Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹30.5 LAccepted-AOC | ₹30.5 L | L1 | Accepted-AOC Accepted |
| 2 | L2₹30.7 L+₹28,332 (0.93%)Rejected-Finance HOUSE NO F 452 3 LINE NO 09 RAJENDER NAGAR ROORKEE | HARIDWAR | UTTARAKHAND | 247656 | ₹30.7 L+₹28,332 (0.93%) | L2 | Rejected-Finance Reject |
| 3 | L3₹30.9 L+₹44,132 (1.45%)Rejected-Finance BHIKYASEN ALMORA | ₹30.9 L+₹44,132 (1.45%) | L3 | Rejected-Finance Reject |
Tender Value
₹30.7 L
EMD Value
₹75,000
Closing Date
6 Dec 2022, 3:00 pmClosed
Superintending Engineer
Superintending Engineer Electricity Distribution Circle Ranikhet
Annual Maintanance and Operation work of 33/11 KV Sub-station Mohnery under EDD Bhikiyasain
2022_UPCL9_51671_1
EDD(R)-25/2022-23
Open Tender
Repair and Maintenance Services
Item Wise
365 days
Bhikiyasain
As per Tender Document
2 documents required · 2 mandatory
₹2,360
Executive Engineer
₹75,000
23 Sept 2023
16 Nov 2022
7 Dec 2022
16 Nov 2022
6 Dec 2022
16 Nov 2022
Amount
Maintenance and preventive maintenance of 33/11 KV S/s, 33 KV, 11KV, LT/HT line and ditribution T/f's Replacement of damaged/rotten or erection of midspan poles (HT/LT) including cartage from S/s Mohnery/ESC Masi, Replacement of IDF/Mechanical meters 50 per month as per JE/SDO instructions. (22 Km 33KV, 150 Km 11KV, 220 Km LT line and 100 Nos. distribution T/f's including timely release of new service connections & disconnection work as per JE/SDO instructions and consumers complaints handling as per UERC supply code 2020 (NOTE-Amount calculated on per day basis will be deducted from total amount for the month if any one or more Skilled/Unskilled persons made available for work/duty, found absent as per JE/SDO Report). (07 Nos. Skilled/Unskilled Lineman) A- Cost of Hiring SSO's for operation works in shifts (4Shifts) in 33/11 KV Sub-station. (04 Nos. SSO)
Description of Work / Item(s)
Amount
Replacement of damaged/rotten or erection of midspan poles (HT/LT) including cartage from S/s Mohnary/ESC Masi (NOTE- Amount per pole will be paid as per this rate but amount equal to double the cost of replacement of pole will be deducted from the bill of the month in which complaint of such damaged/rotton pole, recieved)
Meter reading and billing with bill distribution at consumer's home as per schedule monthly/bimonthly basis including SBM & accessories-cartage etc.
R&R of damaged transformer 5% of 100 = 5. Excess damaged transformers will be replaced free of cost by the contractor.
SHRI SAI ENTERPRISES
Shri Ganesh Enterprises
Shri Ganesh Enterprises
SHRI SAI ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .