Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAccepted-AOC BARKOT UTTARKASHI | RUDRA PRAYAG | UTTARAKHAND | 246141 | ₹1.4 Cr | L1 | Accepted-AOC QUALIFIED |
| 2 | L2₹1.5 Cr+₹4.4 L (3.07%)Rejected-Finance DEHRADUN VICTORIA CROSS VIJETA GABAR SINGH URJA BHAWAN KANWALI ROAD DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | ₹1.5 Cr+₹4.4 L (3.07%) | L2 | Rejected-Finance NOT QUALIFIED |
| 3 | L3₹1.5 Cr+₹8.3 L (5.79%)Rejected-Finance 128 37 S BLOCK YASHODA NAGAR KANPUR U P | FATEHPUR | UTTAR PRADESH | 208001 | ₹1.5 Cr+₹8.3 L (5.79%) | L3 | Rejected-Finance NOT QUALIFIED |
Tender Value
Refer Docs
EMD Value
₹2.8 L
Closing Date
18 Sept 2024, 12:00 pmClosed
SUPERINTENDING ENGINEER
SUPERINTENDING ENGINEER, EDC KARANPRAYAG
REPLACEMENT OF EXISTING 11KV ACSR WEASEL CONDUCTOR WITH 11KV AAAC AL-59.70 SQMM COVERED CONDUCTOR FOR 11KV AGASTYAMUNI TOWN FEEDER ELIMINATING FROM 33/11 KV AGASTMUNI S/s UNDER EDD, RUDRAPRAYAG ON SEMI-TURNKEY BASIS
2024_UPCL4_75084_1
15/EDC(K)/2024-25
Open Tender
Repair and Maintenance Works
Item Rate
180 days
RUDRAPRAYAG
AS PER NIT
3 documents required · 3 mandatory
₹11,800
EE EDD GOPESHWAR
₹2.8 L
4 Dec 2024
29 Aug 2024
19 Sept 2024
30 Aug 2024
18 Sept 2024
30 Aug 2024
SUPPLY OF MATERIAL PORTION
PP& CLAMP WITH N&B ST POLE SP-55
BRACING CLAMP BOTTOM WITH N&B SP-55
BRACING CLAMP TOP WITH N&B SP-55
Stay Clamp for SP-55 with N&B
11 KV CABLE TIES FOR PIN INSULATOR
11 KV IPC FOR COVERED TO COVERED COND.
11 KV IPC FOR COVERED TO BARE COND.
11 KV MID SPAN JOINTING KIT
IPC with Aluminium Bail for earthing 11KV
11KV AAAC AL-59,70 SQMM COVERED COND.
11 KV TENSION CLAMP WITH BAIL & IPC
LABOUR PORTION
CHEMICAL EARTHING
FABRUCATION OF STEEL
EXCAVATION of PIT FOR STAY SET
ERECTION OF 11KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-55 POLE
ERECTION OF SP-55 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
PAINTING OF SP-55 POLE
CONST.INSTA OF DANGER BOOARD/NUMBER PLATE
CARTAGE SP-55 POLE,71-100 KM
CARTAGE OF PETTY MATERIAL,71-100 KM
HEAD LOAD CARTAGE SP-55 POLE (1-3KM)
HEAD LOAD CARTAGE OF MATERIAL (1-3KM)
FIXing of IPC WITH AL.BAIL.FOR EARTHING
FIXing of 11KV 90KN TENSION CLAMP B&IPC
FIXING OF 11KV IPC FOR CC TO CC COND.
FIXING OF 11KV IPC FOR CC TO BARE COND.
FIXING OF 11KV MID SPAN JOINTING KIT
FIXING OF DISC INS FOR AAAC CONDUCTOR
FIXING OF 11 KV PIN INSULATOR
SUPPLY & FIXING OF ANTI CLIMBING DEVICE
LAYING SPREADING STRINGING AAAC CONDUCTOR
FIXING OF PP CLAMP
REMOVING OLD CONDUCTOR BY OPENING JUMPER AND MATERIAL PROPER COIL WITH LOADING, UNLOADING AND CARRIAGE TO JE STORE.
M/S GOVERDHAN TRADERS
DHRUV ENTERPRISES
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .