Tender ID
Tender Value
₹5.4 L
EMD Value
₹5,433
Closing Date
11 Feb 2026, 6:00 pmClosed
Executive Engineer, P.H. Works Division , GWSSB, Anjar
Construction of 1.5 lac. Litter capacity RCC HGLR for village Bhadroi under Anjar Regional Water Supply Scheme. (Under Maintenance & Repair 2025-26)
270219
16/2025-26
Open
Civil Works - Water Works
Works
Kutch
7 documents required · 7 mandatory
₹900
The Executive Engineer, P H Works Division, GWSSB, Anjar – Kutch
₹5,433
28 Jan 2026
28 Jan 2026
28 Jan 2026
11 Feb 2026
28 Jan 2026
Name of Work : Construction of 1.5 lac. Litter capacity RCC HGLR for village Bhadroi under Anjar Regional water
Supply Scheme. ( Under Maintenance & Repair 2025-26.)
Item Description Quantity Unit Tender Rate Total Amount
Item Description Quantity Unit Tender Rate Total Amount
The structural design of GSR shall be in accordance with provisions
(1) I.S. 3370 part I & II 2009 or latest revised
(1.1) I.S. 3370 part III & IV 1965 or latest revised
(2) I.S. 456 – 2000 or latest revised.
(3) I.S. 1893 – 2000 – 1984 or latest revised.
(4) I.S. 875, Part – 1 to 3, 1987 or latest revised.
General Specifications:-
(1)Waterdepth incontainershallbeadoptedasperdataof tender.Capacity
shallbecalculatedexcludingfreeboardof the reservoir. If water depth isnot
specified, thesuitablewaterdepth/ acceptableto fieldengineer inaccordance
with hydraulic.
(2) Shape of container (in plan) specified by in data shall be adopted
in absence circular shape shall be adopted.
(3) Size shall be fixed as per availability of space (land area) at site /
acceptable engineer in charge.
(4) Effect of overlapping of pressure bulbs on soil due near by
structure and proposed sump should be considered.
(5) Care shall be taken that no damage should occur to nearby existing
structure. Compensation shall be paid for the same by agency.
(6) The minimum concrete grade for RCC shall be M-30
(7) HYSD Fe 415 / 500 grade reinforcing bars confirming to I.S.
/ 1139 shall be considered in design. CRS / TMT bars shall be provided.
In saline atmosphere corrosion resistance stainless steel / HCR rebar shall
be provided. Any other steel can be used with approval of C.E./in
situation of non availability in market without extra cost.
(8) Minimum size (or thickness) of various components shall be
provided as per tender criteria / specifications in absence as per I.S./ Std.
practice of G.W.S.S.B. Minimum dimensions specified for various
components in tender data / specifications shall be provided without fail.
(9) The safe bearing capacity (SBC) shall be referred from SBC test
report. In absence of report it shall be referred from data sheet. If poor soil
is found / water table is met with during excavation SBC shall be
scientifically ascertained and design shall be revise. No extra shall be paid
for increase in quantity.
(10) CI pipes and special shall only be used if type is not specified in
(11) The rate shall include cost of dewatering during excavation making
all arrangement when water table meets within depth.
(12) The structure shall be designed properly to resist uplift due to
ground water table specified in data or actual ground water table meets
with during excavation. If GWT / Uplift is mentioned in tender and during
excavation it dose not meet 7.5% rate shall be reduced.
Item Description Quantity Unit Tender Rate Total Amount
Item Description Quantity Unit Tender Rate Total Amount
(13) SS pipes railing shall be provided over sump perifery when sump
height is ≥ 1.5 meter above ground level.
(14.a) RCC staircase/RCC Steps should be provided from GL to sump top
slab based on the height of the GSR above/below the ground.
Item Description Quantity Unit Tender Rate Total Amount
Item Description Quantity Unit Tender Rate Total Amount
(14.b) RCC Staircase with SS railing to be provided inside reservoir
container. BB Masonry stair cabin to be provided to cover the same with
MS safety door having locking arrangement.
(15) Appearance of structure should be aesthetically good looking
acceptable to authority.
(16) Any charge in size, shape, depth below GL, height above GL, water
depth, F.B., size of member etc can be permitted in exceptional case due
to site condition or hydraulic design requirement by C.E. No extra shall be
paid for change.
(17) Any charge in data, dimensions, shape, water depth, reduction in
size if permitted by competent authority and if it reduces quantity then
payment shall be reduced prorate.
(18) When capacity of GSR / Sump is > 20 lakh liters two or suitable
compartments acceptable to executive engineer shall be designed and
(19) Agency shall engage qualified (at least graduate) consulting
engineer for designing the structure and he / she shall visit the site for
guidance of work.
(20) 75% part rate shall be payable for concrete, reinforcement and
plastering items of container until satisfactory hydraulic testing for water
tightness is performed as per tender condition. Till the work shall be
treated as incomplete.
Above conditions / general specifications Sr. No. 1 to 20 are part and
parcel of tender (contact) and prevail over other provisions in tender.
Capacity of GSR/Sump
Cost of 1.5 lacs litre capacity
Capacity of GSR/Sump
Cost of 1.0 lacs litre capacity 1.00 No 380598.13
Cost of 0.5 lacs litre capacity 50000.00 liter 3.04
For GSR(U/G sump) with cover slab to be constructed at site situated
in seismic zone V, the above rates shall be increased by 2%
Deputy Executive Engineer
P H S Sub Division
I / We am / are willing to carry out at -------------- % above / below
................................... ( Percent should be written in figures and words )
Estimated amount Rs.5,43,250.09 Estimated amount Rs.5,43,250.09
Tender Amount in Rs. :- ………………………… Tender Amount in Rs. :-…………..
In words Rs. :- ……………………….. In words Rs. :- …………………
Contractor Signature Executive Engineer
P H Works Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Vol 1A Tech Bid.pdf
03 Vol 2A extent of work.pdf
04 Vol 2B Tech Specification.pdf
05 Vol 2c Data Sheet.pdf
06 vol 3 Price Bid.pdf
07 Vol 4 Drawing.pdf
Schedule A.pdf
Schedule B.pdf
02 Vol 2 B GCC_compressed.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .