Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 22 1 48 1 CHENGALARAOPETA BEACH ROAD VISAKHAPATNAM ANDHRA PRADESH 530001 | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | Admitted-Finance |
| 2 | Admitted-Finance PLOT NO 4B SURVEY NO 237 3P INDUSTRIAL PARK VAKALAPUDI KAKINADA EAST GODAVARI ANDHRA PRADESH 533005 | KAKINADA | ANDHRA PRADESH | 533005 | Admitted-Finance |
| 3 | Admitted-Finance NO 12 HARIKRISHNAPURAM SAWYERPURAM TUTICORIN THOOTHUKUDI TAMIL NADU 628251 | TUTICORIN | TAMIL NADU | 628251 | Admitted-Finance |
| 4 | Rejected-Technical 38 22 39 PLOT NO C11 SRI TOWER ROAD NO 10 INDUSTRIAL ESTATE INDUSTRIAL ESTATE KANCHARAPALEM VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | Rejected-Technical Technically Unsuitable |
Tender Value
Refer Docs
EMD Value
₹15,000
Closing Date
16 Jun 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard limited, Visakhapatnam
Routines on Propeller Shaft Works on MODU SAGAR BHUSHAN
2022_HSL_90264_1
20 / 22005 / Shaft / 058 / 2022-23
Open Tender
Miscellaneous Services
Service
20 days
Hindustan Shipyard Ltd
Please refer Tender documents.
6 documents required · 6 mandatory
₹525
Yes
HSL
₹15,000
Yes
21 Jun 2022
9 Jun 2022
16 Jun 2022
9 Jun 2022
16 Jun 2022
9 Jun 2022
Amount
Routines / Overhauling / Servicing are to be carried out on Propeller Shafts, Stern Tube as per Scope of Work. Satisfactory trials to be offered to ship staff, Class Surveyor & HSL post completion of routines. Defects if any observed by Ship staff to be liquidated and trials to be reoffered. And Finally, Satisfactory trials to be shown to ship staff, Class & HSL. All measuring instruments, Consumables, material are covered in Contractor's Scope
PROPULSION SYSTEM - TAIL SHAFT,PROPELLER,STERN TUBE AND ROPE GUARD - SURVEY JOB-SPECS: 02NOS HEIWA SEISAKUSHO LTD PROPELLERS FIXED PITCH 4BLADES KEY LESS TYPE
ROPE GUARD(02 SETS) TO BE REMOVED,CLEANED AND REFITTED AFTER COMPLETION OF JOB. PROPELLER DROP TO MEASURE BEFORE AND AFTER RENEWAL OF SEALS/BUSHES. PROPELLER'S BLADES TO BUFF/POLISH AND SURFACE FINISH OF BLADES TO CARRY OUT. 4 BLADES ON EACH SIDE.APPLY GREASE/VARNISH. BLADE ROOTS AND TIPS BOTH SIDES TO CHECK FOR CRACKS USING DYE PENETRANT TEST BY COMPETENT TEAM AND SHOWN TO SURVEYOR - 4NOS ON EACH SIDE. FWD AND AFT SEALS SYSTEMS TO BE CHECKED UNDER STATIC HEAD FOR LEAKAGES PRIOR TO DISMANTLING. LEAKAGES TO BE RECTIFIED.SYSTEM TO BE FLUSHED. BOTH THE PROPELLERS TO BE REMOVED FROM TAIL SHAFT. BOTH PROPELLER TO BE PRODUCED FOR SURVEY AND AFTER COMPLETION OF SURVEY AND NECESSARY REPAIRS PROPELLERS TO BE FITTED BACK AS PER MAKER'S LAID DOWN PROCEDURE. COMPLETE WITHDRAWAL OF TAIL END SHAFT BY DISCONNECTING THE HYDRAULIC SKF COUPLING AND RIGID COUPLING. ALL FITTED BOLTS TO REMOVE FROM RIGID COUPLING AT REDUCTION GEAR BOX. THE TAIL END SHAFT TO MAKE FREE BY REMOVING THE SKF COUPLING HYDRAULICALLY AS PER MAKER'S MANUAL AND GUIDELINES. WHILE WITHDRAWING CARE SHOULD BE TAKEN FOR THE TEMPERATURE SENSORS PROVIDED IN THE STERN TUBE IN BOTH AFT AND FWD BUSHES. AFTER WITHDRAWAL THE TAIL END SHAFT TO PLACE ON SUPPORT ON DOCK FLOOR SAFELY WITH ALL LOCKINGS. INSPECTION OF TAIL END SHAFT CLEANING,POLISHING,CALIBRATION OF TAIL SHAFT AND STERN TUBE BUSHES AND REQUIRED NDT TEST TO BE CARRIED OUT TO FULFIL CLASS/FLAG REQUIREMENTS. THE SHAFTS TO BE PRODUCED FOR SURVEY. AFTER COMPLETION OF SURVEY SAME TO FIT IN PLACE ALONG WITH PROPELLER AND ACCESSORIES AS PER PROCEDURE MENTIONED IN MAKER'S MANUAL. ALL CLEARANCES TO MEASURE AND RESTORE THE CLEARANCES TO MAKER'S RECOMMENDATION. SHAFT SEALS(FWD & AFT) ALONG WITH CHROME LINERS TO BE RENEWED, CHROME LINERS TO BE CALIBRATED AND MACHINED/SKIMMED TO THE SIZE.SPARES SHIP SUPPLY. CHROME LINERS MACHINING WORKS ARE IN CONTRACTOR SCOPE. AFTER FITTING OF TAIL SHAFT STERN TUBE SEALS FRESH OIL TO BE TAKEN IN THE SYSTEM AND RECHECK FOR ANY LEAKAGES FOR 12 HRS BEFORE UNDOCKING OF THE VESSEL. ALL PLUGS TO BE FITTED WITH NEW COPPER WASHERS AND WIRE LASHED WITH SS LASHING WIRES. OVERHAULING OF THE SHAFT BRAKE SYTEM INCLUDING THE REPAIRS OF CALIPER, CALIPER CYLINDERS, AIR HYDRAULIC BOOSTER AND AIR SOLENOIDS. ALL ACTIVITIES TO BE CARRIED OUT IN THE PRESENCE OF SUPTD/SURVEYOR/CEO. ALL CONSUMABLES,GREASE/VARNISH,SEALANT PUTTY,TALLOW,ADAPTORS,SS ROPE CUTTER ( 08NS ),WRAPING SHEETS,COPPER WASHERS AND SS LASHING WIRES,POLISHING ROLLS,SS FASTENERS,DP TEST KITS,SEALANT PUTTY,SPARES FOR BRAKE SYSTEM IS PROCURMENT,SUPPLY AND FITMENT IN CONTRACTOR SCOPE. ALL MACHINING WORKS,HYDRAULIC POWER PACKS,HYDRAULIC JACKS,PULLERS,STAGING,WELDING AND GAS CUTTING WORKS ARE COVERED IN CONTRACTOR SCOPE.
FABRICATION OF MS ROPE GUARD(02 SETS) WITH SS ROPE CUTTER ( 08NS )SIZE:AS PER MAKERS DRAWING.
THE STERN TUBE TO BE INSPECTED,CLEANED,PRESSURE TESTED TO IDENTIFY THE DEFECTS / LEAKAGES.AND SAME TO BE RECTIFIED.STERN TUBE PRESENT INSIDE THE BALLAST TANK (11 P&S) TO GAUGE, ANY CORRODED AND RUSTED PART TO RENEW. STERN TUBE PROFILE TO MAINTAIN DURING HOT WORK. ALIGNMENT TO CHECK AND MAINTAIN DURING FABRICATION AND HOT WORK. ALL STERN TUBE LUBE OIL PIPELINE FORWARD AND AFT SEAL TO RENEW . ALL FITTING TO PROVIDE AS PER SAMPLE FITTED IN THE SYSTEM . ALL CONSUMABLES,BLANKS,SEALS,MACHINING WORKS,STAGING,WELDING AND GAS CUTTING WORKS ARE COVERED IN CONTRACTOR SCOPE.
MACHINING OF ONE TAIL SHAFT TO ITS NEXT UNDERSIZE AS PER SURVEYOR RECOMMANDATIONS.MACHINING WORKS,TRANSPORTAION OF TAIL SHAFT COVERED IN CONTRACTOR SCOPE.
FWD AND AFT STERN TUBE BUSHES TO BE REMOVED, REBABBITING OF BOTH BUSHES UNDER CLASS APPROVAL/ OEM RECOMMENDATION AND REFITTED BACK. ALL MACHINING WORKS,REBABBITING WORKS,HYDRAULIC POWER PACKS,HYDRAULIC JACKS,PULLERS,STAGING,WELDING AND GAS CUTTING WORKS ARE COVERED IN CONTRACTOR SCOPE.
A THOROUGH ALIGNMENT CHECK OF BOTH TAIL SHAFT WITH RESPECT TO GEAR CASE AND AFT STERN TUBE BUSH TO BE CARRIED OUT AND NECESSARY ADJUSTMENT TO BE DONE TO BRING FULL SHAFTING SYSTEM WITHIN RANGE. ALIGNMENT CHECK TO BE CARRIED OUT PREFERABLY BY LASER METHOD. AND COMPETENT TEAM AND SHOWN TO SURVEYOR. ALL CONSUMABLES, LASER SIGHTING AND STAGING ARE COVERED IN CONTRACTOR SCOPE.
SRI SRINIVASA ENGINEERING WORKS
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .