate basis for billing purposes. The system should be equipped to verify whether the actual consumption aligns with the required design conditions, ensuring efficiency and adherence to predetermined energy usage standards. The contractor is responsible for ensuring that the system is fully operational and meets the satisfaction of Technopark. The scope of work should include all aspects of system setup, including comprehensive testing and commissioning to confirm that the software accurately tracks and reports energy usage as per Technopark's billing requirements. The quote must include all aspects of the supply, installation, testing, and commissioning process, ensuring a turnkey solution for the Tenant Billing Software system. Adequate training and documentation for the operation and maintenance of the system are also to be provided by the contractor.
Supply, installation, testing, and commissioning of a four-way cassette-type VRV/VRF indoor unit. Each unit must be equipped with a cordless remote control and a decorative panel that meets the aesthetic requirements of the installation site. The contractor must ensure that the units are of the specified capacities and are complete with high-quality filters, a coil section featuring a refrigerant cooling coil, and a fan section. Additionally, an adequately sized insulated drain pan must be included to ensure efficient condensate drainage without leakage. The contractor is responsible for providing the power supply for each indoor unit. This power supply should be located at the nearest possible location as per the direction of engineer-in-charge, within a 3-meter radius of the unit, to facilitate optimal operation and ease of maintenance. The installation and commissioning of these units should strictly comply with the specifications and guidelines provided by the Original Equipment Manufacturer (OEM). This adherence is essential to avoid any operational failures or technical mishaps. The contractor must also ensure that the system operates efficiently, effectively, and safely with proper support structure. The quote must encompass all aspects of the supply, installation, testing, and commissioning process, including the provision of power supply for indoor units. (Make:Daikin/LG/Haier/Mitsubishi)
Minimum of 0.8 TR Ceiling Mounted Cassette (4Way Cassette)
Minimum of 3 TR Ceiling Mounted Cassette (4Way Cassette)
Minimum of 4 TR Ceiling Mounted Cassette (4Way Cassette)
The supply and installation of refrigerant piping shall comply with the following specifications in accordance with the terms and conditions outlined in the tender document: * Insulation: All refrigerant piping is to be insulated with 19-mm-thick nitrile rubber sleeves. The insulation must be coated with polyshield or an equivalent IC-clad material to ensure thermal efficiency and effective condensation control. * Pipe Support: The piping should be supported using GSS slotted rail arrangements and GI clamps to provide necessary structural stability and maintain proper alignment of individual pipes. * Installation Accessories: The installation shall include all necessary accessories, such as elbows, T-joints, sleeves, and other relevant components, to ensure a complete and functional setup. * Exposed Piping Arrangement: For sections with exposed copper pipes, a ladder-type cable tray should be used to ensure orderly and secure installation. * Piping Diameter Specifications: For diameters above 19.8mm, 18 gauge hard-drawn copper piping should be used, chosen for its strength and durability. For diameters of 19.8mm and below, soft, seamless copper piping is recommended due to its flexibility, which is ideal for complex installations. All installation practices must comply with industry standards to ensure the safety and efficiency of the refrigerant piping system.
41.3 mm dia
34.8 mm dia
28.6 mm dia
22.22 mm dia
19.03 mm dia
15.88 mm dia
12.7 mm dia
9.5 mm dia
6.4 mm dia
Supply and installation of PVC drain piping with a focus on functional design and efficiency. The drain piping must be installed with a sufficient slope to ensure successful operation and effective drainage.This network shall include all necessary fittings such as elbows, couplings, and T-joints, customized to meet on-site conditions for optimal water distribution. The installation must be executed considering the available routing height, ensuring that the piping does not protrude below the level of the false ceiling. Piping insulation has to be done using 9mm thick XLPE Aluminium foil-faced sleeves, appropriately gum pasted to the PVC pipe. All joints in the piping system are to be securely laminated with 3mm thick XLPE Tape featuring high-strength 3M adhesive, guaranteeing airtight connections. The contractor must diligently follow these specifications to ensure a seamless and discreet installation in line with the structural and aesthetic requirements of the site.
32 mm dia
25 mm dia
Supply and installation of fresh air PVC piping network for the entire VRF system, designed to withstand a pressure rating of 4kgf/cm². This network shall include all necessary fittings such as elbows, couplings, and T-joints, customized to meet on-site conditions for optimal air distribution. At the external end of the piping, a wire mesh shall be installed to prevent the entry of insects and foreign objects. The sizing of the piping must be in accordance with the OEM's recommendations for the respective unit capacities. The scope of work includes providing all materials, labor, and equipment necessary for the complete and effective installation of the fresh air PVC piping system
3 inch dia
2 inch dia
Supply and installation of Factory / Site fabricated, Rectangular sheet metal GSS ducts of grade 120 GSM Cowl for ODUs with wire mesh.
Supply installation testing energizing and commissioning of Electrical panels as per the terms and conditions of the tender document.
HEVACO COOLING SYSTEMS PVT LTD
STARWINGS
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_1015293.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .