Loading…
Loading…
Tender Value
₹1.3 L
EMD Value
₹2,600
Closing Date
19 Jun 2026, 4:00 pm
Executive Engineer INFC Division Kargil
Executive Engineer INFC Division Kargil
Construction of Balance work of Branch channel of Yokyur Khul Pasburchay from RD 60 0-105 Mtr under CAPEX
2026_PWD_19023_2
e-Tender 09 of 2026-27/INFC Kargil
Open Tender
Civil Works - Canal
30 days
Pasburchay
Ref To NIT
4 documents required · 4 mandatory
₹20
Executive Engineer INFC Division Kargil
₹2,600
4 Jun 2026
4 Jun 2026
20 Jun 2026
4 Jun 2026
19 Jun 2026
4 Jun 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Earth work in excavation by manual means in foundation trench or drains (not exceeding 1.5m in weadth or 10 sqm on plan )including dressing of sides and ramming of bottoms ,lift upto 1.5m ,including getting out the excavated soil and disposal of surplus excavated soil as directed ,within a lead of 50m | |||||
| 1.01 | All Kind of soil 70% | 8.5 | Cum | 295.2 | ₹2,509.2 |
| 1.02 | Ordinary Rock 25% | 3.03 | Cum | 616.16 | ₹1,866.96 |
| 1.03 | Hard Rock (B.P) 5% | 0.6 | Cum | 1,146.72 | ₹688.03 |
| 2 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:3:6 (1 cement: 3 coarse sand : 6 graded stone aggregate 20mm nominal size | 12.37 | Cum | 5,243.49 | ₹64,861.97 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering - All work upto plinth level 1:2:4 (1 cement: 2 coarse sand : 4 graded stone aggregate 20mm nominal size | 11.25 | Cum | 344.92 | ₹3,880.35 |
| 4 | Centering and shuttering incld.strutting propping etc. and removal of from for wall any thickness incld. Attached pilaster, buttresses plinth and string coarse ect walls of any thickness | 94.5 | Sqm | 407.58 | ₹38,516.31 |
| 5 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth, consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m | 2 | Cum | 167.6 | ₹335.2 |
| 6 | Dumping /Filling of stones in horizontal level excluding cost of stone | 2.16 | Cum | 207.55 | ₹448.31 |
| 7Carriage of material from source to site of work including loding un loading and stacking complete | |||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.98 MB
BOQ_45375.xls
BOQ • 0.48 MB
Download all tender documents and submit your bid