Tender Value
₹3.2 Cr
EMD Value
₹6.5 L
Closing Date
4 Sept 2026, 3:00 pm7d left
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Revenue
TRACK TEND
17 conditions · 4 needing a document upload
Financial Eligibility Criteria: as per Clause 10.2 of Part-I of IRSGCC- 2022and as per Railway Board Advance correction slip No.1 dated 14-07- 2022The tenderer must have minimum average annual contractual turnoverof V/N or "V" which ever is less: where V= Advertised value of the tenderin crores of Rupees N= Number of years prescribed for completion ofwork for which bids have been invited. The average annual contractualturnover shall be calculated as an average of "total contractualpayments" in the previous three financial years, as per the auditedbalance sheet. However, in case balance sheet of the previous year isyet to be prepared/ audited, the audited balance sheet of the fourthprevious year shall be considered for calculating average annualcontractual turnover. The tenderers shall submit requisite information asper Annexure-F (Annexure-VIB of GCC), along with copies of AuditedBalance Sheets duly certified by the Chartered Accountant/ Certificatefrom Chartered Accountant duly supported by Audited Balance Sheet
Financial Eligibility Criteria: As per Clause 10.2 of IRSGCC-2022 (As perAdvanced Correction slip No,1 dated. 14.07.2022 to GCC-2022) and thesame is mentioned in para no.10.2 page no. 15 of this tender document.Tenderer should attach Self-attested/ Digitally signed copy of Certificateshowing minimum average annual contractual turnover as per AnnexureVIB of IRSGCC-2022 (As per Advanced Correction slip No,1 dated.14.07.2022 to GCC-2022) in Annexure - "F"Page-32 of Master Document -1 attached to the tender
F 1 (a & b): "Any railway track work includingtrack maintenance work"""as per HQrs letter No. W.148/P/SNW/2025 ,dated 02.12.2025,
Technical Eligibility Criteria: as per Clause 10.1 of Part-I of IRSGCC- 2022(a) The tenderer must have successfully completed or substantiallycompleted any one of the following categories of work(s) during last 07(seven) years, ending last day of month previous to the one in whichtender is invited: (i) Three similar works each costing not less than theamount equal to 30% of advertised value of the tender, or (ii) Two similarworks each costing not less than the amount equal to 40% of advertisedvalue of the tender, or (iii) One similar work costing not less than theamount equal to 60% of advertised value of the tender
(b) (1) In case of tenders for composite works (e.g. works involving morethan one distinct component, such as Civil Engineering works, S&Tworks, Electrical works, OHE works etc. and in the case of major bridges -substructure, superstructure etc.), tenderer must have successfullycompleted or substantially completed any one of the following categoriesof work(s) during last 07 (seven) years, ending last day of monthprevious to the one in which tender is invited: (i) Three similar workseach costing not less than the amount equal to 30% of advertised valueof each component of tender, or (ii) Two similar works each costing notless than the amount equal to 40% of advertised value of eachcomponent of tender, or (iii) One similar work each costing not less thanthe amount equal to 60% of advertised value of each component oftender. Note for b(1): Separate completed works of minimum requiredvalues shall also be considered for fulfilment of technical eligibilitycriteria for different components. (b)(2) In such cases, what constitutes acomponent in a composite work shall be clearly pre- defined withestimated tender cost of it, as part of the tender documents without anyambiguity. (b) (3) To evaluate the technical eligibility of tenderer, onlycomponents of work as stipulated in tender documents for evaluation oftechnical eligibility, shall be considered. The scope of work covered inother remaining components shall be either executed by tendererhimself if he has work experience as mentioned in clause 7 of 1.1.1 theStandard General Conditions of Contractor through subcontractorfulfilling the requirements as per clause 7 of the Standard GeneralConditions of Contract or jointly i.e., partly himself and remainingthrough subcontractor, with prior approval of Chief Engineer in writing.However, if required in tender documents by way of Special Conditions, aformal agreement duly notarised, legally enforceable in the court of law,shall be executed by the main contractor with the subcontractor for thecomponent(s) of work proposed to be executed by the subcontractor(s),and shall be submitted along with the offer for considering subletting ofthat scope of work towards fulfilment of technical eligibility. Suchsubcontractor must fulfill technical eligibility criteria as follows: Thesubcontractor shall have successfully completed at least one worksimilar to work proposed for subcontract, costing not less than 35%value of work to be subletted, in last 5 years, ending last day of monthprevious to the one in which tender is invited through a works contract.Note: for subletting of work costing up to Rs 50 lakh, no previous workexperience of subcontractor shall be asked for by the Railway. In caseafter award of contract or during execution of work it becomes necessaryfor contractor to change subcontractor, the same shall be done withsubcontractor(s) fulfilling the requirements as per clause 7 of theStandard General Conditions of Contract, with prior approval of ChiefEngineer in writing
Note for Item 10.1 of IRSGCC-2022: Work experience certificate fromprivate individual shall not be considered. However, in addition to workexperience certificates issued by any Govt. Organization, workexperience certificate issued by Public listed company having averageannual turnover of Rs 500 crore and above in last 3 financial yearsexcluding the current financial year, listed on National Stock Exchange orBombay Stock Exchange, incorporated/registered at least 5 years prior tothe date of closing of tender, shall also be considered 1.1.2 provided the workexperience certificate has been issued by a person authorized by thePublic listed company to issue such certificates. In case tenderer submitswork experience certificate issued by public listed company, the tenderershall also submit along with work experience certificate, the relevantcopy of work order, bill of quantities, bill wise details of paymentreceived duly certified by Chartered Accountant, TDS certificates for allpayments received and copy of final/last bill paid by company in supportof above work experience certificate
18 conditions · 7 needing a document upload
Please enter the percentage of local content in the materialbeing offered. Please enter 0 for fully imported items, and 100for fully indigenous items. The definition and calculation of localcontent shall be in accordance with the Make in India policy asincorporated in the tender conditions.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
Tender value is including escalation of (-)15% (minus fifteenpercent ) on CPWD DSR rates. Tenderer should note this beforequoting the rates
The original Bank Guarantee (in lieu of Bid Security) should bedelivered in person to the official nominated (i.e.OS/Tenders/Engg)/BZA Division) as indicated in the tenderdocument before closing date for submission of bids (i.e.excluding the last date of submission of Bids)
All the instructions furnished in the Technical Compliance /Commercial Compliance / Custom / Undertakings / GeneralInstructions are only indicative and not exhaustive. The tenderershall read the GCC / Tender documents for complete details.
The tenderer shall thoroughly go through the entire tenderdocument and strictly adhere to the instruction and directionsgiven therein
BZA-GDR section:Proposed safety related track maintenance works and other miscellaneous track works in ADEN/NLR Sub-division of Sr.DEN/South/BZA Jurisdiction.
E-15-south-NLRSafety-2026~SCOR
E-15-south-NLRSafety-2026
Open
Works - General
12 Months
Krishna, Andhra Pradesh
₹0
₹6.5 L
13 Aug 2026
13 Aug 2026
21 Aug 2026
56 items across 4 schedules · ₹2,79,57,935.12 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | By using Railway's Grease graphite | Each | 40500.00 | 26.99 | 10,93,095 |
| 2 | GRSP | Each | 2700.00 | 17.85 | 48,195 |
| 3 | ERCs | Each | 3600.00 | 5.96 | 21,456 |
| 4 | Metal/GFN Liners | Each | 3400.00 | 3.97 | 13,498 |
| 5 | For 1 in 12 Turnouts | Set | 65.00 | 6,457.78 | 4,19,755.7 |
| 6 | For 1 in 8.5 Turnouts | Set | 16.00 | 5,166.22 | 82,659.52 |
| 7 | For 1 in 12 Turnouts (Sleeper No 65 to 73 ) | Set | 50.00 | 1,148.17 | 57,408.5 |
| 8 | For 1 in 8.5 Turnouts (Sleeper No 43 to 48) | Set | 20.00 | 918.54 | 18,370.8 |
| 9 | Boxing and profiling of ballast as procedure prescribed in latest edition IRPWM including cess dressing on both sides of track. The work will include removing excess ballast from track and putting same in crib and shoulder by leading to maximum of 50m including crossing of track, deweeding on ballast section etc and directed by Engineer-In charge. | per TRM of the a as | 205000.00 | 22.66 | 46,45,300 |
| 10 | For PSC sleeper Track with Sleeper Density 1540 Sleepers/Km or more | of TRM | 8500.00 | 89.98 | 7,64,830 |
| 11 | For PSC Sleeper | TRM | 18000.00 | 77.12 | 13,88,160 |
| 12 | 1 in 8½ PSC layout | Set | 13.00 | 9,887.36 | 1,28,535.68 |
| 13 | 1 in 12 PSC layout | Set | 35.00 | 12,857.58 | 4,50,015.3 |
| 14 | Slack picking of joint sleepers and 3 approach sleepers on either sides giving required lift make up general track level, packing profiling as directed. | Each to and | 376.00 | 487.46 | 1,83,284.96 |
| 15 | For PSC sleeper Track with Sleeper Density 1540 sleepers/Km or more | of TRM | 1750.00 | 153.29 | 2,68,257.5 |
| 16 | With Contractor's hard wood block. | Each | 250.00 | 2,239.07 | 5,59,767.5 |
| 17 | Cleaning of side drains along the track including disposing of muck beyond Railway boundary as per instructions of Engineer charge to keep drains clean and clear cuttings etc. | RM in- in | 14000.00 | 27.86 | 3,90,040 |
| 18 | Removing weeds & bushes in ballast section and cess up to 3.95m from centre line track in mid section & station yard, specified by Engineer in-charge including disposal of branches, bushes outside cess/yard. | TRM of as | 210000.00 | 12.82 | 26,92,200 |
| 19 | For day time block working | TRM | 95000.00 | 16.42 | 15,59,900 |
| 20 | For night time block working | TRM | 23000.00 | 18.4 | 4,23,200 |
| 21 | 1 in 8½ Turnouts (Under Traffic Block Conditions) | Set | 60.00 | 8,057.73 | 4,83,463.8 |
| 22 | 1 in 12 Turnouts (Under Traffic Block Conditions) | Set | 144.00 | 9,376.4 | 13,50,201.6 |
| 23 | 1 in 16 Turnouts (Under Traffic Block Conditions) | Set | 2.00 | 12,188.88 | 24,377.76 |
| 24 | Carrying out ancillary works required for UTV working under line block i.e., turning of rails/ Sleepers and keeping in position for fixing UTV clamps to rail, keeping rails/PSC Sleepers in position while loading into BFR, removal clamps on BFR for releasing loaded rail/Sleepers, adjusting of rails/Sleepers BFR etc. by providing minimum of three men in a shift of 8 hours, with all contractor's tools, all lead, lift, crossing of tracks etc., complete and as directed by the engineer - - charge. Note: In case, contractor provides less no. of Labour, payment will be deducted for each such person @ 2/3 rd of accepted item rate. | Shift of of on in the | 90.00 | 1,970.65 | 1,77,358.5 |
| 25 | CSM / DUO / 3X with or without DGS (7.5 KVA generator and 8x500 W) | Night | 75.00 | 3,310.06 | 2,48,254.5 |
| 26 | For lead beyond 500 metre and up to 1 Km | MT | 300.00 | 382.26 | 1,14,678 |
| 27 | Rails, switches, crossings, SEJ, Glued Joints, Check Rails etc. | MT | 300.00 | 329.1 | 98,730 |
| 28 | All type of PSC sleepers | MT | 300.00 | 359.4 | 1,07,820 |
| 29 | P.Way fittings of all types and other similar loose items | MT | 300.00 | 333.41 | 1,00,023 |
| 30 | With Contractor's hard wood block | Each | 90.00 | 2,736.89 | 2,46,320.1 |
| 31 | Clearing waterway of major & minor bridges by removing weeds / shrubs / bushes, removing silt deposit, filling scours, if any to 10 metre from centre of bridge on either side including disposing waste and silt away from waterway. Note: Rate is for a single line and per metre of bridge span. | Metre up | 140.00 | 184.57 | 25,839.8 |
| 32 | Supplying and spraying in specified proportion Weedicide Chemical, capable kill entire weed on track / cess / embankment with all labour, material, tools & plants etc. complete job in all respect. Scientific name the chemical is Isopropylamine Salt Glyphosate, in which active ingredient Glyphosate (41%), colour is light amber brownish, very low in toxicity and favourable environmental characteristics. will be ensured that no weed growth occurs up to six months period, otherwise spraying shall be done by the contractor free of cost. | Sqm to of of is to has It re- | 77000.00 | 0.58 | 44,660 |
| Schedule total | ₹1,82,29,656.52 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
masterdocument1aug2026.pdf
ATTACHMENT
masterdocument2aug2026.pdf
ATTACHMENT
ANNEXURE-I.15.pdf
ATTACHMENT
PAINTING15.pdf
ATTACHMENT
RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf revised approved
ATTACHMENT
safetyprecautions15.pdf
ATTACHMENT
Safetyrelatedtracksanctionedestimate-NLRsub-division.pdf
ATTACHMENT
SpecialconditionsforJCB.pdf
ATTACHMENT
SPECIALCONDITIONSFORTRACK.pdf
ATTACHMENT
YardsticksforSafetyworks.pdf
ATTACHMENT
RevisedApprovedlistofBrandsandMakes2026withallenclosures.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].