Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
5 Oct 2024, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Engineer Officer
The Commanding Officer for Engineer Officer ICGS Sarthak
Defect rectification on various engineering systems as per RFP
2024_ICG_677128_1
344/48/EN/STK/24-25
Limited
Marine Services
Works
15 days
Porbandar
Please refer Tender documents.
1 document required · 1 mandatory
₹0
Exempted
7 Oct 2024
28 Sept 2024
7 Oct 2024
28 Sept 2024
5 Oct 2024
28 Sept 2024
Repairs on various engineering systems
E-554 :Following equipment canvas cover to be fabricated as per sample: (a) OBM -02 nos. (Size-33’’x28”x17”) (b) Motor driven Diving air compressor-01 no. (Size-48’’x33’’x26’’) (c) Portable DD Pump-02 nos. (Size-26’’x26’’x26’’) (d) Electric Non-Submersible Pump-01 no. (Size-38’’x40’’x28’’)
E-555: Port gearbox S/by HP Pump purging line deteriorated. Same to be renewed as per sample. (Mat-Cu-Ni , Size-8mm, Length-200mm)
E-556: Both fire & sprinkling pump seal cooling hose deteriorated. Same to be renewed as per sample. (Qty-06)
E-557 :Sea water leakage observed from AER Eductor suction line view pin hole at various places. Same to be renewed as per sample and pressure tested up to 05 bar. (Mat:-MS, Dia – 100 mm, L-1 Mtr.). In way job includes removal and fitment of pipeline.
E-558: Sea water leakage observed from Fwd bilge & ballast pump suction line view pin hole at various places. Same to be renewed as per sample and pressure tested up to 10 bar. (Mat:-MS, Dia – 100 mm, L-1 Mtr.). In way job includes removal and fitment of pipeline
E-559 :Both AC condenser pump discharge valve not holding. Valves to be overhauled and pressure tested up to 07 bar. In way job includes removal and fitment of valves. (SDNR, Dia-125 mm)
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .