| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹8.3 CrAdmitted-Finance BAIKUNTHAPUR HOUSE NO 77 PO LAIMEKURI PS JONAI DISTRICT DHEMAJI PIN 787060 | DHEMAJI | DHEMAJI | ASSAM | 787060 | ₹8.3 Cr | L1 | Admitted-Finance |
| 2 | L2₹8.4 Cr+₹7.8 L (0.94%)Admitted-Finance | ₹8.4 Cr+₹7.8 L (0.94%) | L2 | Admitted-Finance |
| 3 | L3₹9.2 Cr+₹85.8 L (10.3%)Admitted-Finance | ₹9.2 Cr+₹85.8 L (10.3%) | L3 | Admitted-Finance |
| 4 | Rejected-Technical | - | - | Rejected-Technical Firm did not meet all laid down criteria |
| 5 | Rejected-Technical | - | - | Rejected-Technical Firm did not meet all laid down criteria |
| Sl No | Description | Qty | Unit | M/s Purbanchal Suppliers and Contractors L1 | DEVKI NANDAN ASSOCIATES L3 | Nand Lal Tayal L2 |
|---|---|---|---|---|---|---|
| 1.00Between Altitude 4501-4800 mtr | ||||||
| 1.01 | Supply, conveyance, unloading and stacking of Stone Chips 13.2 mm as component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 41.11 | Cum | 6,000 ₹2,46,660 Lowest | 7,277 ₹2,99,157.47 | 6,660 ₹2,73,792.6 |
| 1.02 | Supply, conveyance, unloading and stacking of Stone Chips 6.7 mm as component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 974 | Cum | 6,600 ₹64,28,400 Lowest | 7,277 ₹70,87,798 | 6,660 ₹64,86,840 |
| 1.03 | Supply, conveyance, unloading and stacking of clean coarse sand as fine component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable dry-equivalent stacked quantity after applicable bulkage correction, if any, and material-wise void deduction. | 572 | Cum | 6,600 ₹37,75,200 Lowest | 7,277 ₹41,62,444 | 6,660 ₹38,09,520 |
| 2.00Between Altitude 4801-5100 mtr | ||||||
| 2.01 | Supply, conveyance, unloading and stacking of Stone Chips 13.2 mm as component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 3,517 | Cum | 6,600 ₹2,32,12,200 Lowest | 7,277 ₹2,55,93,209 | 6,660 ₹2,34,23,220 |
| 2.02 | Supply, conveyance, unloading and stacking of Stone Chips 6.7 mm as component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 4,268 | Cum | 6,600 ₹2,81,68,800 Lowest | 7,277 ₹3,10,58,236 | 6,660 ₹2,84,24,880 |
| 2.03 | Supply, conveyance, unloading and stacking of clean coarse sand as fine component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable dry-equivalent stacked quantity after applicable bulkage correction, if any, and material-wise void deduction. | 3,258 | Cum | 6,600 ₹2,15,02,800 Lowest | 7,277 ₹2,37,08,466 | 6,660 ₹2,16,98,280 |
Tender Value
₹6.8 Cr
EMD Value
₹6.7 L
Closing Date
30 Jul 2026, 6:00 pmClosed
Chief Engineer Project Shivalik
HQ CE (P) Shivalik Lal Tappad, Majrigrant Haridwar Dehradun road 248140
SUPPLY STACKING OF CONSTR MATERIALS STONE CHIPS 13pt20MM 6pt7 MM AND SAND FOR SURF WKS BET KM 0 TO KM 18pt250 ON SUMLA THAGLA ROAD IN AOR OF 72 RCC 36 TF SHIVALIK IN UTTARAKHAND
2026_BRO_778147_1
NIT-08 of 2026-27
Open Tender
Civil Works - Roads
Item Rate
210 days
SUMLA THAGLA ROAD IN 72 RCC 36 TF UTTARAKHAND
As per tender documents
8 documents required · 8 mandatory
₹0
₹6.7 L
Yes
26 Aug 2026
13 Jul 2026
7 Aug 2026
14 Jul 2026
30 Jul 2026
23 Jul 2026
14 Jul 2026 - 16 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Between Altitude 4501-4800 mtr | |||||
| 1.01 | Supply, conveyance, unloading and stacking of Stone Chips 13.2 mm as component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 41.11 | Cum | - | - |
| 1.02 | Supply, conveyance, unloading and stacking of Stone Chips 6.7 mm as component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 974 | Sqm | - | - |
| 1.03 | Supply, conveyance, unloading and stacking of clean coarse sand as fine component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable dry-equivalent stacked quantity after applicable bulkage correction, if any, and material-wise void deduction. | 572 | Sqm | - | - |
| 2Between Altitude 4801-5100 mtr | |||||
| 2.01 | Supply, conveyance, unloading and stacking of Stone Chips 13.2 mm as component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 3,517 | Cum | - | - |
| 2.02 | Supply, conveyance, unloading and stacking of Stone Chips 6.7 mm as component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable stacked quantity after applicable material-wise void deduction. | 4,268 | Sqm | - | - |
| 2.03 | Supply, conveyance, unloading and stacking of clean coarse sand as fine component material for Granular Sub-Base (GSB) layers, conforming to the Particular Specifications of the Contract Agreement, as directed by Engineer-in-Charge / OC Contract. Net payable dry-equivalent stacked quantity after applicable bulkage correction, if any, and material-wise void deduction. | 3,258 | Sqm | - | - |
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 2.59 MB
Tendernotice_2.pdf
PDF • 0.12 MB
TenderST8.pdf
Tender Documents • 0.59 MB
TCAL.pdf
Additional Documents • 0.12 MB
PreBidIpact.pdf
Additional Documents • 0.13 MB
BOQ_871518.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .