Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹74.2 LAdmitted-Finance VILLAGE SARKANDA P O GONA TEHRI GARHWAL | TEHRI GARHWAL | UTTARAKHAND | 248008 | L1 | Admitted-Finance | |
| 2 | L2₹78.4 L+₹4.2 L (5.65%)Admitted-Finance TEHRI G | DEHRADUN | UTTARAKHAND | 248008 | L2 | Admitted-Finance | |
| 3 | L3₹81.8 L+₹7.6 L (10.2%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | DHARAM SINGH KATHAIT L1 | Semwal Electrical Engineering Company L3 | Sunil Joshi Electrical Contractor L2 |
|---|---|---|---|---|---|---|
| 1.00Electrical Items : | ||||||
| 2.00 | Holding Clamp J-I hook for AB cable | 543 | NOS | 1,38,465 ₹1,38,465 | 1,35,750 ₹1,35,750 Lowest | 1,52,040 ₹1,52,040 |
| 3.00 | F Clamp | 8 | NOS | 2,080 ₹2,080 | 2,000 ₹2,000 Lowest | 2,240 ₹2,240 |
| 4.00 | STAY CLAMP FOR SP-21 WITH NUT & BOLT | 22 | NOS | 5,610 ₹5,610 | 5,500 ₹5,500 Lowest | 6,160 ₹6,160 |
| 5.00 | STAY CLAMP FOR SP-23 WITH NUT & BOLT | 54 | NOS | 14,040 ₹14,040 Lowest | 14,580 ₹14,580 | 15,120 ₹15,120 |
| 6.00 | STAY CLAMP FOR SP-10 WITH NUT & BOLT | 23 | NOS | 5,865 ₹5,865 Lowest | 6,210 ₹6,210 | 6,210 ₹6,210 |
| 7.00 | EARTH WIRE CLAMP FOR SP-23 WITH N/B | 32 | NOS | 8,160 ₹8,160 Lowest | 9,280 ₹9,280 | 8,320 ₹8,320 |
| 8.00 | DEAD END CLAMPS WITH I HOOK AND N/B INS | 108 | NOS | 50,760 ₹50,760 Lowest | 54,000 ₹54,000 | 51,300 ₹51,300 |
| 9.00 | PP & CLAMP WITH N&B ST POLE SP-23 | 68 | NOS | 25,840 ₹25,840 Lowest | 27,200 ₹27,200 | 26,180 ₹26,180 |
| 10.00 | Susp. Clamp With I Hook (Ins.),CIamp, N&B | 434 | NOS | 2,03,980 ₹2,03,980 Lowest | 2,10,490 ₹2,10,490 | 2,10,490 ₹2,10,490 |
Tender Value
Refer Docs
EMD Value
₹1.5 L
Closing Date
18 Jan 2024, 2:00 pmClosed
SE
EDC Tehri
Increasing capacity of different type of DTRs and construction of associated HT and LT line at different villages of Nailchami Feeder in EDSD Ghansali under EDD Tehri .
2024_UPCL4_67249_1
48/EDCT/2023-24
Open Tender
Miscellaneous Services
Item Wise
90 days
Ghansali
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
EE TEST
₹1.5 L
Yes
29 Jan 2024
5 Jan 2024
19 Jan 2024
5 Jan 2024
18 Jan 2024
5 Jan 2024
Electrical Items :
Holding Clamp J-I hook for AB cable
F Clamp
STAY CLAMP FOR SP-21 WITH NUT & BOLT
STAY CLAMP FOR SP-23 WITH NUT & BOLT
STAY CLAMP FOR SP-10 WITH NUT & BOLT
EARTH WIRE CLAMP FOR SP-23 WITH N/B
DEAD END CLAMPS WITH I HOOK AND N/B INS
PP & CLAMP WITH N&B ST POLE SP-23
Susp. Clamp With I Hook (Ins.),CIamp, N&B
STAY INSULATOR
AL TO AL CONNECTOR ABCABLE 16 TO 16 mm
Piercing Connector 16-16sqmm
Mid Jointing sleeve 25mm
LT Distribution Box 3Phase 4Wire
L Line CONNETOR CABLE TO CONDCTOR 70MM
Head shrink type end caps for LT ABC
Piercing Connector 70 Sq.mm-70Sq.mm
Piercing Connector 35 Sq.mm-35Sq.mm
LT XLPE Cable 1x25 sqmm
LT AB Cable 3x70+1x50 sqmm
LT AB Cable 3x35+1x25 sqmm
LT XLPE AB CABLE 1CX16+25 SQ.MM.
AL TO AL CONNECTOR AB CABLE 35-35 SQ. MM.
LT DISTRIBUTION BOX 1 PHASE
Auxiliary connector/contact
AL CRIMPING TYPE LUGS 25 SQ.mm
LABOUR (SERVICES)
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-10 POLE
ERECTION OF SINGLE SP-21 POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
DISMANTLING OF SP-10 SINGLE POLE
DISMANTLING OF SP-21/SP-23 SINGLE POLE
DISMANTLING OF SP-23 DOUBLE POLE
DISMANTLING OF 11 KV LINE(WEASEL)
DISMANTLING OF 16 KVA DTR
INST. OF 25 KVA DTR ON POLE STRUCTURE
FIXING OF FUSE SET
FIXING OF LIGHTNING ARRESTOR
LAYING OF WEASEL CONDUCTOR IN HT LINE
LOPPING & CHOPPING OF TREE BRANCHES
CARTAGE SP-10 POLE, 150-200KM
CARTAGE SP-21/23 POLE, 150-200KM
CARTAGE OF PETTY MATERIAL,150-200KM
CARTAGE OF 16/25 KVA DTR, 100-150KM
CARTAGE OF 16/25 KVA DTR, 150-200KM
HEADLOAD CARTAGE SP-10 POLE(0-1 KM)
HEADLOAD CARTAGE SP-10 POLE(1-3 KM)
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
HEADLOAD CARTAGE SP-21/23 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
HEADLOAD CARTAGE OF 16 KVA DTR(0-1 KM)
HEADLOAD CARTAGE OF 16 KVA DTR(1 -3 KM)
HEADLOAD CARTAGE OF 25 KVA DTR(0-1 KM)
HEADLOAD CARTAGE OF 25 KVA DTR(1-3 KM)
LAYING OF LT AB CABLE 3X70+1 X50 SQMM
LAYING OF LT AB CABLE 3X35+ 1 X25 SQMM
REPLACEMENT OF BASE CHANNEL OF DTRS
DISMANTLING AND REFIXING OF DIST. BOX
Laying of AB Cable 1x16+25 mm
Fixing of heat Shrink Cap for AB Cable
DELTA EARTHING OF T/F NEUTRAL POINT
FIXING OF CHANNEL, ANGLE ON POLE
FIXING OF 11 KV MID SPAN JOINTING KIT
BACK HEAD LOAD CART. OF PETTY MAT. 0-1 KM
BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM
DISMANTLING OF LT XLPE CABLE 1CX16+25
Back Carriage of Scrap Material
Sunil Joshi Electrical Contractor
Semwal Electrical Engineering Company
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .