| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.3 LAccepted-Finance | L1 | Accepted-Finance L1 | |
| 2 | L2₹13.1 L+₹1.8 L (16.2%)Rejected-Finance | L2 | Rejected-Finance L2 | |
| 3 | L3₹16.1 L+₹4.9 L (43.4%)Rejected-Finance | L3 | Rejected-Finance L3 | |
| 4 | L4₹16.7 L+₹5.4 L (48.1%)Rejected-Finance | L4 | Rejected-Finance L4 | |
| 5 | L5₹16.7 L+₹5.4 L (48.4%)Rejected-Finance | L5 | Rejected-Finance L5 |
Tender Value
₹19.0 L
EMD Value
₹40,000
Closing Date
26 Aug 2022, 3:00 pmClosed
Dy. Director General-VTS
Deep Bhavan, Directorate of Lighthouses and Lightships, VTS Directorate, Plot No-17, Sector-08, Gandhidham-370201
Replacement of 48 batteries (2V, 600AH each) and related equipment and procurement of other equipment of 3KWp solar power system for main light at Pirotan Lighthouse
2022_DGLL_705180_1
EMDVTS-08020/1/2020-Maint
Open Tender
Electrical Works
Works
90 days
Pirotan Lighthouse
As per NIT
10 documents required · 10 mandatory
₹0
₹40,000
Yes
Deep Bhavan, Gandhidham
9 Dec 2022
5 Aug 2022
29 Aug 2022
5 Aug 2022
26 Aug 2022
5 Aug 2022
11 Aug 2022
Amount
Replacement of 48 batteries (2V, 600AH each) and related equipment and procurement of other equipment of 3KWp solar power system
2V, 600AH, C10 Tubular battery, (HBL, Amaron, Exide)
5KVA/96V PCU Solar Inverter with MPPT Charge controller(Microtek, Luminous, waaree, Smarten, Statcon, UTL)
Transportation loading-unloading/Installation/Dismantling work details is as given below; (a) Sea Skill labour charges for Transportation (Boat and 4 wheeler)/ loading/unloading of 2V/600AH cell of 48nos 2V/600AH cell (weight of each cell is approx..46Kg) Upto Pirotan Lighthouse. Shifting all cells at Pirotan Island to Power house of Pirotan Light house. (b) Dismantling of existing 48 Nos 2V/400 AH cells and installation of the new 48Nos. 2V/600AH cells. (c)The new cells to be connected with new cable links and to be placed in new cell rack to be supplied by the bidder. (d) Supply and installation of new UG power cable of 2.5 sqmm, 3C, length approx. 65 Meters from tower to power house. (Layout Drawing attached) The old cable to be removed and new cable to be laid within the same day for maintaining the availability of the main light. The wiring of the cable to be made in standard casing capping. The underground portion of the cable to be laid in a PVC pipe with 2 inch/ 10kgf strength. The hole from back side of tower need to be filled with cement plaster after laying and installation of the new cable. (e) Supply of ACDB,DCDB and MCBs of standard required specification for 3KW Solar power system
Buyback of old 2V/400 AH cells
Shri Sai Samarth Technical Services
Green Power Solutions
Neelam Micro Electronics
KHODIYAR ENTERPRISE
Research Center For Sustainable Solution Pvt Ltd
PRAGNESH GOHIL
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .