Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹98,000Admitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹1.7 L+₹71,800 (73.3%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.7 L+₹72,000 (73.5%)Admitted-Finance 102 JASMINE PLOT N0 15 SECTOR 44 SEAWOODS WEST 400706 THANE MAHARASHTRA 400706 | THANE | MAHARASHTRA | 400706 | L3 | Admitted-Finance | |
| 4 | L4₹2 L+₹1.0 L (104.1%)Admitted-Finance OFFICE NO 507 ELLORA FIESTA PLOT NO 08 SANPADA SECTOR 11 NAVI MUMBAI MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | L4 | Admitted-Finance | |
| 5 | L5₹2.2 L+₹1.2 L (120.4%)Admitted-Finance PLOT NO 4B SURVEY NO 237 3P INDUSTRIAL PARK VAKALAPUDI KAKINADA EAST GODAVARI ANDHRA PRADESH 533005 | KAKINADA | ANDHRA PRADESH | 533005 | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Fuji Technical Services Pvt Ltd L4 | SHRI GURUDATTA ENGINEERING WORKS L6 | SRI SAI KRISHNA WORKS L2 | SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD L5 | RAO ELECTRICAL ENGINEERIONG WORKS L1 | NASS Engineering Services Pvt Ltd L3 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Manpower and tools assistance required to carryout attached scope of work under OEM guidance. Work involves removal, Dismantling, lifting, shifting, cleaning, assembling, installation,necessary tools
support, inway jobs (As per Technical specification is enclosed | 1 | LS | 2,00,000 ₹2,00,000 | 2,47,000 ₹2,47,000 | 1,69,800 ₹1,69,800 | 2,16,000 ₹2,16,000 | 98,000 ₹98,000 Lowest | 1,70,000 ₹1,70,000 |
Tender Value
Refer Docs
Closing Date
10 Feb 2026, 11:00 amClosed
M(SRC-OS)
HSL
MANPOWER ASSISTANCE FOR OEM SERVICE ENGINEER OF MAIN AIR COMPRESSORS MAJOR OVERHAULING
2026_HSL_98903_1
SR COMPLEX/PRODUCTION/OUT SOURCE REQUISITION/2025/717
Open Limited
Miscellaneous Services
Service
20 days
VISAKHAPATNAM
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
Exempted
16 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
10 Feb 2026
3 Feb 2026
Manpower and tools assistance required to carryout attached scope of work under OEM guidance. Work involves removal, Dismantling, lifting, shifting, cleaning, assembling, installation,necessary tools support, inway jobs (As per Technical specification is enclosed
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.03 MB
TBID_717.pdf
Tender Documents • 0.38 MB
document.pdf
Tender Documents • 0.43 MB
BOQ_108472.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .