| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹80.5 LAccepted-AOC 245 2 RAJPUR ROAD OPPOSITE HOTEL MADHUBAN DEHRADUN | L1 | Accepted-AOC Qualified | |
| 2 | L2₹82.4 L+₹1.9 L (2.31%)Rejected-Finance | L2 | Rejected-Finance Not Qualified | |
| 3 | L3₹89.9 L+₹9.3 L (11.6%)Rejected-Finance A 3 332 SECTOR 08 ROHINI DELHI 110085 | DELHI | NORTH WEST DELHI | DELHI | 110085 | L3 | Rejected-Finance Not Qualified |
Tender Value
Refer Docs
EMD Value
₹1.6 L
Closing Date
5 Apr 2023, 2:00 pmClosed
SE
EDC TEHRI
Up-gradation of Distribution Substation to Compact Secondary Substation at Purnanand School Ganga Resort road Munikireti on existing 400KVA plus 100 KVA transformer to 1000 KVA CSS at Ganga Resort road Munikireti for the G-20 programme under EDSD MKR
2023_UPCL4_56792_1
67/EDCT/2022-23
Open Tender
Miscellaneous Services
Item Wise
60 days
TEHRI
Please refer Tender documents.
3 documents required · 3 mandatory
₹5,900
Yes
EE ETD
₹1.6 L
Yes
27 Jul 2023
27 Mar 2023
6 Apr 2023
27 Mar 2023
5 Apr 2023
27 Mar 2023
Material
STP SP 33 Pole (Galvanized)
11 KV XLPE cable 3C*300 sqmm
M.S. Channel 100*50 mm
M.S. Angle 65*65*6 mm
ACSR Rabbit Conductor
11KV Polymer Pin insulator with Pin
11KV Dics fitting R/W 45kN
11KV Polymer Disc insulator
Supply of 11/0.433kV 1000 KVA Compact Secondary Substation as per Technical Specifications
LT XLPE Alu Armoud cable 3.5*400 sqmm.
LT Air Bunch Cable 3*150+1*95 sqmm
Suspension & Dead End Clamp with mounting arrangement
Insulation Piercing Connector for 3x150 sqmm
HT Termination Kits-indoor- 3C*300 sqmm 11KV
HT Termination Kits-outdoor- 3C*300 sqmm 11 KV
3.5C*400 sqmm LT AL Lugs
Al LT Glands 48-63MM double compression for 400Sq MM Cable
Chemical Earthing incluiding Cooper bonded earthing road 3000 mm length and 20 mm dia and 25 kg 2 nos chemical bag
100mm Dia Gi Pipe For HT Cable termination from HT Pole to CSS
Pole Clamp For LT Cable mounting on Pole
MS nut &bolt off size
PP Holding Clamp with Nut & Bolt for SP-33
3 Ph. 4 w LT Distribution Box with Clamp and Nut bolt
Installation
Fabrication of MS Angle/Channel
Excavation of earth for pole pit of size .9x.6x1/6 of full length of pole for errection of pole in all type of soil including proper dressing of sides and ramming of bottom including getting out of the excavated soil and disposal of surplus excavated soil as directed complete work
i). SP-33 Pole (Single Pole)
Errection of following type of pole in proper level and alignment along with fixing of all accessories , top channel & clamp including CC Grouting of pole and making complete fitting of all acc. Complete
i). SP-33 Pole (Double Pole)
Grouting of pole in size 0.45x0.45x1/9 of support in cc ratio 1:4:8 block including cost of cement sand and stone blast back filling of soil and boulder in pit and ramming and proper alignment leveling
i). SP-33 Pole (Single Pole)
Dismentalling of gaurding from 11KV line
Dismentalling of old existing 11KV Rabbit conductor line
Dismmantling of Old & used 400KVA T/F from old existing plinth and opening of all connection at both ends i.e. HT/LT side with proper stacking at safe place
Dismmantling of Old & used 100KVA T/F from old existing plinth and opening of all connection at both ends i.e. HT/LT side with proper stacking at safe place
Dismentalling of Fuse set on double pole structure
Dismentalling of TPMO set from double pole structure
Safe Dismentalling of MCB Pannel set with LT PRMC complete with opening connection
Safe Dismentalling of ACB Pannel set complete with opening connection
Making of temp. SS Structure complete with all Supporting Work with Temp. fencing Protection For 400 kva & 100 KVA TF During The CSS Errection Work And Dismental After Completion of work.
Head load cartage of 400 KVA TF from Old place to new installation place site to road site avg distance 0-1Km
Head load cartage of 100 KVA TF from Old place to new installation place site to road site avg distance 0-1Km
Cartage of old & used 400 KVA T/F from old place work site to new installation site with loading and unloading at both ends and proper stacking (0-20Km.)
Cartage of old & used 100 KVA T/F from old place work site to new installation site with loading and unloading at both ends and proper stacking (0-20Km.)
Installation of new/repaired 400 KVA T/F on temp arrangement station with complete fitting of all accessories and making all connection at both ends HT/LT complete in all respect
Installation of new/repaired 100 KVA T/F on temp arrangement station with complete fitting of all accessories and making all connection at both ends HT/LT complete in all respect
Mounting & Fixing of Fuse set on DP structure including connection with all complete work
Mounting & Fixing of ACB/MCB structure including connection with all complete work at new location
Laying of LT XLPE cable 1x400 Sq.mm. from pole to Meter cubical box making all connection complete
Laying of LT XLPE cable 1x120 Sq.mm. from pole to Meter cubical box making all connection complete
Laying, stringing & Re-sagging of ACSR Rabbit conductor in 11KV Line 3P4W
Resagging of Guarding of 11KV line complete
Dismantle of old transformer plinth & Fencing and remove all garbage material From work site to dumping site with all spporting work for Erection of CSS Plinth. Foundation
Erection of CSS Plinth of CC/ MS Struction as per site requirement , Including color wash on Plinth or MS Structure
Erection ,providing And Fixing of wire mesh of size 50x30mm around plinth and toe wall duly welded with frame of MS angle Iron 35x35x6 mm and strip of size 35x6 mm in mid of eac side along with wire mesh, with the height of 0.5 mtr above the plinth and 2 mtr. above the toe wall with 2 No. Gate(HT/LT Side) with locking arrangement. in the toe wall size including frouting 6 no. legs in ratio in block of size 0.25x0.25x0.45mtr. including gravlling of single of size 20 to 40 mm anf complete painting of wire mesh with Two coat Al. Paint(including all material rate)
Erection & Commissioning of 11/0.433kV 1000 KVA Compact Secondary Substation as per Technical Specifications
Erection & Commissioning of 11 KV 3C x 300 sqmm XLPE Armoured cable
Erection & Commissioning of LT XLPE Alu Armoud cable 3.5 x 400 sqmm.
Erection of LT Air Bunch Cable 3x150+1x95sqmm
Erection of Suspension & Dead End Clamp with mounting arrangement
Erection of Insulation Piercing Connector
Erection and Insulation of 3 Ph 4W LT Distribution Box
Disconnection and reconnection of consumer service cable Single & Three phase
Erection & Commissioning of HT Termination Kits-indoor- 3C X 300sqmm 11KV
Erection & Commissioning of HT Termination Kits-outdoor 3CX300sqmm 11 KV
Erection & Commissioning of 3.5C X 400 sqmm LT AL Lugs
Erection & Commissioning of 48-63MM double compression Al LT Glands for 400Sq MM Cable
Erection & Commissioning of Chemical Earthing incluiding Coper bonded earthing road 3000 mm length and 20 mm dia and 25 kg 2 nos chemical bag
Erection of 100mm Dia Gi Pipe For HT Cable termination from HT Pole to CSS
Erection Pole Clamp For LT Cable mounting on Pole
Providing and Fixing of Danger Board
Painting of SP-33 Pole Structure Complete with all MS Fitting
Safe Cartage of all material from store site to work site (excluding CSS TF)
Dismantling
Dismantaling of Conductor with Opening Jumpering Binding Then Bundling Complete.
Dismantaling/cutting of Double Pole structure rail pole
Dismantaling of DTR 400 KVA from temp SS
Dismantaling of DTR 100 KVA temp SS
Dismantaling of ACB/MCB panel temp SS
Safe Back Cartage of all Dismantaled DTR 400KVA from work site to Store centre Rishikesh/JE store with loading and unloading at both ends (dist aprox 0-20km)
Safe Back Cartage of all Dismantaled DTR 100KVA from work site to Store centre Rishikesh/JE store with loading and unloading at both ends (dist aprox 0-20km)
Safe Back Cartage of all Dismantale, MS maltable scrap from road site to Store centre Rishikesh with loading and unloading at both ends (dist aprox 0-20km)
GST EXTRA
Composite Engineers
Creative Entrepreneurs LLP
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .