Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.6 LAccepted-AOC VILLAGE DINAK P O KANAID TEHSIL SUNDERNAGAR | BILASPUR | HIMACHAL PRADESH | 174001 | L1 | Accepted-AOC Awarded to M/S BHARDWAJ ELECTRICAL CO. (L-1) which found lowest | |
| 2 | L2₹6.8 L+₹17,656.27 (2.67%)Rejected-Finance R O PURANA BAZAR KARSOG PO KARSOG TEH KARSOG DISTT MANDI H P 175011 | MANDI | HIMACHAL PRADESH | 175011 | L2 | Rejected-Finance L2 | |
| 3 | L3₹7.2 L+₹55,892.87 (8.46%)Rejected-Finance VILL SHANA PO SUB TEHSIL PANGNA DISTT MANDI HP | MANDI | HIMACHAL PRADESH | 175001 | L3 | Rejected-Finance L3 |
Tender Value
₹7.3 L
EMD Value
₹18,246
Closing Date
15 Mar 2025, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Er. Chander Mani Sharma (XEN ED HPSEBL Karsog)
Office of Sr. Executive Engineer,ED Karsog
Tender for Prov SOP for the Scheme Augmentation of WSS Dhar Kandloo, WSS Sans, WSS Baju Babi, WSS Mashog Kotlu in Grid MS in District Mandi (HP) Under Electrical Sub Division Churag.
2025_HPSEB_100758_1
184619/DB/2024-25-4816-25 Dated 24-02-2025
Open Tender
Supply and Erection
Item Wise
90 days
Churag
Please refer tender document
10 documents required · 10 mandatory
₹590
₹18,246
21 Apr 2025
28 Feb 2025
15 Mar 2025
28 Feb 2025
15 Mar 2025
28 Feb 2025
Erection Charges
Digging of Pit for 2 Nos Poles,Drilling of Holes In X Arms,Preparation of Platform Structure,Erection of D Pole,Concreting 1:1.5:3 (1 cement : 1.5 coarse sand): 3 graded stone aggregate 20 mm nominal size),Erection of Platform,Erection of X0Arms, Drop0Out,,Erection of 2 Nos Stay Set,Erection of Jumper ,Earthing for 3 Nos Earths ,Providing Earthing Conn. To G.O Switch, Lightning Arrestor Etc.& Poles,Prividing earthting to the Transformer, LT Box, Meter Box etc,Barbed Wire & Painting,Erection of 63kVA Transformer, LT Box, MCCB Switch, Cable, service Cable and Energy Meter complete in all respect
Manual Carriage Of Material For 63 KVA SUB-STATION Considering Average Distance From Road To Site Of Work (Avr.Lead =0.200 KM)
Supply Part of Sub Station
Distribution Transformer (Ordinary), 22/0.4 kV, 63KVA
Muffs (2000mm) with concerete filling
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for incommer line
MS Angle Iron (50X50x6 mm), Length: 2800 x1 Nos for LA's
X-Arm: [Channel Iron (75x40x6 mm), Length : 2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
Transformer Bed, Belting & Knee Bracing
X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer Bed
X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
MS Angle Iron (35X35x5 mm), Length : 460 x 2 Nos
MS Angle Iron (50X50x6 mm), Length : 950 mm x 2 Nos for Bed Knee Bracing
Transformer LT Dist Box and GO Switch fixing Assembly
MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
D.O Fuse Unit
Surge Arrester, 9 kV Station Class (Porcelain Type)
Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps etc.)
Stay set complete
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Pipe Earthing Set
6 SWG GI wire For Earthing
LT Distribution Panel Box with MCCB(100A, 25 kA, 4P)
Half Clamp (M.S. Flat 50X6 mm)
Full Clamps (M.S. Flat 50X6 mm)
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Aluminium Thimble
Copper Thimble 200 Amp
Danger Plate
Barbed Wire
LT Cable (3.5 Core) 70mm²
Energy Meter (3-Phase, 4-Wire) DLMS compliant 100/5A CT Type for 63KVA Transformer
Aluminium Paint.
Red Oxide
Chain Link fencing , Angle Iron ,Gate etc for transformer fencing(Ref Civil Work at Pg No
Erection part of HT Line
Manual Carriage Of Material For HT Line Considering Average Distance From Road To Site Of Work (Avr.Lead =0.200)i.e Total Span =0.270x0.200=0.054)
Survey Of 1 Km Line
Erection Charges Of Single Pole:-Digging Of Pit,Erection Of Pole,Filling Of Pit+Ramming,Drilling Of Holes X-Arm,Fixing Of Insulator, X-Arm,Knee Bracing Set, Top Clamp,Fixing Of Barbed Wire,Danger Plate,Painting Of Pole,complete in all respect
Erection Charges Of ACSR/AAAC 30MM2:-1KM SINGLE ACSR/AAAC 30MM2 .Laying Of Conductor.,Stringing & Sagging,Binding With Insulator complete in all respect
Erection Of Double Pole:-Digging Of Pit,Erection Of Pole,Filling Of Pit+Ramming,Drilling Of Holes X-Arm,Fixing Of Insulator, X-Arm,Knee Bracing Set, Top Clamp,Fixing Of Barbed Wire,Danger Plate,Painting Of Pole,complete in all respect
Erection Charges Of Stay Set:-Digging Of Pit,Fixing Of Stay Rod,Filling Of Pit,Nozzeling & Tighting complete in all respect
Erection Charges Of Earthing set :-Digging Of Pit,Fixing Of GI Wire To The Earth System,Filling Of Pit complete in all respect
Erection Charges Of GI Earth Wire:-AAAC 20 MM2 / AAC 25 MM2,Laying Of Conductor,Stringing & SaggingBinding With Insulator,complete in all respect
Fixing Of Jumper
Erection Of X-Arms, Drop-Out,GO Switch
Supply part of HT Line
ACSR 6/1/2.59 (30mm²) {Includes 3 conductor lengths for 3Φ and Additional 1% (Sag, Jumpering and wastage}
Muffs (2000mm) with concerete filling
Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side) x 8 structure
Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures
Pole Top Bracket [MSCI:100x50x6 mm- 100 mm]
22 kV Pin Insulators (Porcelain, 12 kV, 10 KN): 3 No per pole structure
Belt Set - MS Angle Iron: 50x50x6, Length :1800 mm x 2 No.
X-Bracing Set - MS Angle Iron: 50x50x6, Length: 2125 mm x 2 No.
X-Arm (Horizontal) - MS Channel Iron C type: 100X50x6, Length:2800mm x 2 No.] i/c tolerance of 100 mm either side) x 8 structure
Discs insulator sets on Dead End structures (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90 kN) including Dead End Clamps, Straight stapples & Bend Stapples etc.) x (3 No. conductors) x (2 No. sides)
22 kV Pin Insulators (Porcelain, 12 kV, 10 kN): 3 No per double pole structure
Stay set complete in all respect (i/c Stay Clamp) (1No. / Single Pole , 4 No. / Double Pole Structures)
Stay Wire (7/3.15 mm) (10.0 kg Per Stay Set)
HT Earthing set complete
Single Continous Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3% (Sag, Earthing, Cross lacing above road and wastage)} @ 0.102 kg/m
Eye Hook for earth wire
MS Angle Iron: 50x50x6, Length : 2800 mm for Road crossing
GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length : 460 mm
GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type
D.O Fuse Unit
Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro' structure: 2 No ]
Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro' structure: 2 No]
Danger Plate (250X200X1.6 mm)
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Barbed Wire
Red Oxide
Aluminium Paint
Erection Part of LT Line
Manual Carriage Of Material For 3 Phase LT Line Considering Average Distance From Road To Site Of Work (Avr.Lead =0.200 KM)i.e 0.200X 0.060=0.012 KM)
Erection Of Steel Pole:-Digging Of Pit,Drilling Of Holes In Pole X-Arm,Erection Of Pole,Erec. Of X-Arm ,Shackle Insulator,Filling Of Pit And Ramming,complete in all respect
Erection Charges Of ACSR/AAAC 50 MM2:- .Laying Of Conductor.,Stringing & Sagging,Binding With Insulator complete in all respect
Erection Charges Of Stay Set:-Digging Of Pit,Fixing Of Stay Rod,Filling Of Pit,Nozzeling & Tighting complete in all respect
Erection Charges Of Earthing set :-Digging Of Pit,Fixing Of GI Wire To The Earth System,Filling Of Pit complete in all respect
Erection Charges Of GI Earth Wire:-AAAC 20 MM2 / AAC 25 MM2,Laying Of Conductor,Stringing & SaggingBinding With Insulator,complete in all respect
Supply part of LT Line
ACSR 6/1/3.35 (50mm²) { 3% (Sag, Jumpering and wastage}
Muffs (2000mm) with concerete filling
Channel Iron (75x40x5) [Length- 1.50 Mtr + 0.2 Mtr]
Shackle Insulator (16 kN)
D-Iron (U- Clamps) with nut and bolts
Earth Knob
LT Stay Set (i/c Stay clamp)
Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set)
Full Clamps ( 1 No for Stay Set)
Half Clamp for X-arm
Earthing Set complete
Earth wire (GI, 8 SWG) {alongwith 2 wire lengths for avg. one road crossing @ 20 m and Additional 3%} for 3%Sag, Wastage & Cross Lacing @ 0.102 kg/m
Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm Φ or more (with flat and spring washers)]
Aluminium Paint
Red Oxide
Spiral PVC Spacer
Koyla Engineering Works (BID ID -500534)
VISHAL ELECTRICAL GOVT CONT (BID ID -500981)
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .