| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.7 LAccepted-AOC | ₹35.7 L Quoted ₹30.2 L | L1 | Accepted-AOC L1 |
| 2 | L2₹30.8 L+₹59,381.52 (1.96%)Rejected-AOC | ₹30.8 L+₹59,381.52 (1.96%) | L2 | Rejected-AOC L2 |
| 3 | L3₹30.9 L+₹70,015.35 (2.32%)Rejected-AOC GRAM KIRODA TALLA PO MUNNA DEVAL DISTRICT RUDRAPRAYAG | ₹30.9 L+₹70,015.35 (2.32%) | L3 | Rejected-AOC L3 |
| Sl No | Description | Qty | Unit | UDAY SINGH L2 | DIGAMBAR SINGH L1 | RAJENDRA SINGH L3 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation by mechanical means (Hydraulic Excavator )/ manual means in foundation trenches or drains (not exceeding 1.5 m in width or10 sqm on plan)including dressing of sides and ramming of bottoms, lift upto 1.5m, including getting out the excavated soil and disposal of surplus excavated soil asdirected, within a leadof 50 m,all kinds of soil. | 95.97 | Cum | 220.3 ₹21,142.19 | 220 ₹21,113.4 Lowest | 220.8 ₹21,190.18 |
| 2.00 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth,consolidating each deposited layer by ramming and watering,lead up to 50 m and lift upto 1.5 m. | 50.73 | Cum | 166.1 ₹8,426.25 | 166 ₹8,421.18 Lowest | 167 ₹8,471.91 |
| 3.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size) | 23.79 | Cum | 5,772.8 ₹1,37,334.91 | 5,700 ₹1,35,603 Lowest | 5,773.9 ₹1,37,361.08 |
| 4.00 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 20 mm nominal size) | 0.52 | Cum | 6,676.69 ₹3,471.88 | 6,675 ₹3,471 Lowest | 6,675.8 ₹3,471.42 |
| 5.00 | Random rubble masonry with hard stone in foundation and plinth including levellingup with cement concrete 1:6:12 (1 cement: 6 coarse sand : 12 graded stone aggregate 20mm nominal size) at plinth level with Cement mortar 1:6 (1 cement : 6 coarse sand) | 16.26 | Cum | 6,195.9 ₹1,00,745.33 | 6,195 ₹1,00,730.7 Lowest | 6,196 ₹1,00,746.96 |
| 6.00 | Brick work with F.P.S. bricks of class designation 75 in foundation and plinth level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 6.48 | Cum | 6,044.2 ₹39,166.42 | 6,040 ₹39,139.2 Lowest | 6,044.28 ₹39,166.93 |
| 7.00 | Brick work with F.P.S. bricks of class designation 75 in superstructure above plinthlevel upto floor V level in all shapes and sizes in Cement mortar 1:6 (1 cement : 6 coarse sand) | 21.76 | Cum | 7,716.8 ₹1,67,917.57 | 7,700 ₹1,67,552 Lowest | 7,716.91 ₹1,67,919.96 |
| 8.00 | Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering,finishing and reinforcement - All work upto plinth level 1:1.5:3 (1 cement : 1.5 coarse sand : 3 graded stone aggregate 20 mm nominal size) | 30.98 | Cum | 7,665.85 ₹2,37,488.03 | 7,600 ₹2,35,448 Lowest | 7,666 ₹2,37,492.68 |
| 9.00 | Providing and laying in position specified grade of Reinforced cement concrete 1:1.5:3 work in walls (any thickness),including attached pilasters, buttresses, plinth and string courses,fillets, columns, pillars, piers,abutments, posts and struts etc. uptofloor five level excluding cost of centring,shuttering, finishing and reinforcement : 1:1.5:3 (1 cement:1.5 coars sand:3 graded stone aggregate 20 mm nominal size) | 6.28 | Cum | 9,197.3 ₹57,759.04 | 9,197 ₹57,757.16 Lowest | 9,197.5 ₹57,760.3 |
| 10.00 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). | 29.92 | Cum | 9,750.3 ₹2,91,728.98 | 9,750 ₹2,91,720 Lowest | 9,750.5 ₹2,91,734.96 |
Tender Value
₹38 L
EMD Value
₹1.1 L
Closing Date
15 Sept 2025, 12:00 pmClosed
EE RWD RUDRAPRAYAG
office EE RWD RUDRAPRAYAG
CONSTRUCTION OF TWO EXTRA CLASS ROOM AT GIC JAYANT KODIYALA
2025_RES_86739_6
1277 (1)/nit/rwd/2025-26 dt 28.08.25
Open Tender
Civil Works - Buildings
Item Wise
365 days
JYANT KODIYALA
Please refer Tender documents.
1 document required · 1 mandatory
₹2,950
EE RWD RUDRAPRAYAG
₹1.1 L
5 Mar 2026
1 Sept 2025
15 Sept 2025
1 Sept 2025
15 Sept 2025
1 Sept 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_102937.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .