Loading…
Loading…
Tender ID
Tender Value
₹5.0 L
EMD Value
₹4,960
Closing Date
1 Apr 2026, 6:00 pmClosed
Executive Engineer Panchayat R and B Division Bhuj-Kachchh
CONSTRUCTION OF TOILET AND COUMPOUND WALL AT GIRLS PRIMARY SCHOOL, VILLAGE ANGIYA MOTA TA.NAKHATRANA (DMF/PMKKKY/2024-25)
290117
83-2025/2026
Open
Civil Works - Buildings
Works
Kutch
7 documents required · 7 mandatory
₹600
Yes
Executive Engineer Panchayat R and B Division Bhuj-Kachchh
₹4,960
Yes
25 Mar 2026
25 Mar 2026
25 Mar 2026
1 Apr 2026
25 Mar 2026
NAME OF WORK: CONSTRUCTION OF TOILET AND
COUMPOUND WALL AT GIRLS PRIMARY SCHOOL,
VILLAGE ANGIYA MOTA TA.NAKHATRANA
(DMF/PMKKKY/2024-25)
Deputy Executive Engineer
( R&B ) PanchayarSub Division
Nakhatrana-Kachchh
Sr. Secton Description Page No.
1 Invitation for Bid (IFB)
2 Section -1 Instructions to Bidders
3 Section -2 Qualification Information
4 Section -3 Conditions of Contract
5 Section -4 Contract Data
6 Section -5 Technical Specification
7 Section -6 Form of Bid
8 Section -7 Bill of Quantities
9 Section -8 Securities and Other Forms
10 Section -9 Drawings
11 Section -10 Documents to be furnished by Bidder
Sign.of the Contractor Sign. of the Executive Engineer
INVITATIONFORBID
Sign.of the Contractor Sign. of the Executive Engineer
NATIONAL COMPETITIVE BIDDING
1. The Executive Engineer, Panchayat (R&B) Division, Bhuj.Invites bids for the construction of
works detailed in the table.
The bidders may submit bids for any or all of the following works.
Package Nameof work Approximate Bid Cost of Period of #Class of
No. Value of works security document completion Registration/
(Rs.) (Rs.)1% Tender Categoryof
Fee contractor if
01 CONSTRUCTION OF 495828.68 4,960.00 600/- 3 Months b-verg m k s m
AT GIRLS PRIMARY
SCHOOL, VILLAGE
(DMF/PMKKKY/2024
2. Prospective/ Interested bidder maydownload theBidDocumentsfromwebsite
https://www.nprocure.comfreeofcosttilltheTimeandDateasmentionedononline NITat website
https://www.nprocure.com.#
3. However, Bidder who issubmittingthe BidOnlinewill have to paythe BidDocument Fee/ Tender
Fee through Demand Draft only of any Schedule Bank payable at Panchayat (R&B)
DivisionBhuj and in favour of‘ExecutiveEngineer, Panchayat (R&B) Division,Bhuj.Once the
Bid isreceivedonline,BidDocument/Tender Fee willnot be refundable.
The DemandDraftforBid Document/Tender feeandFDR/BankGuarantee
againstBidSecurity/EMDshallbesubmittedinelectronicformatthroughonline(byscanning)whileuploa
dingthebid,thissubmissionshallmeanthatbiddocument/tenderfeeandBidSecurity/EMDhasbeenreceiv
ed.Accordingly, theofferofonlythoseshallbeopenedwhoseBid Document/ Tender Feeand Bid
Security/EMDhavebeenreceivedelectronically.However, forthe purpose of realizationofDemand
Draft,and FDR/Bank Guarantee bidder shall send the same in original through R.P.A.D. so as to
reach to‘ExecutiveEngineer, Panchayat (R&B) Division,
Bhuj’within7Daysfromthelastdayofbidsubmission.
PenaltativeactionfornotsubmittingDemandDraft/FDR/BankGuaranteeinoriginal to
Executive Engineer/TenderInvitingAuthority by biddershall be initiated.
4. Bidsreceivedonline,will
beopenedonthetime,dateandplaceasspecifiedintheonlineNITatwebsitehttps://www.nprocure.comint
hepresence ofthebiddersortheir authorizedrepresentatives, who wish to
remainpresent.Iftheofficehappenstobeclosedonthedayofopeningofthebidsasspecified,thebidswill be
openedonthe next workingdayatthesametime and venue.
5. Aprebidmeetingwillbeheldon--/01/2024at12.00hrs.attheofficeofThe Superintending Engineer,
Surat (R&B) Circle, Opp. Dutch Garden, Nanpura,Surattoclarify
theissuesandtoanswerquestionson any matterthatmay be raised at that stage asstated
inclause9.2of‘instructionsto Bidders’of thebiddingdocuments.
6. # BidSecurity(EMD)isequalto1%ofEstimatedAmountputtobid/tenderandshould beroundedoff to
the nextthousandrupees.
7. OtherInformation isasunder:
A. Agenciescan prepareandedittheiroffersanumberoftimesbeforetheendofthe tender submission
dateand time.After thetender submission dateand time,the bidder cannotmodify / edit / withdraw
their submitted offer in any case. Nowritten oronline requestinthisregardshall be granted.
B. Offers inphysical formwill not be acceptedinany case.
Sign.of the Contractor Sign. of the Executive Engineer
C. DemandDraftpurchased bytheotherthenbidder andissuedafterthelast dateof submissionof
Bids, will not be consideredoraccepted.
D.The costincurredbythecontractorforthisofferforclarificationorattending discussion,
conferencesorsitevisitswillnotbereimbursedbytheEmployeror Engineer-in-Charge.
E. Conditional tender shallnot be accepted.
F. Any changes,addition,alternationmadeintheprescribedformattachedwithtender areliable to
G. Anychangein formator conditionalBankGuaranteewillnotbeacceptedandthe bidder will be
considerednon-responsive.
H. Allthebiddersareinstructedtofillininformationstrictlyinaccordancewiththe format
giveninthechecklist/qualificationdocument/tenderdocument.
I. Itismandatoryforthe biddersto supplyEach andEveryInformationasaskedstrictly
inelectronicformatatappropriate placesonly.
J. Blank/insufficient information shall betreated asnil informationand shall result in
disqualification.
K. Evenifthebidderhasbeenqualifiedinasimilarorlargersizeofprojectinthepast, itshall not be
deemedto be a ground/reasonfornot givingrequiredinformationfor thiswork/bid.
Informationsuppliedforearlierprojectsshallnotbeconsideredwhileevaluationofthisbid.The
Government willnotaskforanyotherinformation,unless it isfound absolutely necessary
bythe competentauthority.
M. If found necessary, thecontractor will be intimatedfor negotiation,
# For the works costing up to7.5crore(ROAD),7.0crore(BUILDING & BRIDGE)kindly
referto SSR-10-2015-17-C dated 03-02-2017
Fortheworkscostingunder7.5croreforRoad Worksand7.0crorefor Buildingand
BridgeWorksfollowingdocumentsshall besubmittedinelectronicformat onlythrough
onlineby scanning andthe(i)BidDocumentFee/ TenderFee(ii)BidSecurity/EMD
shouldbesentinoriginal totheTenderopeningauthoritythroughRPAD,soastoreach the
Executive Engineer within7 daysfromlastdayof submissionofBid.
(i) BidDocument Fee / Tender Fee
(ii) BidSecurity/EMD orValidEMD ExemptionCertificate of Appropriate
ClassofRegistrationof ApprovedContractors
(iii) RegistrationCertificate ofAppropriateClass
RegistrationCertificate of“b-verg m k s m ltd
(v) I /II /III,if required
(vi) WorkExperience, if necessary.
(vii) OtherDocuments, asrequired.
(Viii) Bank Solvency of current calendar year i.e.2026
Sign.of the Contractor Sign. of the Executive Engineer
INSTRUCTIONS TO BIDDERS
Sign.of the Contractor Sign. of the Executive Engineer
Section 1:InstructionstoBidders
Table ofClauses
No. A. General D. SubmissionofBids
1. ScopeofBid 8 19. Sealing& MarkingofBids
2. SourceofFunds 8 20. DeadlineforSubmission of
3. EligibleBidders 8 21. Late Bids
4. Qualification ofthe 8 22. Modification and
Bidder Withdrawal ofBids
5. One BidperBidder
6. Cost ofBidding 12 E. Bid Opening and Evaluation
7. Site Visit 12 23. Bid Opening
B. Bidding Documents 25. Clarification ofFinancial
8. Content ofBidding 13 26. Examination ofBids and
Documents Determination of
9. Clarification ofBidding 13 27. Correction ofErrors
10. Amendment ofBidding 14 28. Deleted
29. Evaluation and Comparison
OfFinancial Bids
C. PreparationofBids 30. Deleted
11. LanguageofBid
12. Documents Comprising 15 F. AwardofContract
13. Bid Prices 15 31. Award Criteria
14. Currencies of Bid and 16 32. Employer’s Right to Accept
Payment any Bid and to Reject any
15. Bid Validity 16 33. Notification of Award and
Signing of Agreement
16. Bid Security 16 34. Performance Security
17. Alternative Proposals By 17 35. AdvancePayment and
Bidders Security
18. Format and Signing of Bid 17 36. Dispute Review Expert
37. Correct or Fraudulent
Sign.of the Contractor Sign. of the Executive Engineer
1.1 TheEmployer(Named inAppendixtoITB)invites bidsfortheConstructionofworks(asdefined
inthesedocumentsand referredtoas‘theworks”)detailed inthetable
giveninIFB.Thebiddersmaysubmitbidsforanyoralloftheworksdetailedinthetablegiven in
1.2 Thesuccessful bidderwill beexpected tocompletetheworksby theintended completion date
specifiedin theContract data.
1.3 Throughout these bidding documents, the terms ‘bid’ and ‘tender’ and their derivatives
(bidder/ tenderer, bid / tender, bidding/ tendering, etc.) aresynonymous.
2. Source ofFunds
2.1 TheexpenditureonthisprojectwillbemetfromthebudgetofGovt.ofGujarat/ Govt.of India
forcentrallysponsoredprojects.
3. Eligible Bidders
3.1 This Invitation forBidsis open to all eligiblebidders.
3.2 Allbiddersshallprovidein Section2,
FormsofBidandQualificationInformation,astatementthattheBidderisneitherassociated,norha
sbeenassociated,directlyorindirectly, with the
consultantoranyotherentitythathaspreparedthe
design,specifications,andotherdocumentsfortheProjectorbeingproposedasProjectManagerfo
rtheContract.AfirmthathasbeenengagedbytheEmployertoprovide
consultingservicesforthepreparationorsupervisionoftheworks,andanyofitsaffiliates,shall not
beeligibleto bid.
4. Qualificationof the Bidder
4.1 Allbiddersshallprovidein Section2, FormsofBidandQualificationInformation,a preliminary
descriptionoftheproposed work method and schedule,including
drawingsandcharts,asnecessary.The proposed methodology should includea
programofconstructionbackedwithequipmentplanningand deploymentduly supported with
broad calculationsand qualityassuranceproceduresproposedto be adopted justifying their
capability of executionand completionofwork as per technical specifications, within
stipulatedperiodofcompletion.
4.5 QUALIFICATION CRITERIA:
(Applicable forthe works whichrequire Post Qualification)
4.5.1 QualificationwillbebasedonApplicant’smeetingallthefollowingminimumpass/
failcriteriaregardingthe Applicant’sgeneralandparticularexperience,personneland
equipment capabilities and financial positions, as demonstrated by the applicant’s
responses intheformsattachedtotheletterofapplication(specified requirement forjoint
venturesare givenunderpara4.6below) Subcontractors experienceand
resourcesshallnotbetakenintoaccountindeterminingthe applicants compliancewith the
qualifyingcriteria
Sign.of the Contractor Sign. of the Executive Engineer
Toqualifyformorethanonecontract,the applicant mustdemonstratehaving
experienceandresourcessufficienttomeettheaggregateofthequalificationcriteria foreach
contract givenin paragraphs 4.5.4,4.5.5and 4.5.9below
4.5.2 Base year and Escalation
The baseyearshall betaken as Current financial year
Following enhancementfactorswillbeused for thecostsofworksexecuted and the financial
figureto a common basevaluefor works completedin India.
Year Financial Year Enhancement factor
Base (year of inviting tender) 2023-24
Applicantshouldindicateactualfiguresofcostsandamountfortheworks executedbythem
without accounting fortheabove-mentioned factors.
Incasethefinancial figuresand valueof completed worksareinforeign currency
theaboveenhanced multiplying factorswillnot beapplied.Instead,the
currentmarketexchangerate(StateBankofIndiaBCSellingrateasonthelastdate of
submissionof the bid) will beapplied for the purposeof conversionof theamount in foreign
currencyintoIndia rupees.
4.5.3. General Experience.
TheApplicant shall meet with thefollowingminimum criteria:
(a) Achieved aminimum annual financial turnover(defined as billing forworksin
progressandcompletedinallclassesofcivil engineeringconstructionworks only) inany
oneyear,over thelastfiveyearsof theannual valueof contract/ contracts applied for.
(b) Experienceinsuccessfullycompleting or substantially completing atleastone
contractofhighway(road and /or bridgeworks)airport runwayofatleast40 percent
ofthevalueofproposedcontract within thelast fiveyears.
Theworksmay havebeenexecuted by theapplicantas
primecontractororasamember of a jointventureor asanominatedsub-
contractor.Assubcontractor, heshould haveacquired
theexperienceofexecutionofallmajoritemsofworks under theproposed contract.Incasea
projecthas beenexecutedby a joint venture; weighttowardsexperienceof theprojectwould
begiventoeach joint venturein proportion to their financial participation inthe joint
Substantiallycompletedworksmeansthoseworkswhichareatleast90%completedas
onthedateofsubmission(i.e.grossvalueofworkdoneuptothe
Sign.of the Contractor Sign. of the Executive Engineer
lastdateofsubmissionis90%ormoreoftheoriginal contractprice) and
continuingsatisfactorily.
Forthese,acertificatefromtheemployersshall besubmitted alongwiththe
applicationincorporating clearlythenameofthework,contractvalue,billing amount,dateof
commencementof works,satisfactory performanceof the contractorandanyother relevant
4.5.4. Personnel Capabilities.
Availabilityforhisworkofpersonnelwithadequateexperienceasrequired;asperAppendix.
4.5.5. EquipmentCapabilities
Based onthestudies carried outby theEngineer,theminimumsuggested major equipment to
attain the completion of works in accordance with the prescribed construction
scheduleisshown in theAppendix.
Thebiddersshould,however,undertaketheirownstudiesand furnishwith their
bid,adetailed construction planning and methodology supported withlayout and necessary
drawingsand calculationstoallowtheemployertoreview their proposals. The numbers, types
and capacitiesof each plant/equipment shall be shownintheproposalsalong withthe
cycletimeforeachoperationforthegiven production capacityto match therequirements.
4.5.6. FinancialPosition
TheApplicantshouldgiveundertakingthathe has access to, orhasavailable,liquidassets
(aggregateofworkingcapital,cashinhandanduncommittedbankguarantees)and/or credit facilities
up to25percent of thevalueof thecontract /contractsapplied.
4.5.7. Theaudited balancesheets forthelastfiveyears should besubmitted,whichmust
demonstratethesoundness oftheapplicant’sfinancialposition,showing long–term
profitabilityincluding anestimatedfinancialprojectionforthenexttwoyearsIfnecessary,the
employerwill make inquiries withthe applicant’sbankers.
4.5.8. Litigation History
TheApplicantshouldprovideaccurateinformationonanylitigationorarbitrationresultingfro
mcontractscompletedorunderexecutionbyhimoverthelast fiveyears.Aconsistent
historyofawardsagainst theApplicantoranypartnerofajointventuremayresultinfailure of
4.5.9. Disqualification
Even though the applicants meet the above criteria, they are subject to be
disqualifiediftheyhave:
Mademisleadingor falserepresentation in theforms,statements submitted,and/ or
Record of poor performancesuchasabandoning thework,rescinding ofcontractfor
whichthereasonsareattributable to thenon–performanceofthecontractor; consistenthistory of
litigationawarded againsttheapplicantor financialfailuredue tobankruptcy.Therescinding
ofcontractofajointventureonaccountofreasons otherthannon–performance,suchasMost
Experiencedpartnerof jointventure pulling out,courtdirectionsleading to breaking upofa
jointventurebeforethestart of work,whicharenotattributabletothepoor performance of
thecontractor will, however,not affect the qualification oftheindividual partners.
Sign.of the Contractor Sign. of the Executive Engineer
# 4.6 JOINT VENTURE: (Maximum 3Members i.e.1Lead& 2others) (Applicable only for
estimatedprojectcostof50Croreand above)
4.6.1. Joint ventures must comply with thefollowingrequirement: (a)
Followingaretheminimum qualification requirements:
Theleadpartnershallmeetnotlessthan50percentofallcriteriagiveninpara4.5.3&4.5.6abo
ve.Thejointventuremustcollectivelysatisfythecriteriaofpara4.5.3&4.5.6above.Theexperie
nceoftheotherjointventurepartnersshallbeconsideredifitisnotlessthan30percentofthequalif
yingcriteriainpara4.5.3&4.5.6above.
(ii) Individually each member must satisfy the requirements of para4.5.7 &4.5.8 above.
(b) Bid shallbesigned soas legallybindall partners,jointly and severally,and shall
besubmitted withacopy of thejointventureagreement providing thejointand several
liabilities with respect to thecontract.
4.6.2. Qualification of a joint venture does not necessarily qualify any of its
partnersindividually oras a partnerinany otherjoint venture. Incase dissolutionofajoint
venture,eachoneoftheconstituent firmsmay qualifyif theymeetallthequalification
requirements,subject tothewritten approvalof theEmployer.
4.7. BidCapacity.
Applicantswhomeettheminimum qualificationcriteriawill bequalified onlyiftheir
available bid capacity at the expected time of bidding is more than the total
estimatedcost oftheworks.Theavailable bidcapacity will becalculatedas under:
AssessedAvailable BidCapacity = (A*N*2-B), where
A = Maximumvalueofworkexecutedinanyoneyearduringthelastfiveyears (updated
tothepriceleveloftheyear indicated inappendix)taking into account
thecompletedas well as works in Progress.
B = Valueatcurrentpriceleveloftheexistingcommitmentsand
ongoingworkstobecompletedduringthenext(periodofcompletionofworkforwhich
bids areinvited);and
N= Numberofyearsprescribed forcompletionof theworksforwhich the bidsare invited.
Note: - InCaseofjointventure,the availablebidcapacitywillbeappliedfor
eachpartnertothe extentofhisproposedparticipationinthe executionofthe
4.8 Eventhoughthebiddersmeettheabovequalifyingcriteria,theyaresubjectto be
disqualifiedif theyhave:
- Made misleading or false representation in the forms, statements andAttachments
thesubmittedin proofthe qualification requirements;and/ or
Sign.of the Contractor Sign. of the Executive Engineer
- Record of poor performance such as abandoning the works, not properly
completingthecontract,inor date delay incompletion,litigation history,or financial
failures etc.;and/ or
- Participated in the previous bidding for the same work and had
quotedunreasonablyhighbidpricesandcouldnotfurnishrationaljustificationtothe
5. One bid per bidder
5.1. Eachbiddershallsubmitonlyonebidforonepackage.Abidderwhosubmitsor participates in
more than one bid (other than as asubcontractoror in cases of alternativesthathave been
permitted or requested) will causeall theproposalswith the bidder’s participation to
bedisqualified.
6. CostofBidding
6.1. Thebiddershallbearallcostsassociatedwiththepreparationandsubmissionofhis
Bidandthe Employer will in no caseareresponsibleandliableforthosecosts.
7.1. TheBidder,attheBidder’sownresponsibility and risk isencouraged tovisitand
examinetheSiteofworkanditssurroundingandobtainallinformationthatmay be necessary for
preparing theBid and enteringintoacontractfor constructionofthe Works.
Thecosts of visitingthesite shall beat theBidder’s own expense.
Sign.of the Contractor Sign. of the Executive Engineer
B. BIDDINGDOCUMENTS
8. ContentofBidding Documents
8.1 Theset ofbidding documents comprises thedocuments listedbelowandaddenda issuedin
accordancewith Clause10:
Section Particulars VolumeNo.
- Invitation forBids
1 Instructions to Bidders
2 Qualification Information,andother forms
3 Conditions of Contract
4 Contract Data
5 Technical Specifications II
6 Form ofBid III
7 Bill of Quantities
8 Securities andother forms
10 Documents to befurnishedbybidder V
8.2. VolumesI,II,III andIVareavailableonlineand documentsto be furnished bythe
bidderincompliancetosection2willbepreparedbyhimandfurnishedasVolume- Vin two parts
(referclause12).
8.3. Thebidderisexpected toexaminecarefullyallinstructions,conditionsofcontract,
contractdata,forms,terms,technicalspecifications,billof quantities, forms,Annexes
anddrawingsintheBidDocument.Failureto complywiththerequirementsofBid
Documentsshall beatthe bidder’sownrisk.Pursuanttoclause26 hereof,bids
whicharenotsubstantiallyresponsivetothe requirementsofthe BidDocuments shall
9. ClarificationBiddingDocuments
9.1 Aprospectivebidderrequiringanyclarificationofthe biddingdocumentsmay notify
theEmployer inwriting or throughE-mailattheEmployer’saddress
indicatedintheinvitationtobid.TheEmployerwillrespondtoany requestfor
clarificationwhichhereceived earlier than15 days prior tothedeadlinefor submissionof
bids.Employer’sresponsewillbepublished onwebsiteincluding a description
oftheenquirybut without identifyingits source.
9.2. Pre-bidmeeting
9.2.1. The bidderorhis officialrepresentative isinvitedtoattendapre-bidmeeting which will take
place atthe address, venue, time anddateasindicatedinthe appendix.
Sign.of the Contractor Sign. of the Executive Engineer
9.2.2. Thepurposeofthemeeting will betoclarifyissuesand toanswer questionsonany matterthat
mayberaisedat that stage.
9.2.3. Thebiddershallberequiredtosubmitany questionsin writingore-mailtoreach the
Employernot laterthan 03 days beforethemeeting.
9.2.4 Minutesofthemeeting,includingthequestionrose(withoutidentifyingthe sourceof enquiry)
andtheresponsesgivenwill be published withoutdelay onthe tender website
i.e.www.nprocure.com.Any modification of the bidding documentslisted insub-
Clause8.1whichmaybecomenecessary asaresultofthe pre-bidmeetingshall bemadebythe
Employerexclusivelythroughtheissueofan Addendum pursuanttoClause10
andnotthroughtheminutesofthepre-bid meeting.
9.2.5. Non-attendanceatthe pre-bidmeetingwillnotbecausefordisqualificationof a bidder.
10. AmendmentofBidding Documents
10.1 Beforethedeadlineforsubmissionof bids,theEmployermaymodifythebidding documents
byissuingaddenda.
10.2. Any addendumthusissued shall bepartofthebidding documents.TheEmployer will
assumeno responsibility forthesame.
10.3. To giveprospective biddersreasonabletimeinwhich to take addendum into
accountinpreparingtheir bids,the Employermay,athisdiscretion,extendas necessary
thedeadlineforsubmissionof bids,inaccordancewith Sub-Clause20.2 below.
Sign.of the Contractor Sign. of the Executive Engineer
C. PREPARATION OF BIDS
11. Language ofthe Bid
11.1 All documents relatingto the bidshall bein theEnglish language.
12. Documents Comprising the Bid
12.1. The bid be submitted by the bidderasVolume of the bid document (referClause8.1)shall be in
two separate parts:
Part - Ishall be named“Technical Bid” andshallcomprise
(i) BidSecurityin theformspecifiedin Section
(ii) Qualification Information andsupporting documents as specifiedinSection
(iii) Certificates,undertakings,affidavits as specifiedin Section
(iv) Anyotherinformationpursuant to Clause4.5oftheseinstructions
(v) Undertakingthat the bidshall remain validforthe periodspecifiedinClause15.1
Part - II shall be named“Financial Bid” andshall comprise
(i) Form ofBidas specifiedin Section
(ii) PricedBill ofQuantitiesforitems specifiedin Section
12.2. The Bidder shall submit the details / information pertaining to each part i.e. technical as
well as financial andmust besubmittedonlineonly.
12.3. Following documents will bedeemedto bepart ofthe bid.
Section Particulars VolumeNo.
Invitationfor Bids (IFB)
1 Instruction to Bidders Volume I
3 Conditions of Contract
4 Contract Data
5 Specifications Volume II
9 Drawings Volume IV
13.1 TheContractshallbeforthewholeworksasdescribedinSub-Clause1.1,basedon the pricedBill
of Quantities submittedbytheBidder.
13.2 The biddershall fill inrates andprices andlineitem total (both in figures and
words)forallitems oftheWorksdescribedintheBillofQuantitiesalongwithtotal
Sign.of the Contractor Sign. of the Executive Engineer
bid price(Bothinfiguresandwords).Itemsforwhichnorateorpriceisentered bythebidder will not
be paid forbytheBill of Quantities.
13.3 Allduties,taxes,andother levies except GSTpayablebythecontractorunderthe contract,or for
anyother causeshall beincluded intherates,pricesand total Bid PricesubmittedbytheBidder.
(GST will be paidextra)
13.5 Theratesandprices quotedbythebidder aresubjecttoadjustmentduringthe performanceof
theContract In accordancewiththeprovisionsof Clause47 of the Condition of Contract
(Irrespective of the time limit andBidAmount)
14. Currencies ofBid andPayment
14.1 TheunitratesandthepricesquotedbythebiddershallbeentirelyinIndianRupees.All payments
shall bemadein Indian Rupees.
15. BidValidity
15.1 Bidsshallremainvalidforaperiodofnotlessthan120daysafterthedeadlinedate forbidsubmission
specifiedin Clause20.
15.2 Inexceptional circumstances,prior to expiry of theoriginal timelimit,the Employer may
requestthatthebiddersmay extend theperiod ofvalidityforaspecified period.
Abiddermayrefusetherequest without forfeitinghis bidsecurity.Abidderagreeing to the
request will not be required or permitted to modify his bid, but will be required toextend
thevalidity of hissecurityfor a period of theextension, and in compliancewith Clause16in all
16. BidSecurity
16.1. TheBidder shall furnish,as partofhisBid,aBid securityintheamountasshownin
column4ofthetableofIFBforthisparticularwork.ThisBidsecurityshallbein favorofExecutive
Engineer, (R&B) Panchayat Division, Bhuj-Kachchandmaybein one ofthefollowing
a. Bank Guarantee from any scheduled Indian bank, in the format given
inVolumeIII.(BankGuaranteeisapplicableonlyforBidEstimatedAmountof01Croreanda
bove) andBankGuaranteeofScheduleandPrivate Banksshallbe considered asper GoGFinance
Department’s Circular No. FD/MSM/e- file/4/2023/0057/D.M.O.Date 21/04/2023
orasperthelatest amendment.
b. FixedDepositReceiptissuedbyanyScheduledIndianBankoraforeignBank
approvedbytheReserveBankof India.
A. ValidBid Security/EMDExemptionCertificateissuedby
(1) Road&Building Department or
(2) Narmada Water Resources, Water Supply and Kalpsar
DepartmentofGovtofGujarat.ExemptionCertificateisapplicableonly when Registration
CertificateofAppropriateClassandCategoryofApproved Contractorsis required as
eligible criteria of bidder.
Sign.of the Contractor Sign. of the Executive Engineer
16.2. Bank guarantees(and otherinstrumentshavingfixedvalidity)issuedassuretyfor
thebidshallbevalidfor45daysbeyondthevalidityofthebidi.e.totalvalidityof120+45 =165 Days
16.3. Any bid not accompanied by an acceptable Bid Security and not secured as indicated
inSub– Clauses16.1and 16.2above shall berejected by the Employeras non-responsive.
16.4. TheBidSecurity ofunsuccessful bidderswillbereturnedwithin 28daysoftheend ofthe bid
validityperiodspecifiedin Sub-Clause15.1
16.5 TheBid Security of thesuccessful bidder willbedischargedwhenthebidder has
signedtheAgreement and furnishedtherequiredPerformance Security.
16.6. The bidSecuritymaybeforfeited
(a) IftheBidderwithdrawsthebidafterBid openingduringtheperiodofBid validity.
(b) IftheBidder does not accept thecorrection oftheBidPrice,ifanyor
(c) InthecaseofasuccessfulBidders,iftheBidderfailsthespecifiedtimelimitto
(i) Sign theAgreement;or
(ii) Furnish therequirement Performance Security.
(d) # If found necessary, the bidder will be intimated for negotiation, He will be intimated
maximum three times within the validity period for negotiation,
Ifcontractordoesnotrespondintime,hisBidSecurity(EMD)willbeforfeitedandhistenderwillberej
ected.Punitive actionwillbetakenon such contractors.(AsperGoG R&BDept’sGr. No.
17. Alternative Proposalsby Bidders.
17.1. Biddersshall submit offersthatfullycomplywiththerequirementsofthebidding
documents,including theconditionsofcontract(including
mobilizationadvanceortimeforcompletion),basictechnicaldesign as indicated
inthedrawingand specifications.Conditionalof personal
alternativeofferswillnotbeconsideredfurther in the process oftenderevaluation.
18. Format andSigning ofBid
TheBiddershallpreparedocumentscomprisingthebidasdescribedinClause12oftheseInst
ructionsto bidder asthe “Technical Bid “and “Financial Bid”inseparate parts to beuploaded.
Sign.of the Contractor Sign. of the Executive Engineer
D. SUBMISSION OFBIDS
20. Deadline for Submissionof the Bids
20.1. Complete Bids must be received online by the Employer at the tender website
specifiedabovenot laterthan thedate indicatedin appendix.
20.2. TheEmployermay extend thedeadlineforsubmissionof bids by issuing an
amendmentinaccordancewithClause10,inwhichcaseallrightandobligationof the Employer and
thebidders previously subjecttotheoriginal deadlinewill thenbe subject to thenew deadline.
22. ModificationandWithdrawal ofBids
BiddersmaymodifyorwithdrawtheirbidsonlinebeforethedeadlineprescribedinClause20orpursu
ant to Clause23.
22.3. No bidshall be modifiedor withdrawn afterthedeadlineforsubmission ofBid.
22.4. Withdrawalormodificationofabidbetweenthedeadlineforsubmissionofbids
andtheexpirationoftheoriginalperiodofbidvalidityspecifiedinClause15.1 aboveorasextended
pursuanttoClause15.2 mayresultintheforfeitureoftheBid securitypursuant to Clause16.
Sign.of the Contractor Sign. of the Executive Engineer
E. BID OPENING AND EVALUATION
23. Bid Opening
23.1 TheEmployer willopenalltheBidsreceived including modificationsmadepursuant
toClause22,inthepresence of the Biddersortheirrepresentativeswhochooseto attend
attime,dateand theplacespecified inAppendix inthemanner specified in
Clauses20and23.3,IntheeventothespecifieddateofBidopeningbeingdeclared a holiday for the
Employer, the Bids will be opened at the appointed time and location on thenext working
23.3. The “Technical Bid” shall be opened. The amount, form and validity of the bid security
furnished witheach bid will beannounced.Ifthe bidsecurityfurnished does
notconformtotheamountand validity period asspecifiedintheinvitationfor bid (ref.Column4
and paragraph3),andhasnotbeenfurnished intheformspecified in Clause16,thetechnical bid
will not beopened.
23.4. (i) Subject to confirmation of the bid security by the issuing Bank, the bidsaccompanied
withvalid bid security will betakenupforevaluationwith
respecttotheQualificationinformationand otherinformationfurnishedin part-Iofthe
bidpursuant to Clause12.1.
(ii) Ifrequired,thebidderwillbeaskedinwritingtoclarifyhisQualificationDocuments with
respect to any requiredclarification.
(iii) Thebidderswillrespond innotmorethan7daysofissue oftheclarification letter.
(iv) Immediately (usually within3or4days),onreceipttotheseclarificationthe
EvaluationCommittee willfinalizethelistofresponsivebidderswhose financial bids
areeligibleforconsideration.
23.6 Atthetimeofopeningof“FinancialBid”,thenamesofthebidderswerefound
responsiveinaccordancewithClause23.4(iv)will beannounced.Thebidsof only
thesebidderswillbeopened.TheresponsiveBidders’names,theBidprices,the total amountof
thesebidderswillbeopened.TheresponsiveBidders’names,theBidprices,the total amountof
eachbid,any discountand such otherdetailsasthe Employer may considerappropriate,will
beannouncedbythe Employerat theopening.
23.7 The time of opening of “Financial Bid”, the names of the bidders were
foundresponsiveinaccordancewithClause23.4(iv)will beannounced.Thebidsof only
thesebidderswillbeopened.TheresponsiveBidders’names,theBidprices,the totalamountofeach
bid,any discount,and suchotherdetailsastheEmployermay considerappropriate,will
beannouncedbythe Employerat theopening.
23.8 Incasebidsareinvitedformorethanonepackage,theorderforopeningofthe“Financial Bid”shall
bein orderofestimatedamount ofBids from highest to lowest.
23.9 TheEmployershallprepareminutesoftheBidopening,includingtheinformation disclosedto
those present in accordancewith Sub– Clause23.6.
Sign.of the Contractor Sign. of the Executive Engineer
24.1 Informationrelatingtotheexamination,clarification,evaluation,andcomparisonof
Bidsandrecommendationsfor theawardofacontractshallnotbedisclosed to Bidders
oranyotherpersonsnotofficiallyconcerned withsuchprocessuntilthe award to the successful
Bidder has beenannounced. Any effort by Bidder to influencethe
Employer’sprocessingofBidsorawarddecisionsmayresultinthe rejection ofhis Bid.
25. ClarificationofFinancial Bids
Toassistintheexamination,evaluation,andcomparisonofBids,theEmployermay,athisdiscretion,
ask any Bidderforclarificationof hisBid,includingbreakdownsof
unitrates.Therequestforclarificationand theresponseshall beinwriting or bye-mail,butno
changeinthepriceorsubstancesoftheBidshallbesought,offered,or permitted
exceptasrequiredtoconfirmthecorrectionofarithmeticerrors discoveredbythe Employerin
theevaluation oftheBids.
25.2 Subject to sub-clause 25.1, no Bidder shall contact the Employer on any matter
relatingtohisBidopeningtothe contractis awarded.IftheBidderwishes to bring additional
information to thenoticeofthe Employer,it should do so in writing.
25.3. Any effort by theBidder to influencethe Employer inthe Employer'sbid evaluation,
bidcomparisonorcontractawarddecisionmayresultintherejection oftheBidders’ bid.
26. Examinations ofBidsandDeterminationofResponsiveness
26.1 Duringthedetail evaluation of "TechnicalBid",the Employer
willdeterminewhethereachBid(a)meetsthe eligibilitycriteriadefinedinClause3and4;(b)hasbeen
properly signed; (c) is accompanied by the required securities and;
(d)issubstantiallyresponsivetotherequirements oftheBiddingdocument.Duringthe
detailedevaluationof the“FinancialBid”,the responsivenessofthebidswillbe furtherdetermined
withrespecttotheremaining bid conditions,i.e.,priced billof quantities,technical
specifications,and drawings.
26.2 Asubstantiallyresponsive“FinancialBid”is onewhichconfirms all the terms, conditionsand
specificationsof biddingdocuments,withoutmaterialdeviationor
reservation.Amaterialdeviationorreservationisone (a)whichaffectsinany substantialway
thescope,quality,or performanceoftheWorks;(b)whichlimitsin any
substantialway,inconsistentwiththeBidding documents,theEmployer’srights ortheBidder’s
obligations undertheContractor(c)whoserectificationwouldaffect unfairly the
competitiveposition of other Bidders presenting substantiallyresponsiveBids.
26.3 If a “Financial Bid” is not substantiallyresponsive, it will be rejected by the
Employer,andmaynotsubsequentlybe maderesponsivebycorrectionor withdrawalofthenon-
conforming deviation or reservation.
Sign.of the Contractor Sign. of the Executive Engineer
29. EvaluationandComparisonofFinancial Bids
29.1. The Employer will evaluate and compare only the Bids determined to be substantially
responsivein accordancewith Sub-Clause26.2.
29.3. The Employer reserves the right to accept or reject any variation or
deviation.Variationanddeviationsandotherfactors,whichareinexcessoftherequirements ofthe
Bidding documents or otherwise result in unsolicited benefits for the Employer,shall not
betaken in to account in Bidevaluation.
29.4. Theestimated effectofthepriceadjustmentconditionsunder Clause47 ofthe
ConditionsoContact,duringtheperiodofimplementationoftheContract,willnot betaken in to
account in Bidevaluation.
29.5. If the Bid of the successful Bidder is seriously unbalanced in relation to the Engineer’s
estimate ofthe costofworktobe performedunderthe contractthe
EmployermayrequiretheBiddertoproducedetailedconsistencyofthoseprices
withtheconstruction methodsandscheduleproposed.Afterevaluationofthe price
analyses,theEmployermay requirethattheamountoftheperformancesecurity set
forthinClause34 beincreased attheexpenseofthesuccessful/biddertoalevel
sufficienttoprotectthe Employeragainstfinanciallossintheeventofdefaulttothe successful
Bidder undertheContract.
29.6. Abidwhich contains several items in thebillofQuantitieswhichareunrealistically priced low
andwhichcannot besubstantiated satisfactorilybythebidder maybe rejected non-responsive.
Sign.of the Contractor Sign. of the Executive Engineer
F. AWARDOF CONTRACT
31. AwardCriteria
31.1. Subjectto Clause32,the Employer will awardthecontractto theBidder whoseBid has
beendetermined.
(i) To besubstantiallyresponsivetotheBiddingdocumentsandwhohasofferedthelowest
evaluatedBidPrice;and
(ii) To bewithinthe availablebid capacity adjusted toaccountforhisbid price which
isthelowestevaluationinany ofthe packagesopened earlierthanthe one consideration.
nocase,thecontractshallbeawardedtoanybidderwhoseavailablebidcapacityislessthantheevaluat
edbidprice,evenifthesaidbid isthelowest
evaluatedbid.Thecontractwillinsuchcasesbeawardedtothenextlowestbidder at his evaluation
32. Employer’s Right to accept any Bid and to reject any or all Bids
32.1. NotwithstandingClause31,theEmployerreservestherighttoacceptorrejectany Bid,and
tocancelthe Bidding processand rejectallBids,atany timepriortothe
awardofcontract,withouttherebyincurringanyliabilitytothe affected bidderor biddersor
anyobligationtoinformtheaffectedBidderorBiddersof thegroundsfor the Employer’s action.
33. NotificationofAwardandSigning ofAgreement
33.1. The Bidder whose Bid has been accepted will be notified of the award by the Employer prior
toexpirationof theBid validity period by cable, telex or facsimile confirmed by registered
letter. This letter (hereinafter and in the condition of contractcalled the“Letter
ofAcceptance”)willstatethesumthattheEmployerwill paytheContractorin consideration
oftheexecution,completion,andmaintenanceof theWorks by theContractor as prescribed by
theContract(hereinafter and inthe Contract calledthe “Contract Price”).
33.2 Thenotification ofaward will constitute theformation ofthecontract,subject onlyto
thefurnishingofa performancesecurityin accordancewith the provisions of Clause.
33.3. TheAgreementwillincorporateallagreements betweentheEmployerand the
successfulBidder.Itwill besigned bytheEmployer and tothesuccessfulBidder,
within28daysfollowing thenotificationofaward alongwiththeLetter of Acceptance.Within21
daysof receipt,thesuccessful Bidderwill signtheAgreement and deliverit to the Employer.
33.4. Uponthefurnishing by thesuccessfulBidder ofthePerformanceSecurity,the Employer
willpromptly notifytheotherBiddersthattheir Bidshavebeen unsuccessful.
Sign.of the Contractor Sign. of the Executive Engineer
34. Performance Security
Within10(Ten)daysofreceiptofLetterofAcceptance,thesuccessfulBiddershallfu
rnishtotheEmployeranirrevocableand unconditionalguarantee from a Bank in the
form setforth in Section8 (the “Performance Security”) for an amount equal to 5%
(five percent) of its Contract Price. In case of bids
mentionedbelow,thesuccessfulBidder,alongwiththePerformanceSecurity,
shallalsofurnishtotheAuthority anirrevocableand unconditionalguarantee
fromaBankinthesameformgivenatSection8towardsan Additional
PerformanceSecurity (The“AdditionalPerformanceSecurity”)for anamount
calculatedas under:
(a) IftheContractPrice offered by theSelected Bidderis lowerthan10%but
upto20%oftheEstimated ProjectCost,thentheAdditionalPerformance Security shall
becalculated @20%of thedifferenceinthe(i) Estimated
ProjectCost(asmentionedinBidDocument)-Minus 10%ofthe EstimatedProject
Costand(ii)ContractPrice offeredbythe selected Bidder.
(b) IftheContractPriceoffered by theSelected Bidderislowerthan 20%of the Estimated
Project Cost, then the Additional Performance Security shall becalculated
@30%ofthedifferenceinthe(i) Estimated Project Cost(asmentioned inBid
Document) –Minus10%of the Estimated Project Cost and(ii) Contract
PriceofferedbytheselectedBidder.
(c) This Additional Performance Security shall be treated as part of thePerformance
(B) ThePerformanceSecurityshallbevalidbeyond60(sixty)daysoftheDefectsLiability Period
and the Additional Performance Security shall be valid beyond 28(twenty-eight) days
ofProject Completion Date.
34.2. If theperformancesecurity is provided by thesuccessfulBidder intheformof a Bank
Guarantee,itshall beissued either(a) attheBidder’soption,by a Nationalized/Scheduled
Indianbank or (b)by aforeignbank located inIndiaand acceptabletothe
Employer.AsperGoGFinanceDepartment’sCircularNo.FD/MSM/e-
file/4/2023/0057/D.M.O.Date 21/04/2023oraspertheirlatest amendment.
34.3. Failureof thesuccessful Bidder tocomply withtherequirementof Sub-Clause34.1
shallconstitutesufficientgroundsforcancellationoftheawardandforfeitureof theBidSecurity.
35 Advance Payment andSecurity
35.1 The EmployerwillsprovideanAdvance paymentontheContractPriceas stipulated in the
Conditions of Contract, subject to maximum amount, as stated in the Contract Data.
37. Corrupt or Fraudulent Practices
37.1 TheEmployerwillrejectaproposal if it determinesthattheBidderrecommended forawardhas
engagedincorruptorfraudulent practicescompletingforthe
Sign.of the Contractor Sign. of the Executive Engineer
contractinquestionandwilldeclarethefirm eligible,either indefinitely or fora stated period
oftime,to beawardedacontractwithNational HighwaysAuthorityof India/ StatePWDandany
otheragencies,ifitatany timedeterminesthatthefirm hasengagedin corruptto fraudulent
practices in completingforthecontractor,or in execution.
37.2 Furthermore; BiddersshallbeawareoftheprovisionstatedinSub-Clause59.2of theConditions of
Sign.of the Contractor Sign. of the Executive Engineer
Clause Reference
With respect to
TheName ofthe Employeris R&B Panchayat Department, Gujarat. [ Cl.1.1]
2. Thelast fiveyears.N.A.
3. This Annual Financial TurnoverAmount is Rs.NA. [Cl.4.5.3(a)]
4. Value of Work is Rs.
6. The cost of electric work is Rs.
7. The cost of watersupply/ sanitary works is Rs..
8. Liquidassets and/ oravailabilityofcreditFacilities is Rs.NA [Cl.4.5.6]
9. Price level of the financial year 2024-25 . [Cl.4.5.2]
10. The pre-bidmeeting will take placeat --- Not applicable [Cl.9.2.1]
11. Thetechnical Bid will beopenedat theofficeoftheNot applicable
12. Address of the Employer: Secretary, (R&B) Deptt, Block No.14, New
Sachivalaya, Gandhinagar.
14. The bidshouldbesubmittedlatest byAs statedon onlineNIT [Cl.20.1&20.2]
15. The bid will beopened at ExecutiveEngineer,R & B Panchayat Division [Cl.23.1]
Bhuj As stated onlineNIT
16. TheBankDraft in favorof‘Executive Engineer, Panchayat (R&B)
17. Deleted [Cl.4.5.2]
18. Escalation factors (forthecost of works executedand financial figureto a
common base value) forworks completed N.A.
Year Financial Year Enhancement factor
Base (year of inviting tender) 2023-24
Sign.of the Contractor Sign. of the Executive Engineer
# LISTOF KEY PLANT &EQUIPMENT TOBEDEPLOYED ONCONTRACT
WORK [ReferenceCL. 4.5.5]
The contractors shallalso give alistofmachineriesinhis possessionandwhich they propose to
use on thework.
Sr. PlantorMach Location Age Make Capacity ApproximateVa Remark
No. inery ofMachinery( lue
Sign.of the Contractor Sign. of the Executive Engineer
Listof Key Personneltobedeployedon ContractWork
(ReferenceCl. 4.5.4)
# Employment of a qualified site Engineer by the Contractor.
TheContractorshallemployfull-timetechnicallyqualifiedstaffduringtheexecutionofthis workas under:-
1. TwograduateCivilEngineersandthreediplomaCivilEngineerswhencostoftheworkto
beexecutedis morethan Rs.50lakhs.
2. Onegraduate&twoDiploma,CivilEngineerswhenthecostoftheworktobeexecuted is morethan
Rs.15lakhs but less than Rs.50lakhs.
3. MinimumoneDiplomaCivilEngineerwhenthecostofworkislessthanRs.15lakhs but morethan
4. Minimum two Diploma CivilEngineersforthe workwhenthe costofworktobe executed
islessthanRs.5 lakhs.TheEngineer soemployed for theGovernmentwork
musthavesufficientexperienceto handletheworkindependently.Such an Engineer
shallhavetostayatthesiteofworkandheshallnotbeentrustedwithotherdutyexcept this work.
Incasethecontractoror partner ofthecontractorfirmisaCivilGraduateEngineer,
EmploymentofaseparateEngineer willnotbenecessary provided thattheEngineer
partnerhimselfattends theexecution oftheworkon thesite.
Within 15 daysof issueof work-order theContractor will have to furnish to the Deputy
Executive Engineer– in – chargeof thework theName,Qualifications, copy of marksheet,Colour
Photograph and theappointmentorder issued such engineers
engagedforthiscontractwork.If15daysafterissueofworkordersuchdesignated Site Engineers do
notresume or not remain presentonsiteofwork,therecoveryat therateof Rs.15,000-00per month
perEngineer will bemadefromthe bills/deposit/dues ofthecontractor. Suchrecoveryshall benon-
Sign.of the Contractor Sign. of the Executive Engineer
QUALIFICATION INFORMATION
Sign.of the Contractor Sign. of the Executive Engineer
QUALIFICATION INFORMATION
TheinformationtobefilledinbytheBidderinthefollowingpageswillbeusedfor thepurposeof
postqualificationas providedforinClause4oftheInstructiontoBidders. This information will not
beincorporate in theContract.
1. For Individual Bidders
1.1 Constitution orlegal status ofBidder(Attach Copy)
Placeof registration
Principal placeofbusiness
PowerofattorneyofsignatoryofBid(Attach)
1.2 Total valueof Civil engineeringconstructions 2022-2023
Workperformedin thelast fiveyears 2021-2022
(in Rs. Lakhs) 2020-2021
1.3.1 Workperformedasprimecontractor,workperformedinthepastas a nominated sub-
contractorwillalsobeconsideredthesub-contractinvolvedexecutionofall mainitemsof
workdescribed inthebiddocuments,provided further thatallother qualification criteria are
satisfied (inthesamename)onworks of a similar nature overthelast fiveyears**andin current
yearbeforethesubmission ofthe bid.
ProjectNa NameoftheE Descriptionofw ContractNo. Valueofcon Date of Stipulated Actualdateofco Remark
me mployer ork tract(Rs.Cr issueofw periodof mpletion* explaining
ore) ork completion reasonsforDelay
order &workComplete
*Attach certificate(s) from the Engineer(s)in-charge
**Immediatelyproceedingthefinancial yearin which bids arereceived.
Sign.of the Contractor Sign. of the Executive Engineer
# 1.3.2 Quantitiesofworkexecutedasprimecontractor,workperformed,inthepastasa nominated sub-
contractor, will also be considered provided the sub-contract involved execution of all
main items of work described in the bid document,provided,furtherthat all
otherqualification criteria arecalled(in thesamenameand style) in thelast fiveyears**andin
current yearbeforethesubmission ofthe bid.
Year Name Name of Quantityof workperformed(Cum/MT) Remarks*
of the theEmploy Cement Masonry EarthWor BituminousWor (indicate
work er Concrete ks k contractRef)
1.4 InformationonBidCapacity(worksforwhichbidshavebeensubmittedandworkswhich areyet
to becompleted) as on thedate ofthis bid.
(A) Existingcommitmentsandon-going works:
Description of Place& ContractNo Name ValueContr StipulatedPerio Value Anticipated
works State . &AddressofE act(Rs. Cr) dofCompletion ofWorks*rema ofcompletion
mployer ining to be
*Attach certificate (s) from the Engineer(s) in-charge
**Immediatelyproceedingthefinancial yearin which bids arereceived.
AvailabilityofkeyitemsofContractorsEquipmentforcarryingouttheworks(Ref.Clause4.5.5).TheB
iddershouldlist all theinformation requestedbelow.
ItemofEquipm Requirement AvailabilityProposals Remarks (from
ent NO Capacity Owned/Leasedt Nos/Capaci Age/Conditio whom tobe
o beprocured ty ns purchased
Sign.of the Contractor Sign. of the Executive Engineer
1.6 Qualificationsand experienceofkey personnelrequired foradministrationand
executionofthecontract. Attachbiographicaldata.ReferalsotoSubClause9.1of theConditions
Position Name Qualification YearofExperience( Yearofexperience
General) in the proposed
Project Manager
1.7 Proposedsub-contract and firms involved
Sections ValueofSub- Sub- Experienceinsimilar
oftheworks Contractor Contractor(Name work
Attach copies of certificates on possession of valid license for executing water supply/
sanitary work/buildingelectrification works.
Sign.of the Contractor Sign. of the Executive Engineer
1.8 Financialreportsforthelastfiveyears: balancesheets,profitand lossstatements, auditors’ reports
(in case of companies/corporations), etc. List them below and attach copies.
1.9 Evidenceofaccesstofinancialresourcestomeetthequalificationrequirements:cash in hand,lines
ofcredit,etc.List them belowandattach copied documents.
1.10 Name, address, and telephone, telex, and fax numbers of the Bidder's bankers who may
provide references if contacted by the Employer.
1.11 Information on Litigation historyin which theBidderis involved.
Other Party(ies) Employer Cause ofDispute AmountInvolved Remarks showing
1.12. Statement of compliance under the requirements of Sub Clause 3.2of the instruction to
Bidders.(Nameof Consultant engaged forproject preparations is *………………………
1.13 Proposed work method and schedule. The Bidder should attach descriptions,
drawingsandchartsasnecessarytocomplywiththerequirements oftheBidding
documents.(Refer ITBClause4.1)
3. Additional Requirements
3.1 Bidders should provide any additional information required to fulfill the requirements of
Clause4oftheInstructions totheBidders,ifapplicable.
(ii) Undertaking
Fill thenameof Consultant
Sign.of the Contractor Sign. of the Executive Engineer
SAMPLE FORMAT FOR EVIDENCE OF ACCESS TO OR
AVAILABILITY OF CREDIT FACILITIES
(CLAUSE4.5.6 OFITB) BANK CERTIFICATE
ThisistocertifythatM/s.------------------------------------isa reputed Companywith a good
financial standing.
If the contract for the work namely is awarded to the
above firm, we shall be able to provide overdraft / credit facilities to the extent of Rs.--------------
to meet their working capital requirements for executing the above during the contract period.
SeniorBankManager
Address oftheBank
Sign.of the Contractor Sign. of the Executive Engineer
1. I,theundersigned,dohereby certify thatallthestatementsmadeintherequired attachments
aretrueandcorrect.
2. The under signed also here by certifies that neitherour firm M/s. .Havenotabandoned
anyworkof Governmentof Gujarat/Governmentof India/any Board or Corporationunder
Governmentof Gujarat/Governmentof Indianor any contractawarded
tousforsuchworkshavebeenrescinded,duringlastfiveyearspriortothedateofthis bid.
3. Theundersignedherebyauthorize(s)andrequest(s)anybank,person,firmor
corporationtofurnish pertinent informationdeemednecessaryandrequested by
theDepartmenttoverifythisstatementorregardingany(our)competence and general
4. The undersigned understands and agrees that further qualifying information
mayberequested,andagreestofurnishanysuchinformationattherequestof theDepartment/
Project implementingagency.
(Signedbyan Authorized Officerofthe Firm)
Title of Officer
Sign.of the Contractor Sign. of the Executive Engineer
I,the under signed do here by undertake that our firm
minimum cash up to 25% of the value of the work during implementation of the contract.
(Signed by an Authorized officer of the firm)
Title of officer
Sign.of the Contractor Sign. of the Executive Engineer
CONDITIONSOFCONTRACT
Sign.of the Contractor Sign. of the Executive Engineer
Conditionsof Contract
Table ofCont nts
A General Page D. CostControl
1 Definitions 37 37 Bill of Quantities
2 Interpretation 38 38 Changes in the Quantities
3 Language and Law 39 39 Variations
4 Engineer’s Decisions 39 40 Payments for Variations
5 Delegations 39 41 Cash Flow Forecasts
6 Communications 39 42 Payment Certificates
7 Sub-Contractors 39 43 Payments
8 Other Contractors 39 44 Compensations Events
9 Personnel 40 45 Tax
10 Employer’s &Contractor Risk 40 46 Currencies
11 Employers Risks 40 47 Price Adjustment
12 Contractor’s Risk 40 48 Retention
13 Insurance 40 49 Liquidated damages
14 Site Investigations Reports 41 50 Bonus
15 Queries about the Contract 41 51 Advance Payment
16 Contractors to Construct the 41 52 Securities
17 The Works to be Completed By 41 53 Deleted
The In tended Completion Date
18 Approval by the Engineer 41 54 Cost of Repair
20 Discoveries 42 E. Finishing the Contract
21 Possession of the Site 42 55 Completion
22 Access to the Site 42 56 Taking Over
23 Instructions 42 57 Final Account
24 Disputes 42 58 Operating and Maintenance
25 Procedure for Disputes
26 Deleted 43 59 Terminations
60 Payment upon Terminations
B. Time Control 61 Property
27 Programme 44 62 Release from Performance
28 Extensions of the Intended
completion date
29 Deleted 44 F. Special Conditions of
30 Delays Ordered by The 44 63 Labour
Engineer 64 Compliance with labour
31 Management Meetings 45 65 Arbitration
32 Early Warning
C. Quality Control
33 Identifying Defects
35 Correction of Defects
36 Uncorrected Defects
Sign.of the Contractor Sign. of the Executive Engineer
CONDITIONSOFCONTRACT
1.1 TermswhicharedefinedintheContractDataare not also defined in theConditions of Contract
but keeptheir definedmeaning.
Bill of Quantities means the priced and completed Bill of Quantities formingpart oftheBid.
CompensationEvents arethosedefinedin Clause44hereunder
TheCompletion DateisthedateofcompletionoftheWorksascertified by the
Engineerinaccordancewith SubClause55.1
TheContractisthecontractbetweenthe EmployerandContractorto execute, complete and
maintain the Works till the completion of Defects Liability Period. It consists ofthedocuments
listedin Clause2.3below.
TheContractdatadefinesthedocuments andotherinformationwhich comprisetheContract.
TheContractorisapersonorcorporatebodywho’sBidtocarryouttheWorkhas
beenacceptedbythe Employer.
TheContractor’sBidisthecompletedBiddingdocumentsubmittedbytheContractorto the
Employerandincludes Technical andFinancial Bids.
TheContractPriceisthepricestated intheLetterofAcceptanceand thereafteras adjustedin
accordancewith the provisions oftheContract.
Daysarecalendardays:months arecalendarmonths.
TheDefectsLiability PeriodistheperiodnamedintheContractDataand calculated from
theCompletion Date.
TheEmployeristhepartywhowillemploytheContractortocarryouttheWorks.
TheEngineeristhepersonnamedinthe ContractData(oranyother
competentpersonappointed and notified tothecontractorto actin replacement of the Engineer) who
isresponsiblefor supervising theContractor,administering the Contract,certifying
paymentsduetotheContractor,issuing and valuing Variations to the Contract, awarding
extensions of time, and valuing the Compensations Events.
EquipmentisContractor’smachineryand vehiclesbrought temporarilyto thesite to
construct theWorks.
The Initial Contract Price is the Contract Price listed in the Employer’sLetterof
TheIntendedCompletion Dateisthedateonwhich it is intended thatthe Contractor
shallcompletetheWorks.TheIntended CompletionDateisspecified in the Contract Data. The
Intended Completion Date may be revised only by the Engineerbyissuing extension oftime.
Sign.of the Contractor Sign. of the Executive Engineer
Materials areallsupplies,includingconsumables,used bythecontractorfor incorporation in
Plantisany integral partoftheworkwhichistohavemechanical,electrical, electronic
orchemical orbiological functions.
TheSite is thearea definedas such in theContract Data.
SiteInvestigation Reportsarethosewhichwereincluded intheBidding documentsand
arefactual interpretive reports aboutthesurfaceand subsurface conditions at thesite.
Specifications mean theSpecificationsof theworksincludedintheContract
andanymodification oraddition madeorapprovedbythe Engineer.
The Start Date is given in the Contract Data. It is the date when the Contractor
shallcommenceexecutionoftheworks.Itdoesnotnecessarily coincide with anyofthe Site Possession
A Subcontractor is a person or corporate body whohasaContractwith the
Contractortocarry outapartofthework intheContractwhichincludeswork onthe Site.
TemporaryWorksareworksdesigned,constructed,installed,and removed bytheContractor
which areneeded forconstruction orinstallation oftheWorks.
AVariationis an instruction given bythe Engineer,which varies theWorks.
TheWorks arewhat theContract requires theContractorto construct,install,andturn
overtothe Employer,as definedin theContract Data.
2. Interpretation
2.1 Interpreting theseConditionsof Contract, singular alsomeans plural,male also means
female or neuter and theotherway around.Headinghaveno significance.Wordshave the
normal meaning under the language ofthe Contractunlessspecificallydefined.TheEngineer
will provideinstructions clarifyingqueries about Conditions of Contract.
2.2 IfsectionalcompletionisspecifiedintheContractData,referencesinthe
ConditionsofContracttotheWorks,the Completiondate,and Intended CompletionDateapply
toany Sectionofthe Works(otherthanreferencesto theCompletion Date and Intended
Completiondate forthewholeworks)
2.3 ThedocumentsformingtheContractshallbeinterpretedinthefollowing orderofpriority
(2) Letterof Acceptance,noticeto proceed with works
(3) Contractor’s Bid
(4) Contract Data
Sign.of the Contractor Sign. of the Executive Engineer
(5) Conditions of Contract including Conditions ofContract
(6) Specifications
(8) Bills ofquantities and
(9) AnyotherdocumentlistedintheContractDataasformingpartoftheContract.
3. Language andLaw
3.1 ThelanguageoftheContractandthe law governing theContractare statedin theContract
4. EngineersDecisions
4.1 Except where otherwise specifically stated, the Engineer will decide contractual matters
between theEmployerandthe Contractorinthe role representingthe Employer.
5.1 TheEngineermaydelegateanyofhisdutiesandresponsibilitiestoother peopleafter
notifyingtheContractor andmay cancel anydelegationafter notifyingtheContractor.
6. Communications
6.1 Communications between partieswhich arereferred tointheconditionsare effective
onlywhen in writing. Anotice shallbe effective only whenitis delivered (in terms ofIndian
7. Sub-Contracting
7.1 TheContractormay subcontractany portionofwork,uptoalimitspecified in
contractdata,with theapproval of theengineer butmay notassignthe Contract without the
approval of the Employer in writing. Subcontracting shall not alternative
theContractor’sobligations. Sub-contractingof supplyor specific items ofwork is not
7.2 Thesub-contractormustberegisteredin appropriateclassandcategoryfor the part of workto
besubcontracted.
8. Other Contractors
8.1 The Contractorshall cooperateandshare the Sitewithothercontractors,
publicauthorities,utilitiesand theEmployerbetweenthedatesgiveninthe Scheduleofother
Contractor.TheContractors shall refer tointheContract Data, also provide facilities and
services for them as described in the Schedule.Theemployer may modify thescheduleof
other contractorsand shall notifythecontractorofanysuchmodifications.
9.1 TheContractor shallemploy thekey personnelnamed intheScheduleof Key Personnel
Referred tointheContractDatatocarry outthefunctionsstated intheScheduleorother
Sign.of the Contractor Sign. of the Executive Engineer
personnelapproved by theEngineer.TheEngineer will approveany proposed replacementof
key personnel onlyif their qualifications,abilities,and
relevantexperiencearesubstantiallyequaltoor betterthan thoseofthepersonnel listedin
9.2 IftheengineeraskstheContractortoremoveapersonwhoisamemberof theContractor
Stafforhisworkforcestating thereasons theContractorshall ensurethat the person leaves the
Site within sevendays andhas nofurther connection with theworkin theContract.
10. Employer’s andContractors Risks
10.1 TheEmployercarriestheriskwhichtheseContractstatesareEmployer’s risks,and the
Contractor carriestheriskswhichtheseContractsstatesare Contractors risk.
11. Employer’s Risks
11.1 Theemployerisresponsiblefortheexceptedriskswhichare(a) insofar as they directly affect
the execution of the Work,the risks of war,hostilities, invasion,actof foreign enemies,
rebellion, revolution, insurrection or military or usurped power,civilwar,riot commotion
ordisorder (unless restricted to theContractor’semployees),and contamination
fromanynuclear fuel or nuclear waste orradioactive toxic explosive.
12. Contractor’s Risks
12.1 Allrisksoflossofor damagesto physical property and of personalinjury and death which
arise during and inconsequenceof theperformanceof the Contract other than the
excepted risks are the responsibility of the Contractor.
13.1 TheContractorshallprovide,inthejointnamesoftheEmployerandthe Contractor, insurance
coverfromthe Startdatetothe endoftheDefects LiabilityPeriod,intheamountsanddeductible
stated intheContractdata forthefollowingevents which aredueto theContractor’s risks:
(a) Loss ofor damageto theworks,Plant andmaterials,
(b) Loss ofor damageto Equipment
(c) Loss ofor damages ofproperty(expect theWorks,Plant,Materials andEquipment)in
connection with theContract;and
(d) Personal injuryor death.
13.2 PoliciesandcertificatesforinsuranceshallbedeliveredbytheContractorto
theEngineerfortheEngineer’sapprovalbeforetheStartDate. Allsuch insuranceshall
providefor compensationto be payableinthetypesand proportions ofcurrencies requiredto
rectifytheloss or damageincurred.
13.3 If the Contractor does not provide any of the policies and certificates
required,theEmployermay affecttheinsurancewhichtheContractor should have provided
and recover the premiumsthe Employer haspaid from paymentso otherwise
duetotheContractoror,ifnopaymentis due,the payment ofthe premiums shall bea debtdue.
Sign.of the Contractor Sign. of the Executive Engineer
13.4 Alterations to the terms of aninsurance shall not be made without the approval ofthe
13.5 Both parties shall comply with anyconditions oftheinsurance policies.
14. Site InvestigationReport
14.1 The Contractor in preparing the Bid shall rely on any site Investigation
reportsreferredtointheContractData,supplemented byanyinformation availableto
15. Queries aboutthe Contractdata
15.1 Theengineer will clarifyqueries on theContract Data
16. Contractor to Construct the Works
16.1 TheContractorshallconstructandinstalltheworksinaccordancewiththe specification
17. The Works to be completedby the IntendedCompletion Date
17.1 TheContractormaycommenceexecutionoftheWorksontheStartDateand
shallcarryouttheWorksinaccordancewiththeprogrammesubmittedby theContractor,as
updatedwiththeapprovalofthe Engineer,andcomplete them bytheIntendedCompletion date
18. Approval by theEngineer
18.1 The Contractor shall submit Specifications and Drawings showing the proposed
Temporary workstotheEngineer, whoistoapprovethemif they comply with the
Specifications and drawings.
18.2 TheContractorshall beresponsiblefor design oftemporary works.
18.3 The Engineer’s approval shall not alter the contractor responsibility for design
oftheTemporary works.
18.4 The Contractorshallobtainapprovalofthirdpartiestothe designoftheTemporary
workswhererequired.
18.5 AllDrawingspreparedbytheContractorsfortheexecutionofthetemporary or permanentwork
aresubjectto prior approval by the Engineer beforetheir use.
19.1 TheContractorshall beresponsibleforthesafetyofall activities on the Site.
20. Discoveries
Sign.of the Contractor Sign. of the Executive Engineer
20.1 Anythingofhistoricalorother interest or of significant value unexpectedlydiscovered
onthesiteistheproperty of theEmployer.Thecontractor isto notify theengineer of
suchdiscoveriesand carry outtheEngineer’s instructions for dealingwith them.
21. Possessionof the Site
21.1 TheEmployer shallgivepossessionofall partsofthesitetotheContractor.If possessionof a
partisnotgivenbythedatestated intheContractDatathe
Employerisdeemedtohavedelayedthestartoftherelevant activitiesand this will bea
Compensation Event.
21.2 Ifwithin25%ofthetimelimitoftheproject,80%ofpossessionofthesiteis nothanded over
totheContractor,thencontractor/ Employer mayfore-close thecontract.
Contractor/Employer havetoforeclosethework within30 days after lapseof 25%-
timelimitand after 30 daysforeclosure optionwill be closed.
22. Access to the Site
22.1 TheContractorshallallowtheEngineerandanypersonauthorizedbythe Engineeraccesstothe
Site,toany placewhereworkinconnectionwiththe Contractisbeingcarriedout oris intended
to be carried out and toany place wherematerialsorplants are being
manufactured/fabricated/assembled for theworks.
23. Instructions
23.1 TheContractorshallcarryoutallinstructionsoftheEngineerpertaining toworkswhich comply
with theapplicablelaws wherethesite is located.
23.2 The Contractor shall permit the Employer to inspect the Contractor’s accountsandrecords
relatingtotheperformanceoftheContractorandto have them audited byauditors appointedby
theEmployer,ifsorequiredby the Employer.
24.1 IftheContractorisoftheviewthatadecisiontakenbytheEngineerwas either outside the
authoritygiventotheEngineer by theContractorthatthe decision was wrongly taken,
the decision shall be referred to#Superintending Engineer(Higher
Authority)within14 daysof the notificationofthe
Engineer'sdecision.Iftheissueisnotresolved,any party canrefer the matter for
conciliationwithin15 daysfromthedecision givenbythe#SuperintendingEngineer.
24.2 (a) For the work upto Rs.100 Cr., if any of the parties not satisfied with the decision
of the # Superintending Engineer, both the parties have to refer to the Chief
Engineer concern for the conciliation process.
(b) For the work morethan Rs.100 Cr., if any of the parties not satisfied with the
decision of the # Superintending Engineer, both the parties have to refer to the #
Secretary, Roads & Building Department, Government of Gujarat for the
conciliation process.
Sign.of the Contractor Sign. of the Executive Engineer
If the dispute is not resolved through the conciliation process, he may refer the
dispute to Gujarat Public Works Contract Dispute Arbitration Tribunal. If the Contractor
failed to refer claim /disputetotheHigherAuthoritywithin14 daysof thenotificationof the
Engineer'sdecision,theContractor shall not beentitledtoanyadditionalpayment/claim if he
doesn't follow the abovesequence in stipulated time andheshouldnot stop the work.
25. Procedure for Disputers
25.1 The arbitration shall be conducted in accordance with the arbitration procedure stated in
the Special Conditions of Contract.
Sign.of the Contractor Sign. of the Executive Engineer
B. TIME CONTROL
27.1 WithinthetimestatedintheContractData theContractorshallsubmittothe
EngineerforapprovalaProgrammeshowing
thegeneralmethods,arrangementsorders,andtimingforalltheactivitiesin
theworksalongwith monthlycash flow forecast.
27.2 An update of the Programme shall be a programme showing the actual progressachieved
oneachactivity and theeffectoftheprogressachieved on
thetimingoftheremainingworkincludinganychangestothesequenceof theactivities.
27.3 TheContractor shallsubmittotheEngineer,for approval updatedprogramme at intervals no
longer thantheperiodstatedintheContractdata. If theContractordoesnot submit an updated
programme with this period, theEngineer may withhold
theamountstatedintheContractdatafromthe nextpaymentafter
thedateonwhichtheoverdueprogramme has been submitted.
TheEngineer’sapprovaloftheprogrammeshallnotaltertheContractor’sobligations.T
heContractormayrevisetheprogrammeand submitittothe Engineeragainatany
time.Arevisedprogrammeistoshowtheeffectof Variations and Compensations events.
28. Extensionof the IntendedCompletion Date
28.1 TheEngineershallextendtheIntendedCompletionDateifacompensation Event occurs or
a Variation is issued which makes it impossible for completionto beachieved by
theIntendedCompletionDatewithoutthe Contractor takingstepsto accelerate the
remainingworkandwhichwould causetheContractorto incur additional cost.
28.2 TheEngineershalldecidewhetherandbyhowmuchtoextendtheIntended
CompletionDatewithin35daysofthe Contractorasking theEngineerfora decision upon the
effect of compensation eventorVariationand submitting
fullsupportinginformation.IftheContractorhasfailedtogiveearly warningof delay or has
failed to cooperate in dealingwith delay, the delay by thisfailure shall not be
consideredinassessingthe newIntendedCompletion Date.
28.3 TheEngineer shallwithin14daysofreceiving fulljustificationfromthe
contractorforextensionofIntendedCompletionDaterefertotheEmployer
hisdecision.Theemployer shall innotmorethan21 days communicateto the
engineertheacceptanceorotherwiseoftheEngineer’sdecision. Ifthe
employerfailstogivehisacceptance,the Engineershallnotgrantthe extension
andthecontractormay referthematter under Clause24.1
30. Delays Orderedby theEngineer
30.1 TheEngineermay instructtheContractortodelay thestartor progressofany activity within
Sign.of the Contractor Sign. of the Executive Engineer
31. Management Meetings
31.1 Either theEngineer or theContractor may requiretheother toattend a management
meeting.The businessofmanagement meetingshallbe to
reviewtheplansforremainingworkand todeal with matters raised in accordancewith
theearly warningprocedure.
31.2 TheEngineershallrecordthebusinessofmanagementmeetingsandisto provide copies of his
record tothoseattending themeeting and tothe Employer.Theresponsibility of the
partiesfor actionsto betakenisto be decided by theEngineer Either at the Management
Meeting orafterthe management meetingandstatedin writingto all who
attendedthemeeting.
32. Early Warning
32.1 TheContractoristowarntheEngineerattheearlies opportunity specific likely future events
orcircumstances that may adversely affectthe quality of thework,increasethe
Contractprice or delay the execution of works. The
Engineermayrequirethecontractortoprovide an estimate oftheexpected effect of the
future event or circumstance on the contractprice and completiondate.Theestimate isto
beprovided by theContractorassoonas reasonably possible.
32.2 TheContractorshallcooperatewiththeEngineerinmakingandconsidering
proposalsforhowtheeffectof such aneventor circumstances canbe avoided orreducedby
anyone involved in the work andin carrying out any resulting instruction ofthe Engineer.
Sign.of the Contractor Sign. of the Executive Engineer
C. QUALITY CONTROL
# 33. Identifying Defects/Defectliabilityperiod
33.1: Defectliabilityperiod:Thecontractorshallberesponsibletomakegoodand remedy at his
ownexpenseanydefectwhich maydevelop ormay benoticed beforethe period mentioned
hereunderfrom thecertified dateof completion. TheEngineer
inchargeshallgivethecontractor anoticeinwriting aboutthe defectsand
thecontractorshallmakegood thesamewithin15daysofreceipt of thenotice.Inthecaseof
failureonthe partof thecontractor,the Engineer- in-chargemayrectifyorremoveorre-
executetheworkattherisk&costof thecontractor.TheEngineer-in-chargeshallbeentitled
toappropriatethe wholeorany partof theamountof securitydeposittowardstheexpenses,if
any,incurred by himin rectification,removalorre-execution.TheDefects Liability
periodshall beas under….
(a) For all works costing up to Rs.50,000(amount put to tender), the period shall be
Months from the certified date of completion.
(b) For all works costing more than Rs.50,000 and up to Rs.1 crore(amountput
tender),the period shall be 12 (Twelve)months from the certified date of
completion or one monsoon,which ever is later.
(c) Formajorprojects costingmore thanRs. 1crore, the periodshallbe 36Monthsfrom
thecertified dateof completionwhich should includethree monsoons.
(d) For originalbuildingworksthedefectliability periodwillbe4years or
elapseof4monsoonperiodfollowingdateof possessionof building takenover by
useragency followingthecertified date ofcompletion,whicheveris later.
For thepurposeofdeciding themonsoonperiod,the30th September shall be
treatedas thelast date.
Modified videR&BDCircularNo. PAC–11–102008–2076–
Ndated31/8/2009,PRCH/102013(2976)2759-N, Dated 27/05/2013 and Circular
No.TNC/10/2016/Clause17A(Correction/(1)CDated 12/05/2016]
33.2 Freemaintenanceguarantee period for
worksofRoad/Bridgeconstruction
(a) Forresurfacingworkofroad freemaintenanceguaranteeperiod oneyearfrom thedate
(b) Incaseof widening of theroad/strengthening of theroad/bridge,the
contractorshallhavetogivefouryearsfreemaintenanceguarantee from
thecertifieddateofcompletion.Duringthisperiodthecontractorshall visitthesite
everysixmonthsalongwiththeconcerned SectionOfficer/ Deputy ExecutiveEngineer and
willexaminethework alreadycarriedout inthiscontractlikeroad
work,junglecutting,sideshoulders,sidegutter, roadfurniture,pattaetc.andwillprepareKm.
wiseinspectionreportduly signed by allconcerned and anydefectobserved
shallbedonewithin 15 days by thecontractorathisrisk and costas per thedirectionof
Engineer in charge. The contractor needs to do videography of these visitsand
requiresubmittingatthetimeofreleaseof FMG.IfB.T.thesurfaceduring
themaintenanceperiod of 4 yearsisworn out then agency shallhaveto providerenewal
coatingas pertenderitem asdirectedbythe Engineer– in- charge. The amount equivalent
to 5% of each running bill shall be withheld and will bereleased after
thefreemaintenanceguarantee period (i.e.4 years) is over.
Sign.of the Contractor Sign. of the Executive Engineer
However,thisamountshall bereleased againstfixed depositor bank guarantee pledge
inthenameof ExecutiveEngineer after completion certificate of workis issued.
(1) The flakiness and elongation index (combined) for coarse aggregates under no
circumstances shall exceed the allowable limit set forth in the relevant
clauseforthematerial in question.
(2) 2%oftheamounteligibleforthepaymentobituminousitemsshallbe withheldtill the
miscellaneousitemslike earthworkinembankment/ cutting
forsideshoulders,sidegutters,kilometer/indicator/guard
stones,signboardsetc.arecompletedinallrespectbythecontractor. After
completionofthemiscellaneousitems,theabovesaid 2%withheld amount shall
bereleased.(Govt.ofGujarat's G.R.No.: TNC-10-2013-3(Part-3)/C,Dtd.13/12/2013).
(3) VideographyforthesurfaceunderMaintenanceGuarantee is to bedone asper Govt.letter
No.: SSR/10/2015-16/26/C, Dtd.26/11/15for thework costingmorethan Rs.5.00Crore.
(4) Setting upofadequate laboratory&deployment ofqualityengineers.
Thecontractor shallhavetosetupthelaboratory withadequate equipment.Tillthesetting
upof adequatelaboratory iscompleted &reported ofthistotheengineer
(subjecttodueverificationby engineer’s representative) by contractor
inwriting,Rs.2,00,000/-shall bewithheld. Thequalifiedquality
Engineershallbedeployedexclusivelyforthis contract by thecontractors.If quality
Engineer isnotdeployed by contractorwithinone monthafterthedate
ofworkorder,theamount equivalenttoRs.20,000per month shall berecoveredtilltheactual
deploymentofqualityengineer.Theamount sorecoveredtowardsthe deployment
ofqualityengineers shall not berefunded.
(5) Asphalt work will have to be cross checked as per G.R. No.:
RGN/60/2006/35/C,dtd.31/05/07beforefinal bill is paid.
(6) Maintenanceduring Construction
Period:DuringtheConstructionPeriod,theContractorshallmaintain,athis own risk and
cost,theexisting lane(s)oftheroads so that the traffic worthiness and safety
thereofareatnotime materially inferior ascompared totheir condition10(ten)days
priortothedateoftheAgreement,and shall undertakethenecessary repair and
maintenanceworksfor this purpose; provided
thattheContractormay,athiscost,interruptand diverttheflow
oftrafficifsuchinterruptionand diversionisnecessary fortheefficient progress of works
and conforms to Good Industry Practice; provided
Sign.of the Contractor Sign. of the Executive Engineer
further that such interruption and diversion shall be undertaken by the Contractor only
with the prior writtenapproval of the Executive Engineer
whichapprovalshallnotbeunreasonably withheld.For theavoidanceof doubt, it is agreed
that the Contractor shall at alltimesresponsiblefor ensuring safe operation of the road.
33.3 TheEngineershallchecktheContractor’sworkandnotifytheContractorof any
defectsthatarefound.Suchchecking shallnotaffecttheContractor’s responsibilities the
Engineer may instruct the Contractor to search for a
DefectandtouncoverandtestanyworkthattheEngineerconsidersmay havea Defect.
34.1 IftheengineerinstructstheContractortocarry outatest not specified inthe
Specificationtocheckwhether any work has a Defect and the test shows that
itdoes,theContractorshall pay forthetestand any samples.If thereisno defect thetest shall
beaCompensation Event.
34.2 #1%oftheamountof workdoneshouldbedeductedfromR.A.Billofthe contractorfortesting
thequalityofmaterial workmanship,irrespectiveof actual charges.
34.3 Agencyhastoestablishtesting laboratory onsite for the various test to be carried
outinthework for this purposeagency shall construct apukkalaboratory buildingwith all
facility on site at location specified by the engineerin charge.
35. Correctionof defects
35.1 TheengineershallgivenoticetotheContractorofanydefectsbeforetheend
ofthedefectsLiabilityPeriod,whichbeginsatCompletionandisdefinedinthecontractdata.Th
e DefectsLiabilityPeriodshallbeextendedforaslongas Defects remain to becorrected.
35.2 Every timenoticeofaDefectisgiven,theContractor shallcorrectthenotified defect within
thelength oftimespecifiedbythe Engineer’s notice.
36. UncorrectedDefects
36.1 IftheContractorhasnot corrected a defect within the time specified in
theEngineer’snotice,the Engineerwill assess the cost of having theDefect
corrected,andtheContractor will paythis amount.
Sign.of the Contractor Sign. of the Executive Engineer
37. Bill of Quantities
37.1 The bill of Quantities shall contain items fortheconstructions,installation, and
testingandcommissioning workto bedone bytheContractor.
37.2 ThebillofQuantitiesisused tocalculatetheContractprice.TheContractor is paid
forthequantity oftheworkdoneatthe rateintheBillofQuantitiesfor each item.
38. Change intheQuantities
38.1 TheEngineershallhavepowertomakeanyalterations in or addition tothe
originalspecifications, drawings,designsandinstructionsthatmayappearto himto
benecessary or advisableduring theprogressof theworkand the contractor shall bebound
tocarry outthework inaccordancewithanyinstructioninthisconnectionwhichmay
begiventohiminwriting signed by the Engineer and such alterationshall
notinvalidatethecontractand any additional workwhichthecontractor may bedirected
todointhemanner abovespecified aspartofthework shall becarried outby thecontractor on
thesameconditionsin allrespectsonwhich he agreed to do the main work andat thesamerate
asarespecifiedin thetender forthemain
work.Exceptthatwhenthequantityofanyitemexceedsthequantityasinthe tender bymorethan
130%,thecontractorwill bepaid forthequantity in excessof130%,atthe rateenteredin
theSORoftheyearduring whichthe excess in quantityis first executed.
39.1 All Variations shall be included in updated programmesproduced by theContractor.
40. Payments for Variations
40.1 Iftheadditionaloralteredworkincludesanyclassofworkforwhichnorate isspecified
inthiscontract,thensuch classof work shall becarriedoutas under.
(i) Attheratederivedfromtheitemwithin thecontractwhichiscomparableto theoneinvolving
additionaloraltered class ofwork;where there are more thanonecomparable
items,theitemofthecontractwhichisnearestin comparisonwithregard to class or classes of
the work involved shall be selected and thedecisionoftheSuperintending Engineerasto the
nearest comparable itemshall befinal andbindingon thecontractor.
(ii) Iftheratecannotbe derived inaccordancewith(i)above,suchclassofworks
shallbecarriedoutattherateenteredintheScheduleofRatesofthedivision
Sign.of the Contractor Sign. of the Executive Engineer
for theyear inwhich thetender wasreceived,increased or decreased by the
percentagebywhichthetenderamountis moreorlessascomparedtothe
amountarrivedattheratesinthe“Scheduleof Rates”of theDivisioninthe year inwhich
thetender wasreceived.If the Scheduleof ratesof theDivision
doesnotcontainalltheitems,thepercentageincreaseordecrease ofthe tendershall be
calculated considering suchitemswhichwereincluded inthe “Scheduled Rates”of
thedivisionfortheyearand for materials consumed on such item the rate to be charged
would be the basic rate taken in to accountfor fixingtherate in S.O.R.referredto above.
(iii) Ifitisnotpossible toarriveattheratefrom(i)and (ii)above,suchclassof workshall becarried
outattheratedecided by the competent authority on the basisof detailed rateanalysisafter
hearing thecontractorbefore a CommitteeoftwoSuperintendingEngineers stationed at the
same place or thenearest place.
40.2 If theadditional or altered work,forwhich no rate is entered inthe “Schedule of Rates”of
theDivisionisordered to becarried outbefore the rate
agreedupon,thenthecontractorshallwithinsevendaysof the date of receipt by him
oftheordertocarry outthework,informtheEngineer– in – chargeoftherate,
whichitishisintention tochargeforsuchclassofworkandiftheEngineerin charge
doesnotagreetothisrates,heshallbynoticeinwritingbeat liberty
tocancelhisordertocarryoutsuchclassofworkandarrangetocarryitout insuchmanner ashe
may consideritadvisable,provided alwaysthatifthe contractor shallcommencework or incur
anyexpenditure in regard thereof before the rates shall have been determined as
lastly herein before mentioned, then in such cases he shall only be entitled to be paid in
respect of theworkcarriedoutorexpenditureincurredby him prior tothe dateof the
determinationof therate aforesaid according tosuchrateor ratesasshall befixed by
theEngineer-incharge.Inthe event of the dispute, the decision of the
SuperintendingEngineeroftheCircleshallbefinal.
Where,however,theworkistobeexecutedaccordingtothedesigns,drawingsand
specificationsrecommended bythecontractorand accepted by
thecompetentauthority,thealternationabovereferred to shall bewithinthe scopeofsuch
designs, drawings andspecifications appendedto thetenders.
Thetimelimitforthecompletionoftheworkshallbeextendedin the
proportionthattheincreaseinthecostoccasioned by alterationsbears the costof theoriginal
work and thecertificateof the Engineer-in-chargeasto such proportion shall befinal
41. CashFlow Forecasts
41.1 Whentheprogrammeisupdated,thecontractoristoprovidetheengineer with an updatedcash
Sign.of the Contractor Sign. of the Executive Engineer
42. Paymentcertificates.
42.1 TheContractor shallsubmittotheEngineer monthly statementsof the estimatedvalueofthe
workcompletedlessthecumulativeamountcertified previously.
42.2 TheEngineershallchecktheContractor’smonthlystatementwithin14days and certify
theamountto bepaid totheContractor after takingintoaccount
anycreditordebitforthemonthinquestion inrespectofmaterials forthe
worksintherelevantamountsandunderconditionssetforthinsub-clause32.3oftheContract
Data (securedAdvance).
42.3 Thevalue ofworkexecutedshall bedeterminedbythe Engineer.
42.4 Thevalueofworkexecutedshallcomprisethevalueofthequantitiesofthe items in theBill of
Quantities completed.
42.5 Thevalueofwork executed shallincludethevaluationofvariationsand compensation events.
42.6 The Engineer may exclude any item certified in a previous certificate or
reducetheproportionofanyitem previouslycertifiedinanycertificateinthe light of later
43.1 Paymentsshallbeadjustedfordeductionsforadvancepayments,retention, other recovery in
terms of thecontractandtaxesatsource,asapplicable
underthelaw.TheEmployershallpaytheContractortheamountscertified bythe Engineer
within28 daysofthedate ofeach certificate.
43.2 PaymentofGST(prevailingrates)ontheamountpayableunderthecontract totheContractorwill
bemade by the Employer.Hence,itistheresponsibility ofthecontractorto paytheGSTto
theconcerned Authority.
43.3 Itemsoftheworksforwhichnorateorpricehasbeenenteredinwillnotbe
paidbytheEmployerandshallbedeemedcoveredbyotherratesandprices in theContract.
44. Compensationevents
44.1 The following are compensation Events unless they are caused by theContractor:
(a) The Employer does not give access to a part of the Site by the sitePossession date statedin
Contract data to the Contractor
44.2 In case of compensation event occurs and it prevents the work being completed beyond
theIntended CompletionDatethenAuthority willapprove EOT with eligible
contractualpriceescalation.
Sign.of the Contractor Sign. of the Executive Engineer
45.1 Therates quoted by the Contractormustbeinclusiveofalltaxesprevailing on duedateof bid
submissionexceptGST. However,any subsequent changes in thetax structureby
Governmentafter duedateof bid submissionwill be compensated (+/-) onavailability or
submissionof actual documentation. Contractor will have to intimate Engineerregarding
changes occurred inthe tax structureafterbidsubmission.If thecontractor failsto
providesuch informationand if any financial obligationmay arise due to changes in tax
structure,samewill berecoveredfrom thecontractor.
45.2 GSTwillbepaidseparatelyonthebills.Hence,itistheresponsibilityofthe contractorto
paytheGSTto theconcerned Authority.
46. Currencies.
46.1 All payment shall bemadein Indian Rupees.
47. Price Adjustment
47.1 Contractpriceshallbeadjustedforincreaseordecreaseinratesandpriceof
labour,materials,fuelsand lubricants in accordance with the followingprinciples
andprocedures andas per formulagiven in thecontract data:
(a) Thepriceadjustmentshallapplyfortheworkdonefromthestartdate
giveninthecontractdatauptoend oftheinitialintended completiondate or extension granted
by theEngineer and shallnotapply tothework
carriedoutbeyondthestipulatedtimeforreasonsattributableto the contractor.
(b) Thepriceadjustmentshallbedeterminedduringeachmonthfromthe formulagiven in
thecontract data.
(c) Followingexpressionsandmeaningsduringtotheworkdoneduringeachmonth
R=Total value of work doneduringthe month. Itwouldinclude the amount ofsecured
advancegranted, ifany, duringthe month lesstheamountofsecuredadvance
recovered,ifanyduringthemonth. Itwillexclude value for works executed under variations
for which price adjustment will be worked separately based on the terms mutuallyagreed.
47.2 To the extent that full compensation for any rise or fall in costs to the contractorisnot
coveredbytheprovisionsofthisorotherclauseinthe contract,theunitratesand prices included
inthecontractshall bedeemed to include amounts to coverthe contingency such other riseor
48.1 The Employer shall retain from each payment due to Contractor the proportionstated
intheContractDatauntilCompletionof thewholeof the Works.
Sign.of the Contractor Sign. of the Executive Engineer
48.2 OnCompletionofthewholeofthe Work half the total amount retained isrepaid
48.2 OnCompletionofthewholeofthe Work half the total amount retained isrepaid
totheContractorand half whentheDefects Liability Period has passed and
theEngineerhascertified thatallDefectsnotified by theEngineertothe
Contractorbeforetheendofthis periodhavebeen corrected.
48.3 Oncompletionofthewholeworks,thecontractormaysubstitute retention money with an “on
demand”Bank guarantee.
Incase,ContractorrequestsforrefundoftheRetention Money deducted bythe
Employer under the provisionof thisclause,Employer shall consider the said request of the
Contractor provided that the refund hereundershallbemadeintranches ofnotless
than1%(OnePercent)ofthe Contract Price and Contractor furnishes an irrevocable and
unconditional Bank guaranteefor an equal amount substantially intheformatofBank
GuaranteeforPerformance Guarantee Enclosedwith SBDand validupto60 daybeyond the
scheduled /extendedDefects Liability Period.Oncompletion
ofthewholeworks,thecontractorhas however an option tosubmit afresh irrevocableand
unconditional Bank Guaranteefor an amount equal to5%of thetotal
valueofworkexecutedsubstantiallyin theformat ofBankGuarantee
forPerformanceGuarantee enclosed with SBD and validupto 60daysbeyond the Defect
Liability Period and yet refund the Retention Money Bank Guarantee submitted for
refundofRetention Money.
49. LiquidatedDamages
49.1 TheContractorshallpay liquidated damages to the Employer at the rate perday stated
intheContractDatafor eachday thattheCompletionDateislater thantheIntended
CompletionDate(for thewholeworksor themilestoneas stated
inthecontractdata).Thetotalamountofliquidated damages shallnot exceed
theamountdefined inthe ContractData.The Employermay deduct liquidated damages from
paymentduetotheContractor.Paymentof liquidated damages does not affect
theContractor’s liabilities.
49.2 IftheIntendedCompletionDateisextendedafterliquidateddamageshave
beenpaid,theEngineershallcorrectanyoverpayment of liquidateddamages by theContractor
by adjusting thenextpaymentcertificate.TheContractor shallnotbeentitle for any interest on
the over paymentcalculated fromthe date ofpayment to thedate of repayment.
49.3 Ifthecontractorfailstocomplywiththetimeforcompletion as stipulated in thetender,then
thecontractorshallpaytothe employer therelevant sum stated intheContractDataas
Liquidated damagesfor such default and notas penalty for everydayorpartof day
whichshall elapse between relevant timeforcompletionandthedate stated in the taking over
certificate of the whole oftheworksontherelevantsection,subjecttothe limit state in the
Theemployer may,without prejudice to any other method ofrecovery
deducttheamountofsuchdamagesfromany monies due tobecome due to
thecontractor.Thepaymentordeductionofsuchdamagesshallnotrelieve
Sign.of the Contractor Sign. of the Executive Engineer
thecontractorfromhis obligation to complete the workson from anyotherof his obligations
and liabilities under the contract.
49.4 If,beforetheTimeforCompletion of thewholeof theWorksor,if applicable
anySection,aTakingOverCertificatehasbeen issuedforanypartofthe Worksor
ofaSection,theliquidated damagesfordelay incompletionofthe remainder oftheWorksor of
thatSectionshall,for anyperiod ofdelay after thedatestated insuchTaking– Over-
Certificate,and inthe absence ofalternative provisions in the Contract, be reduced in the
proportionwhichthe valueoftheparts certifiedbears the value of thewholeof theWorksor
Section, asapplicable.TheprovisionsofthisSub– clauseshallonly apply tothe rate
ofliquidated damages andshall not affect the limit there of.
50.1 Ifthecontractorachievescompletionofthewholeoftheworkspriortothe intended
CompletionDateprescribed inContractDatatheEmployershall pay tothe contractor a sum
stated inContractDataasbonusforeverycompleted monthbutsubjectedtomaximum
amount asstatedin ContractData; which shallelapse betweenthedateof completionof all
itemsofworksas stipulatedinthecontract, including variation order bytheEngineerand
thetime prescribedin Clause17.
50.2 BonusshallbepaidonlytoworksamountingtoaboveINR5crorewithtime limitoftheworksis
equal or more than 6months.Thebonuswouldbepaid as under
% of Time Saved % of Initial Contract Price
entitledforBonus
Less than 10% 0%
51. Advance Payment.
51.1 TheEmployershallmakeadvancepayment(nottobepaidlessthantwo installments
exceptinspecialcircumstances for which the reason to be
Recordedinwriting)totheContractoroftheamountsstated inthe Contract Date by the
date stated in the Contract Date, against provision by the Contactor of an
Sign.of the Contractor Sign. of the Executive Engineer
Unconditional BankGuarantee Formatbya bank acceptable to the Employer in
amounts and currencies request at least
110%oftheadvancepayment.Theguaranteeshallremain effective until the
advancepaymenthas beenrepaid,buttheamountoftheguaranteeshallbe progressively
reduced the amountrepaid bytheContractor.The Mobilization Advance Would
Bedeemed interest bearing advance atan interest rate of 10% to becompounded,
51.2 TheContractoristousetheadvancepaymentonlytopayforEquipment, plantand
Mobilization expensesrequiredspecificallyforexecutionofthe Works. The
Contractor shalldemonstrate that advancepaymenthasbeen
usedinthiswaybysupplyingcopiesof invoice or other documents to the engineer.
51.3 Theadvancepaymentshallberepaidbydeduction proportionate amountfrom
paymentsotherwiseduetothe Contractor,followingthescheduleof completed
percentages oftheWorksonapaymentbasis.Noaccount shallbe
takenoftheadvancepaymentorit repayment assessing valuation ofwork done,
variations, price adjustments, Compensation Events, or Liquidated damages.
52.1 The performance Security (including additional security for unbalanced bids)
shallbeprovidedtotheEmployer no later thanthedatespecifiedinthe Letter
ofAcceptanceand shall beissued in an amount andformand byabank or surety
acceptable to theEmployer,anddenominated inIndianRupees.The
performanceSecurityshallbevalid until date 60 days from the date of expiry
ofDefects Liability Period and theadditionalsecurity forunbalanced bids shall be
valid until date 28 days from the date of issueof thecertificate ofcompletion.
54. CostofRepairs.
54.1 LossordamagetotheWorksorMaterialstobe incorporated in theWorks betweenthe
Startdate andthe endofDefectsCorrectionperiodsshall be remedied by theContractor
attheContractor’scostif thelossordamages arises from theContractor’s acts
Sign.of the Contractor Sign. of the Executive Engineer
E. FINISHINGTHECONTRACT
55.1 TheContractorshallrequestthe EngineertoissueaCertificate ofCompletion
oftheworksandthe Engineerwilldosoupondecidingthattheworkis completed.
56. Taking Over
TheEmployershalltakeovertheSiteandtheWorkswithinsevendaysoftheEngineerissu
inga certificate of Completion.
57. Final Account
57.1 TheContractorshallsupplytotheEngineeradetailedfinalaccountofthe total amount that
57.1 TheContractorshallsupplytotheEngineeradetailedfinalaccountofthe total amount that
theContractorconsiders payableas full andfinal settlement of all claims under the
Contract for items before the end of the Defects Liability Period.TheEngineer shall
issueaDefect Liability Certificateand certifyanyfinal paymentthatisdue tothe
Contractorwithin56 daysof receivingtheContractor'saccount if it is corrected
complete.Ifitisnot,the Engineershallissuewithin56daysaschedulethatstatesthescope
ofthe correctionsoradditionsthat arenecessary.IftheFinalAccount isstill unsatisfactory
after ithas beenresubmitted,theEngineer shalldecideonthe amountpayabletothe
Contractorandissueapaymentcertificate,within56 days of receivingtheContractor’s
revisedaccount.
57.2 Ifreversal is characteristicoftender(L1 becoming L2)onaccountofexcesses and
savingsinfinalaccountisobserved,theEngineer/Employer shall beat liberty
torestrictthefinal paymentof BOQitemstothelowestamount
evaluatedofthebidsconsideringthefinal quantities andtherates quoted including the
rebate if any.Paymentofvariationitemsshall howevermake at the rates approved by
the Employer, within 90 days from the physical completion of work.
58. Operating andMaintenance Manuals
58.1 If “as built” drawings and/or operating and maintenance manuals are
required,theContractor shallsupply them by thedatesstated intheContract data.
58.2 IftheContractordoesnotsupplytheDrawingsand/ormanualsbythedates stated
intheContractdata,ortheydonotreceivetheEngineer’sapproval,the Engineer shall
withhold the amount stated in the Contract Data from payments dueto theContractor.
59. Termination
59.1 The Employer or theContractor may terminatetheContractif theother party causes a
fundamental breach oftheContract.
Sign.of the Contractor Sign. of the Executive Engineer
59.2 FundamentalbreachesofContractinclude,butshallnotbelimitedtothe following:
1. The contractor stops work for 28 days when no stoppage of work is
shownonthecurrentprogrammeandthestoppagehas not been authorizedbythe
2. TheEngineerinstructs theContractortodelaytheprogressoftheWorks andthe
instructions are not withdrawn within 28 days;
3. TheEmployer or theContractor is made bankruptgoesinto liquidation otherthan
fora reconstructions oramalgamation.
4. ApaymentcertifiedbytheEngineerisnotpaidbytheEmployertotheContractor within
56days ofthedateofthe Engineer’s certificate.
5. TheEngineergivesNoticethatfailureto correct particular Defect is afundamental
breach of Contract and the Contractor fails to correct it within a
reasonableperiod of time determined bythe Engineer;
6. TheContractor does not maintain a securitywhich is required;
7. TheContractorhasdelayedthecompletionofworksbythenumberof
daysforwhichthemaximumamountofliquidated damagescanbe paid as definedin
theContract data;and
8. If theContractor,inthejudgmentof the Employer hasengaged incorrupt or
fraudulent practices in competing fororin executingtheContract.
For the purposeof this paragraph: “corrupt practice”means the
offering,giving,receiving or soliciting of anything of valueto influencethe
actionofapublic official in the procurement processcontract execution.
“Fraudulentpractice” means misrepresentation of facts in ordertoinfluence a
procurement processor theexecutionofacontracttothedetrimentof the borrower,and
includes collusive practice among Bidders(prior to or for bid submission) designed
to establish bid prices at artificial non-competitive levels to deprivethe Borrower of
the benefits of free andopen competition.
59.3 When either party to the Contract gives notice of a breach of contract to the
Engineerforacauseotherthanthoselisted under SubClause59.2above,the Engineershall
decide whether the breach is fundamental ornot.
59.4 Not with standing theabove,theemployer may terminatetheContractfor convenience.
60. Payment uponTermination
60.1 IftheContractis terminated because of a fundamental breach of Contract by
theContractor,the Engineer shall issueaCertificatefor thevalueof thework done less
advance payments received up to the date of the issue of thecertificate,
Sign.of the Contractor Sign. of the Executive Engineer
lessother recovery due in terms of thecontract,lesstaxesdueto deducted at source as
per applicable law andless the percentage to apply to thework notcompleted
asindicated intheContractdata.Additional Liquidated Damagesshall notapply.If
thetotal amountduetothe Employer exceedsanypayment
duetotheContractorthedifferenceshallbeadebt payableto the Employer.
60.2 IftheContractisterminatedattheEmployer’sconvenienceorbecauseofa
fundamentalbreachofContractbytheEmployer,theEngineershall issuea certificatefor
thevalueof theworkdone,thecostof balancematerial brought by the contractor
andavailable at site, the reasonable cost of removal of equipment,repatriationof
theContractor’s personnel employed solely onthe
works,andtheContractor’scostofprotectingandsecuringtheWorksand
lessadvancepaymentreceived uptothedateofthecertificate,lessother
recoveriesdueintermsofthecontract andlesstaxesdueto deductedat sourceas
perapplicablelaw.
61.1 AllmaterialsontheSite,PlantEquipments,Temporary Worksand Worksare deemed to
bepropertyoftheEmployer,iftheContractisterminatedbecause ofa Contractor’s default.
62. Release from Performance
62.1 IftheContract is frustrated by the outbreak of war of any other event outsidethecontrol
of either the Employer or theContractor the EngineershallcertifythattheContracthas
beenfrustrated.TheContractor shallmaketheSite Safe and Stop Work as Quickly as
Possible afterreceiving thiscertificateandshallbepaidforallworkcarriedoutbefore
receiving it and forany workcarriedout afterwards to which commitment was made.
Sign.of the Contractor Sign. of the Executive Engineer
F. SPECIAL CONDITIONSOF CONTRACT
TheContractorshall,unlessotherwiseprovided intheContract, make
hisownarrangementsfortheengagementofallstaffandlabour,localor other,andfor their
payment ofhousing,feedingandtransport.
TheContractor shall,if required by the Engineer,deliver tothe Engineer return
in detail, in such form and at such intervals the Engineer may prescribe,showing
thestaffand thenumbersoftheseveralclassesof labourfromtimetotimeemployed by the
Contractor onthesiteand such otherinformation as the Engineermay require.
64. COMPLIANCEWITH LABOUR REGULATIONS
Duringcontinuanceofthecontact, theContractorand hissub- contractor
shallabideatalltimes by allexisting labour enactmentsand rules made
thereunder,regulations,notification andbylaws of the State or central Governmentor
localauthority and any other labour law (includingrules),
regulations,byelastomersbepassed or notificationsthatmay beissued
underanylabourlawinfuture either by theStateortheCentralGovernment
orthelocalauthority.Salientfeaturesofsomeofthemajorlabourlawsthat areapplicableto
theconstruction industry are given below.TheContractor shallkeeptheEmployer
indemnified incaseany actionistakenagainstthe
Employerbythecompetentauthorityonaccountofcontraventionofanyof the provisions
of any Act or rules made thereunder, regulations or notificationsincluding
amendments.Ifthe Employeriscaused to pay or reimburse,such amountsasmay
benecessary tocauseor observe,or for observanceoftheprovisions stipulated
inthenotifications/bye laws/Acts/Rules/regulations including amendments,ifany,on
thepartofthe Contractor,the Engineer/employer shall havetherighttodeductanymoney
duetotheContractor including isamount ofperformancesecurity.The
Employer/Engineer shall also havetherightto recoverfromtheContractor any
sumrequired or estimated to berequired for makinggood thelossor
damagesufferedbytheEmployer.
The Employees oftheContractorandthe Sub-Contractorin no caseshall be
treatedas theemployees ofthe Employerat anypoint to time.
Sign.of the Contractor Sign. of the Executive Engineer
SALIENT FEATURES OF SOME MAJOR LABOUR AND OTHER LAWS APPLICABLE
TOESTABLISHMENTS ENGAGED IN BUILDING AND OTHER CONSTRUCTION WORK
A) WorkmenCompensationAct1923:-TheActprovidesforcompensationin
caseofinjurybyaccident arisingout ofand duringthecourseofemployment.
B) PaymentofGratuityAct.1972:- Gratuity Is Payable toan employee under theActon
Satisfaction Ofcertain conditions on separation of an employee has completed
5yearsserviceor moreondeath,therateof15dayswagesfor every
completedyearofservice.TheActisapplicabletoallestablishmentsemploying
10ormore employees.
C) EmployeesP.F.andMiscellaneousProvisionAct1952:-TheActProvidesfor
monthlycontributions bythe employer plusworkers@ 10%or 8.33%The benefits
payableundertheAct are:
1. Pension or familypension on retirement or death,as thecasemaybe.
2. Deposit linkedinsuranceon thedeathin harness oftheworker.
3. Payment ofP.F. accumulation on retirement/deathetc.
D) Maternity Benefit Act 1951:-The Act provides for leave and some other benefits to
women employees in caseofconfinement ormiscarriageetc.
E) ContractLabour(Regulation&Abolition)Act1970:- TheActprovidesfor certain welfare
measures to beprovided by theContractortocontractlabourand incasethe
Contractorfailstoprovide,the samearerequiredtobe provided,by thePrincipal Employer by
Law.Theprincipal Employerisrequired totake CertificateofRegistrationand
theContractorisrequiredtotakelicensefromthe designated
Officer.TheActisapplicabletotheestablishmentsor Contractor of Principal Employer, if
they employ 20ormorecontract labour.
F) MinimumWagesAct1948:-TheEmployerissupposedtopaynotlessthanthe
MinimumWagesfixedbyappropriateGovernmentasperprovisions oftheAct,if
theemploymentisascheduled employment.Constructionof Building,Roads, and Runways
arescheduledemployment.
G) PaymentsofwagesAct1936:-It lay down to by whatdatethewagesareto
bepaid,whenitwillbepaidandwhatdeductionscanbemadefromthewages oftheworkers.
H) Equal remunerations Act1979 :- The Act provides for payment of equal
wagesforworkofequalnaturetoMaleandFemaleworkersand for notmaking discrimination
against female employees in the matter oftransfer,training and promotions etc.
I) PaymentsofBonusAct1965:-TheAct isapplicabletoallestablishments
employing20ormore employees. The Actprovidesforpaymentsofannual bonussubjectto
aminimumof8.33%ofwagesandmaximumof20%ofwages toemployeesdrawingRs.3500/-
permonthorless.Thebonusto bepaidto employeesgetting Rs, 2500/-per month or
aboveRs.3500/-per month shall be workedoutbytakingwagesasRs.2500/-
permonthonly.TheActdoesnot
Sign.of the Contractor Sign. of the Executive Engineer
Applytocertain establishments.Thenewlyset-upestablishmentsareexempted
forfiveyearsincertaincircumstances.Some oftheState Governmentshave
reducedtheemploymentsizefrom20 to10for thepurpose of applicability of this Act.
J) Industrial Disputes Act 1947:-The Act lays down the machinery and
procedureforresolutionsofIndustrialdisputes, in what situationsa strike or lock-out
become illegal landwhataretherequirementsforlaying offor retrench the employees
orclosing down theestablishment.
K) Industrialemployment(standingOrders)Act1946:-Itisapplicabletoall establishment
employing100 or moreworkmen(employmentsizereduced by someoftheStateand
CentralGovernmentto50).TheActprovidesforlaying down rulesgoverning the conditions
of employment by theEmployer on matters provided in the Act and gets the same
certified by the designatedAuthority.
L) TradeUnionsAct1926:-TheActlaystheprocedureforregistrationoftrade
unionsofworkmenand employers.TheTradeUnionsregistered under theAct havegiven
certainimmunitiesfrom civil andcriminal liabilities.
M) Child Labour (Prohibition &Regulation Act 1986 :-The Act prohibits employment of
children below 14 years of age in certain occupations and processand
providesforregulationofemploymentofchildreninallother occupations andprocesses.
Employment ofChild Labourisprohibitedin Building and Construction Industry.
StateMigrantworkmen’s(RegulationofEmployment&Conditionsofservice)Act1979:
-The Actisapplicable to an establishment which employs 5ormore inter-state
migrantworkmen through an intermediary(whohasrecruited workmen one state
foremployment in the establishment situated in anotherstate).The inter-state migrant
workmen, is a establishment towhich this Act becomes applicable,arerequiredto
beprovide certainfacilities such as housing,medicalaid,traveling
expensesfromhomeuptotheestablishmentandback,etc.
O) TheBuildingandOtherConstructionworkers(RegulationofemploymentandConditio
nsofService)Act1996 andtheCessActof1996:-All the establishmentswhocarry onany
building or other constructionswork and employ 10ormoreworkers arecovered underthis
Act.Allsuchestablishmentsarerequiredtopay cess at the rate not exceeding
2%ofthecostofconstructionasmay bemodified by thegovernment.TheEmployerof
theestablishment isrequiredtoprovidesafety measures the Buildingor construction work
and otherwelfaremeasures,suchascanteens,FirstAid facilities,Ambulance, Housing
accommodationsfor workersnear theworkplace etc. The Employer to whom the Act
applies has to obtain a registration certificate from theRegistering Officers
appointedbytheGovernment.
Sign.of the Contractor Sign. of the Executive Engineer
P) FactoriesAct1948:-TheActlaysdowntheprocedureforapprovalofplans before settingup a
factory, healthandsafetyprovisions, welfare provisions, working
hours,annualearnedleaveandrendering informationregarding accidentsor dangerous
occurrence to designated authorities.Itisapplicableto premisesemploying 10 persons or
more with aid of power or 20 or more persons without theaidofpowers engaged in
themanufacturingprocess.
Q) Royaltycharges :-Thecontractorshallpaytheroyaltytothecompetent authority
asperrule.Theroyaltychargespaidshallbebornebythe
contractorandshallnotbereimbursedbytheEmployer.
R) Following Pollution control Acts and amendments made thereoffrom time
to time shall be applicable.
1. Water(PreservationandcontrolofPollution)Act,1974
2. Air(PreventionandControlofPollutionAct
3. Environmental(Protection)Act1986
The contractor must commit to adoptingEnvironmental
managementplanforbestenergyuse,wastemanagement,thereduction
ofpollutionasinEMS(EnvironmentalManagementsystem)ISO-14001-2015
65. ARBITRATION (GCC Clause 24)
Theprocedure for arbitrationwill beas follows:-
24.1 IftheContractorisoftheviewthat adecision takenbythe Engineer waseither
outsidetheauthority giventotheEngineer by theContractorthatthedecision
waswronglytaken,thedecisionshallbe referredto#Superintending Engineer (Higher
Authority) within 14 days of the notification of the
Engineer'sdecision.Iftheissueisnotresolved,any partycanreferthematter
forconciliationwithin15daysfromthedecisiongivenby the#Superintending Engineer.
24.2 (a) For the work upto Rs.100 Cr., if any of the parties is not satisfied with the
decision of the # Superintending Engineer, both the parties have to refer to the #
Chief Engineer concerned for the conciliation process.
(b) For the work more than Rs.100 Cr., if any of the partiesis not satisfied with the
decision of the Superintending Engineer, both parties have to refer to the #
Secretary, Roads & Building Department, Government of Gujarat for the
conciliation process. If the disputeis not resolved through the conciliation process,
contractor may refer the dispute to Gujarat Public Works Contract Dispute
Arbitration Tribunal. If the Contractor failed to refer a claim / dispute to the Higher
Authority within 14 days of the notification of the Engineer's decision, the
Contractor shall not been titled to any additional payment / claim if he doesn't
follow the above sequence of stipulated time. However, during such period, he
would not stop the work in any case.
Sign.of the Contractor Sign. of the Executive Engineer
Sign.of the Contractor Sign. of the Executive Engineer
Item marked“N/A”donotapplytothis Contract. Clause Reference
withrespect to section
1. The Employers is
Name : Secretary, (R&B) Department, Govt. of Gujarat
Address:2nd FloorBlock No. 14,New Sachivalaya, Gandhinagar
Name of authorized Representative (will be intimated later)
2. The Engineer is TheExecutive Engineer, Panchayat(R&B) Division,
Name of Authorized Representative:Shri.
3. The Defects Liability Period is 12 (Twelve) Months from the date of [CL.1.1&33]
4. The Start Date shall be 1 days for the date of issue of the Notice to [CL.1.1]
proceed with the work.
5. The Intended Completion Date for the whole of the works is [CL.1.1,17&2]
3 Months after start of work with the following mile stones:
Milestone dates: [CL.2.2&49.1]
Physical works to be completed Period from the start date
Milestone 1 i.e10% 9 Days.
Milestone 2 i.e40% 36 Days.
Milestone 3 i.e80% 72 Days
Milestone 4 i.e100%90 Days
6. The Site is located at villages of Nakhatrana Taluka viz. Angiya [CL.1.1]
7. The name and identification number of the Contract is: [CL.1.1]
8. The works consist of…Building Work…with items as per B.O.Q. The [CL.1.1]
works shall, interalia, include the following, as Specified or as
Site clearance; setting – out and layout; widening of existing carriage way
and strengthening including camber corrections; construction of new road /
Parallel service road; bituminous pavements remodeling / construction of
Junctions, inter sections, busbays, lay-bays; supplying and placing of
drainage Channels, flumes, guard posts and guard other related items;
construction / extension of cross drainage works, bridge, approaches and
other related stones; protective works for roads / bridge; all aspects of
quality assurance of various components of the works; rectification of The
defects in the completed works during the Defects Liability Period;
submission of “As-built’’ drawings and any other related documents; and
other item of work as may be required to be carried out for completing the
work in accordance with the drawings and the provisions of the contract and
to ensure safety.
(B)Bridge Works
Siteclearance;settingout,provisionoffoundations,piersabutments
Andbearing;prestressed/reinforcedcementconcretesuperstructure;
Wearingcoat,handrailings,expansionjoints,approachslabs,drainages
Spouts/ downtake pipes, arrangements for fixing light posts, water
mains, utilities etc; provision of suitably designed protective works;
Providingwing/returnwalls;provisionofroadmarkings,roadsigns
etc.;allaspectsoqualityassurance;clearingthesiteandhandingover
Theworksoncompletion;rectificationofthedefectsduringtheDefects
Liability Period and submission of “As-built” drawings and other
Relateddocuments;andotheritemsofworkasmayberequiredtobe
Carriedoutforcompletingtheworksinaccordancewiththedrawings
Andthe provisionsof thecontractandto Insure safety
(C)OtherItems [CL.1.1]
AnyOtherItemsasrequiredto fulfill allcontractual obligationsasper the Bid
10. The followingdocumentsalso formpartof the Contract: [CL.2.3(9)]
Asperclause 2-3
11. The law which appliesto the Contract isthe lawof Unionof India [CL.3.1]
12. The language of the ContractdocumentsisEnglish [CL.3.1]
13. Limitofsubcontracting 25% of the InitialContract Price [CL.7.1]
14. TheSchedule of OtherContractors [CL.8]
15. TheSchedule of Key Personnel Asper Annex– II to SectionI [CL.9]
16. Theminimuminsurancecoverforphysicalproperty,injuryanddeath [CL13]
IsRs.5lakhsperoccurrencewiththenumberofoccurrenceslimited
Tofour.Aftereachoccurrence,thecontractorwillpay additional
premium necessary to make insurance valid for four occurrences
17. Site Investigation report [CL.14]
18. The Site Possession dates shall be Available from 1st day of Work Order [CL.21]
19. Theperiodforsubmissionofprogrammeforapprovaloftheengineer shall be21 [CL.27.1]
daysfrom theissueofLetterof Acceptance.
20. The periodbetween program updates will be 10.days. [CL.27.3]
21. The amount to be withheld for late submission of an updated programme [CL.27.3]
22. Thefollowingevents shall also beCompensation Events [CL.44]
Substantially adverse ground conditions encountered during the
Courseofexecution ofworknot provided forin the bidding document.
(i) Removal of underground utilities detectedsubsequently
(ii) Significant changes in classification ofsoil requiring additional
mobilization bythecontractor,e.g.ordinarysoil to
rockexcavation,
(iii) Removal of unsuitablematerial likemarsh,debris dumps,
etc.not causedbythecontractor.
Sign.of the Contractor Sign. Of the Executive Engineer
(iv) Artesian conditions
(iv) Seepage,erosion landslide
(v) Rivertraining requiringprotection ofpermanent work
(vi) Presenceofhistorical,archeological orreligious structures,
monuments interfering with theworks
(viii) Restriction ofaccess to groundimposedbycivil, judicial,or
militaryauthority
23. ThecurrencyoftheContract is Indian Rupees [CL.46]
24. The formula(e) foradjustmentof prices areas under: [CL.47]
If any of the commodities like Cement, Steel or Bitumen are not found applicable in a work,
the weight component of that commodities {i.e. ‘Cement’ (Pc), ‘Steel’ (Ps) or ‘Bitumen' (Pb)
as indicated in SBD for the purpose of Price Adjustment} shall be clubbed with the weight
component of ‘Other Material’ (Pm), such that the gross % weight of the components shall
remain as 100%.
R = value of work as defined in Clause 47.1 of Conditions of Contract
(i) Price adjustment for increase or decrease in the cost due to labour shall be paid in
accordance with the following formula:
Adjustment for labourcomponent
VL= Increase or decrease in the cost of work during the month under consideration due
to changes in rates for local labour
L0= The consumer price index for industrial workers for the State on 28 days
preceding the scheduled date of opening of technical Bids as published by Labour
Bureau, Ministry of Labour, Government of India
Li=The consumer price index for industrial workers for the State for the month under
consideration as published by theLabour Bureau, Ministry of Labour, Government
Pl= Percentage of labor component of the work.
Adjustment for cementcomponent.
(ii) Pricesadjustmentforincreaseordecreaseinthecostof cement procuredbythecontractor
Vc=0.85x(Pc/100) xRx(Ci– C0)/C0
Vc= Increaseordecreaseinthecostofworkduringthe
monthunderconsiderationduetochangesin rates forcement.
C0= Theall IndiawholesalepriceindexforOrdinary Portland Cement on28days
precedingthe scheduleddateof openingoftechnical bidas published by
theOfficeof theEconomicAdviser, Departmentfor
PromotionofIndustryandInternal Trade,Ministry ofCommerce &Industry.
Sign.of the Contractor Sign. Of the Executive Engineer
Ci=TheallIndiaaveragewholesalepriceindexforOrdinary PortlandCementforthemonth
underconsiderationas published by Office of the Economic Adviser,
Departmentfor PromotionofIndustryandInternal Trade,Ministry ofCommerce
Pc =Percentageofcement component ofthework
Adjustment for steelcomponent
(iii) Priceadjustmentforincreaseordecreaseinthecostofsteelprocuredbythe
contractorshall be paidin accordancewith thefollowingformula
Vs =0.85x(Ps/100)xRx(Si– S0)/S0
Vs= Increaseordecreaseinthecostofworkduring themonth under consideration dueto
changes in therates forsteel
So= The all India wholesale price index for steel (Mild Steel - Long Products
Rebars)on28daysprecedingthedateofopeningofBidsaspublishedby the
OfficeoftheEconomic Adviser,DepartmentforPromotionofIndustryand
InternalTrade,MinistryofCommerce &Industry.
Si= TheallIndiaaveragewholesalepriceindexforsteel(MildSteel-Long Products
Rebars) for the month under consideration as published by
OfficeoftheEconomic Adviser,DepartmentforPromotionofIndustryand
InternalTrade,MinistryofCommerce &Industry.
Ps= Percentageofsteel component ofthework
Note:Fortheapplication ofthis clause,theindexofMild Steel- Long
productsRebarshas been chosen to representthesteel group.
Adjustments ofbitumencomponent
(iv) Priceadjustmentforincreaseinthecostofbitumenshallbepaidin accordancewith
thefollowing formula
Vb= 0.85x(Pb/100) xRx(Bi– B0)/B0
Vb= Increaseor decreasein thecost of workduringthemonth under consideration dueto
changesin rates forbitumen.
Bo= theofficialretailpriceofbitumen theIOCdepotatthe
nearestcentreontheday28dayspriortothescheduleddateofopeningof technical bid.
Bi= theofficialretailpriceofbitumenofIOCdepotatthe
nearestcentreforthe15 dayofthemonth underconsideration.
Pb= Percentageofbitumen component ofthework.
Sign.of the Contractor Sign. Of the Executive Engineer
AdjustmentofPOL (fuel andlubricant) component
(v) Price adjustment for increase or decrease incost of POL (fuel and
lubricant)shall be paidin accordancewith thefollowing formula
Vf= Increaseor decreasein thecost of workduringthemonthunder consideration dueto
changes in ratesfor fuel andlubricants.
Fo= Theofficialretailpriceof High Speed Diesel (HSD) attheexisting consumer pumps
of IOC at the nearest centre on the day 28 prior to thedate ofopeningofBids.
Fi= Theofficialretailpriceof HSD at the existing consumer pumpsof
IOCatthenearestcentreforthe15thday ofthemonthoftheunder consideration.
Pf= Percentageof fuelandlubricants component ofthework
Note: For theapplicationof thisclause,thepriceof High-Speed dieselOilhas beenchosen
to represent thefuel andlubricants group.
Adjustment for ConstructionMachinery
(vi) Priceadjustmentfor increaseor decreaseinthecostof plantand Machinery spare
procured by the Contractor shall be paid in accordancewith thefollowing
Vp= Increaseor decreasein thecost of workduringthemonth under consideration dueto
changes in rates forplantandmachineryspares
P0= TheallIndiawholesalepriceindexformanufacturerof
machineryformining,quarrying andConstruction forthemonth under
considerationas published Officeofthe EconomicAdviser,
DepartmentforPromotionofIndustry andInternalTrade, Ministry
ofCommerce& Industry.
Pi= TheallIndiaaveragewholesalepriceindexformanufacturerof machinery for
mining, quarrying andConstruction for themonth under considerationas
published Officeofthe EconomicAdviser,
DepartmentforPromotionofIndustry andInternalTrade, Ministry
ofCommerce& Industry.
Pp= Percentageofplant andmachineryspares component ofthework.
Note: Fortheapplication ofthis clause,indexofHeavyMachineryandpartshas beenchosen
to represent thePlant andMachinerySpares group
Sign.of the Contractor Sign. Of the Executive Engineer
Adjustmentofothermaterials Component
(vii) Priceadjustmentforincreaseordecreaseincostoflocalmaterials
otherthancement,steel,bitumenand POLprocured bythecontractor shall be paidin
accordancewith thefollowingformula
Vm= Increaseordecreaseinthe costofworkduringthemonthunder consideration due to
change inratesforlocalmaterialsotherthan cement,steel, bitumen andPOL.
M0= TheAllIndianwholesalepriceindex(allcommodities)on28 days preceding
thescheduled dateofopening oftechnicalBids,as published by theOffice ofthe
EconomicAdviser, Departmentfor
PromotionofIndustryandInternalTrade,MinistryofCommerce& Industry.
Mi= TheAll Indiawholesalepriceindex(allcommodities)forthe month under
consideration as published by the Office of the
EconomicAdviser,DepartmentforPromotionofIndustry and Internal Trade,
Ministry ofCommerce & Industry.
Pm= Percentageoflocal material components(otherthan cement, steel, bitumen
andPOL) ofthework.
Thefollowing percentage will govern the price adjustment for the
entirecontract:
1. Labour-Pl 23.42%
2. Cement – Pc 13.85%
3. Steel - Ps 14.41%
4. Bitumen – Pb 00.00%
6. Plant & MachinerySpares -Pp 05.86%
7. OtherMaterials - Pm 34.87%
25. The proportion ofpayments retained(retentionmoney) shallBe6% {CL.48}
fromeach bill subject to a maximum of 5%of final Contractprice.
26. Amount ofLiquidateddamages for ForWholeof work{CL.49}
Delayin completion of works (1/2000)thoftheInitial contract
price,roundedoffto thenearest
Thousand, per day. Forsectional
Completion (wherever specified
Initem 6of Contract data)
(1/2000)thof initial contract price
for # 5 kmSection,roundedoff
to the nearest Thousandper day.
Sign.of the Contractor Sign. Of the Executive Engineer
27. Maximumlimit ofliquidated damages 10percent oftheInitial {CL.49}
For delay in completion work Contract Price roundedoff to
the nearest thousand
28. Amount ofBonus forearlycompletionAmount ofbonus forearly completion
of workshall begiven
asper CL.50 of Section -
29. Maximum limit ofbonus forearly5percentoftheContract {CL.50}
Completion of work Price
30. Theamount oftheadvance payment are: {CL.51&52}
# Nature ofAdvances Amount(Rs.) Conditions to
i Mobilization 10% ofthecontract Price On submission of unconditional
BankGuarantee.(Tobedrawn
beforetheendof 20% ofthe contract
period).Thecontractor may furnish
fourbankguarantees of 2.5% ofeach
valid forthefullperiod.
ii Equipment 90%fornewand50%of After recruitment is brought to site
depreciated valuefor old (provided the Engineer is
equipment.Total amount satisfiedthattheequipment is
will besubjectto a requiredforperformance ofthe
maximum of 5%of the contract) and onsubmissionof
Contract Price unconditional BankGuarantee
foramount ofadvance.
iii Secured Deleted
erialbrought to
(TheadvancepaymentwillbepaidtotheContractornolaterthan28daysafter fulfillment
oftheaboveconditions).
31. Repaymentofadvance payment for mobilizationandequipment{CL.51.3}
theadvanceloanshallberepaidwithpercentagedeductionfrom the interim payments
certified by the Engineer under the Contract. Deduction
shallcommenceinthenextInterimPaymentCertificatefollowingthatinwhichthe
Sign.of the Contractor Sign. Of the Executive Engineer
total of all such paymentsto theContractor hasreached notlessthan20 percent
oftheContractPriceor6(six)monthsfromthedateof paymentoffirst
installmentofadvance,whichever periodconcluded earlier,andshallbemadeat
therateof20percent(collectivelyfor
bothMobilizationAdvanceandEquipmentAdvance)oftheamountsofallInterim
Payment Certificate until
suchtimeastheloanhasbeenrepaid,alwaysprovidedthattheloanshall be completely
repaidprior to the expiry of the original time for completion pursuant to
33. Thesecurities shall beforthefollowingminimum amounts equivalent {CL.52} As a
percentageoftheContract
Price:PerformanceSecurityfor5percentofcontractpriceplusRs……………..
(tobedecidedafterevaluationofthebid)asadditionalsecurityintermsofITBClause29.5The
standardformofPerformancesecurityacceptabletotheEmployershallbe
anunconditionalBankGuaranteeof thetypeas presented in Section8 of the
BiddingDocuments.
34. The Scheduleof OperatingandmaintenanceManuals…..N/A. {CL.58}
35. Thedatebywhich“as–built”drawings(inscale as directed)in2sets {CL.58}
arerequiredwithin28daysoft issue of certificate of completion of the whole orsection
ofthework,as thecasemaybe.
36. Theamounttobewithheldforfailingtosupply“asbuilt”drawings{CL.58}by theDate
requiredis Rs.0.00. Lakhs.
37. Thefollowingeventsshallalsobefundamentalsbreachofcontract: {CL.59.2} “The
Contractorhas contravenedSub- clause7.1and Clause9ofGCC”
38. The percentageto applythevalueoftheworknot completed representing{Cl.60}the
Employer’s additional cost forcompletingtheWorks shall be20percent.
Sign.of the Contractor Sign. Of the Executive Engineer
TECHNICAL SPECIFICATION
----------------Attached Seperately ---------------
Sign.of the Contractor Sign. Of the Executive Engineer
Sign.of the Contractor Sign. Of the Executive Engineer
Description oftheWorks:
1. WeoffertoexecutetheWorksdescribedaboveand remedyanydefectsthereinin
conformity withtheconditionsofContract,specification, drawings,BillofQuantities and
2. We undertake, if our Bid is accepted, to commence the Works as soon as is reasonably
possible after thereceiptof theEngineer’snoticetocommence,and to
completethewholeoftheWorksintheContactwithinthetimestated inthe document.
3. We agreed this beforethe period of 120 Days from the date fixed forreceiving thesameand
itshallremain binding uponitand maybeaccepted atany time beforetheexpiration ofthat
4. Unless and until formal Agreement is prepared and executed this is, to
getherwithyourwrittenacceptancethereof,shall constitute a binding contract between us.
5. Weunderstand thatyouarenotbound toacceptthelowestorany tenderyoumay receive.
Dulyauthorizedto sign bids forandon behalfof---------------------------------------------------
(Inblockcapitals ortyped)
Sign.of the Contractor Sign. Of the Executive Engineer
Sign.of the Contractor Sign. Of the Executive Engineer
BILL OFQUANTITIES
Sign.of the Contractor Sign. Of the Executive Engineer
BILL OF QUANTITIES
1. The bill ofQuantitiesshall beread in conjunction with theInstructionstoBidder,
Conditions of Contract,Technical SpecificationsandDrawings.
2. ThequantitiesgivenintheBillofQuantitiesareestimatedandprovisional,and aregiven to
provideacommon basis forbidding.The basis ofpaymentwill bethe actual quantitiesof
work ordered and carried out,asmeasured by theContractor and verified by theEngineer
and valued attheratesand pricestendered inthe priced
BillofQuantities,whereapplicable,and otherwiseatsuchratesand prices as the
Engineermay fix within theterms oftheContract.
3. TheratesandpricestenderedinthepricedBillofQuantitiesshall,exceptinso far as it is
otherwiseprovided under the Contract, include all constructional plant, layout,
supervision, materials, erection, maintenance, insurance, profit, taxesand
duties,togetherwithallgeneralrisks,liabilitiesand obligationssetout orimpliedin
4. Therates andprices shall bequotes entirely IndianCurrency.
5. A rateor pricesshallbeentered against each item intheBill Quantities,whether quantities
arestatedornot.ThecostofItemsagainstwhichContractorhasfailed to enter rate in price
shallbedeemedtobe covered byotherratesand prices enteredin theBill of Quantities (in
caseof Item rate contract).
6. Thewholecostofcomplying withtheprovisionsoftheContractshallbeincluded intheitems
providedinthepricedBillofQuantities,andwherenoItems
areprovidedthecostshallbedeemedto bedistributed among theratesandprices entered
fortherelateditems ofWork.
7. General direction anddescription soft work and materials are notnecessarily repeated or
summarized intheBillofQuantities.Referencestotherelevant
sectionsofthecontractdocumentationshall bemadebeforeenteringratesor prices against
each item in theBill of Quantities.
8. Themethod ofcompleted work of paymentshall beinaccordancewiththe
specificationforRoadand Bridgeworks.Forbuildingworksspecificationsfor buildingareto
9. ErrorswillbecorrectedbytheEmployerforanyarithmeticerror pursuant to Clause
29oftheInstructions to Bidder.
10. Rockisdefinedasallmaterialswhich,intheopinionoftheEngineer,required blasting, or the
use of metal wedges and sledgehammers, or the use of compressed airdrillingfor
itsremoval,andwhich cannot beextractedby ripping with a tractorofat least 150kwwith a
single rear mounted heavy duty ripper.
Sign.of the Contractor Sign. Of the Executive Engineer
BILL OF QUANTITIES
Percentage Rate Tender (Up to INR 50 Cr.)
Item DescriptionofItem Quantity Unit Rate Amount
No (withbriefSpecificationandreference to Infigures
bookofspecifications)
------------------- As per Separate sheet attached -----------------
I/Weam/arewillingtocarryout theworkat…………………. % above/belowpercent(ShouldBewritten
in figures and words) oftheestimated rate mentionedaboveAmount ofmy/ourtender works out as
Estimatedamountput to tender Estimatedamountput to tender
Deduct………% below Add………% Above
In words Inwords
(B) ForItem Rate Tender(For above INR 50 Cr.):
ItemNo DescriptionofItem(withbrief Quantity Unit Rate Amount
specification andreference
to book ofspecifications) Infigure InWords
(A) Total Tendered Amount
(B) Rebateon abovetenderedamount (ifany)% (in figure)
(C) Net TenderedAmount (A-B) (in figure) ……………………………………………………
1 The Contractor shall exhibition board with detailed specification and details of work as
directed by the Engineer – In – Charge for which no extra payment shall bemade.
2 The labourcesswill be deducted as per prevailing rules i.e. 1% of the work done.
3 GST and Income tax TDS will be deducted at a source while making payments of bills.
4 In all R.C.C. Items in Rate Analysis Standard Cement Consumption has been taken as per
Govt G.R.: PRC-10/2017 CementConsumption/16/C Date: 11/05/2017 asstated inS.O.R.
therefore in R.C.C. items where the reisa change as per actual mix design the cost of difference
of cement consumption have been deducted from the rate of original item at the rate of input
rate mentioned in all the tender.
Sign.of the Contractor Sign. Of the Executive Engineer
Sign.of the Contractor Sign. Of the Executive Engineer
SECURITIESAND OTHER FORMS
Sign.of the Contractor Sign. Of the Executive Engineer
BID SECURITY(BANKGUARANTEE)
WHEREAS, ---------------------------------------- (nameof Bidder)(hereinafter called
the “TheBidder”) hassubmitted his bid Dated ------------------------ (Date) for the construction of--
----------- (NameofContractorhereinaftercalled“theBid”)
KNOW ALLPEOPLE bythese presents that We-----------------------------------------
-------- (nameofBank)of--------------------------------------------- (nameofcountry)havingour
Registered officeat------------------------------------------------------- (hereinafter
called “thebank”)arebound unto-------------------------------------------- (nameofEmployer)
(hereinafter called “TheEmployer”)inthesumof-----------------------------------------*
forwhichpaymentwellandtrulytobemadeto thesaidEmployertheBankitself,his successors
andassigns bythese presents.
SEALED with theCommon Seal ofthesaidBankthis ----------------------dayof------
THECONDITIONSof these obligations are:
(1) IfafterBidopeningtheBidderwithdraws his bid during the period of Bid validity
specifiedin the Form ofBid;
(2) IftheBidderhasbeennotifiedoftheacceptanceofhisbidbytheEmployerduringthe
periodofBidValidity:
A FailsorrefusestoexecutetheFormofAgreementinaccordancewiththeInstructions to
Bidders,if required;
B. FailsorrefusetofurnishthePerformanceSecurity,inaccordancewiththe
Instructions to Bidders;
C. does not accept the correction of the Bid Price pursuant to Clause 27 (Correction
Weundertaketo pay totheEmployeruptotheaboveamountupon receiptof
hisfirstwritten demand,withouttheemployer having to substantiate his demand,
provided that in his demand the Employer will note that the
amountclaimedbyhimisduetohimowingtotheoccurrenceofoneoranyof
thethreeconditions,specifyingtheoccurredconditions orconditions.
Sign.of the Contractor Sign. Of the Executive Engineer
ThisGuaranteewillremaininforceuptoand includingthedate-------------------**
daysafterthedeadlineforsubmissionof Birds Such The Deadline statedinthe
InstructionstoBiddersor as it maybeextended by theEmployer,noticeofwhich
extension(s) totheBankisherebywaived.Anydemand in respect of thisguarantee should
reachtheBanknot laterthan theabovedate
(Signature,nameandaddress)
TheBiddershould inserttheamountoftheguaranteeinwordsand figures
denominatedinIndian Rupees.Thisfigureshould bethesameas shownin
Clause16.1(BidSecurity) oftheInstructions to Bidders.
** 45 daysafter the end of the validity period of the Bid. Date should
beinsertedbythe EmployerbeforetheBiddingdocuments areissued.
Sign.of the Contractor Sign. Of the Executive Engineer
PERFORMANCESECURITY
contractor) (hereaftercalled “theContractor”) hasundertaken,in pursuanceof ContractsNo. ---
(nameofContractandbriefdescriptionofWorks)(hereinaftercalled“The
ANDWHEREASithasbeenstipulated byyouinthesaid Contractthatthe Contractorshallfurnish
youwitha BankGuarantee bya recognizedbank forthesum
specifiedthereinassecurityforcompliancewithhisobligationinaccordancewith theContract.
AND WHEREASwehaveagreedto givetheContractors such a bankGuarantee:
NOWTHEREFOREwehereby affirm that we are the Guarantor and responsible
toyouonbehalfoftheContractor, uptoatotalof------------------------------------------ (amountof
guarantee)*----------------------------(inwords),suchsum being payablein typesand proportion
of currencies in which the Contract price is payable,and we undertake to pay you, upon
your first written demand and without cavil or argument,any sumor sumswithinthelimitsof
---------------------------------------- (amount of guarantee) as aforesaid without your needing
to prove or to show grounds or reasons foryourdemand forthesum specifiedtherein.
Weherebywaive the necessity of yourdemandingthesaid debt fromthecontractor before
presentingis with thedemand.
Wefurtheragreethatnochangeoradditionto orothermodificationofthetermsof theContracttoof
theWorksto beperformed thereunder or of anyof theContract
documentswhichmaybemadebetweenyourand theContractorshallinany way
releaseusfromany liability underthisguarantee,and weherebywaivenoticeofany such
charge,addition ormodifications.
Thisguaranteeshallbevaliduntil60daysfromthedateofexpiringoftheDefect Liabilities period.
SignatureandSeal oftheguarantor------------------------------
*AnamountshallbeinsertedbytheGuarantor,representingthepercentagethe
Contract pricespecifiedin theContract denominatedin Indian Rupees.
Sign.of the Contractor Sign. Of the Executive Engineer
ADDITIONAL PERFORMANCESECURITY
[Clause34.1. (A)]
WHEREAS---------------------------------------------------- (Nameand addressof contractor)
(hereafter called“The Contractor”)hasundertaken, in pursuance of ContractsNo. --------------
(NameofContractandbriefdescriptionofWorks)(hereinaftercalled“TheContract”)
ANDWHEREASithasbeenstipulated byyouinthesaid
ContractthattheContractorshallfurnish youwitha BankGuarantee bya recognizedbank
forthesumspecifiedthereinassecurityforcompliancewithhisobligationinaccordancewith
AND WHEREASwehaveagreedto givetheContractors such a bankGuarantee:
NOWTHEREFOREwehereby affirm that we are the Guarantor and responsible toyou on
behalf of the Contractor, up to total of ------------------------------------------
(amountofguarantee)---------------------------- (inwords),such sum being payablein typesand
proportionsofcurrenciesinwhichtheContractpricesispayable,and we undertake to pay you,
upon your first written demand and without cavil or argument,any sumor
sumswithinthelimitsof ---------------------------------------- (amount of guarantee) as aforesaid
without your needing to prove or to show grounds or reasons foryourdemand forthesum
specifiedtherein.
Weherebywaive the necessity of yourdemandingthesaid debt fromthecontractorbefore
presentingis with thedemandWefurther agree that no change or addition to
orothermodificationofthetermsof theContracttoof theWorkstobe performed thereunder or of
anyof theContract documentswhichmaybemadebetweenyourand theContractorshallinany
way release us from any liability underthisguarantee,and i hereby waive notice of any such
charge,addition ormodifications.
This guarantee shall bevalid until 28days from the project completion date.
SignatureandSeal oftheguarantor-----------------------------
Sign.of the Contractor Sign. Of the Executive Engineer
BANK GUARANTEEFOR ADVANCEPAYMENT
InaccordancewiththeprovisionsoftheConditionsofContract,sub-
clause51.1(“AdvancePayment”)oftheabovementionedContract,-----------------------------------
--------(name and addressofContractor)(hereinaftercalled“the Contractor”) shall depositwith
bankguaranteehisproperandfaithfulperformanceunderthesaid
ClauseoftheContractinanamountof-------------------------------(amountofGuarantee)*-----------
We,the---------------------------------(bankoffinancialinstitution),asinstructed by
theContractor, agree unconditionally and irrevocably toguaranteeas primary obligatorand
notas Surety merely,thepaymentto---------------------------------------- (nameof
Employer)onhisfirstdemand withoutwhatsoever right ofobligationon
ourpartandwithouthisfirstclaimtotheContractor,intheamountnotexceeding----------------------
Wefurther agreethatnochangeor additiontoor other modificationsof thetermsof
theContractor or Worksto be performed there under or of any oftheContract
documentswhichmay bemadebetween--------------------------------- (nameof
Employer)andtheContractor,shallinanywayrelease fromanyliabilityunder thisguarantee,and
weherebywaivenoticeofanysuchchange,additionor modifications.
This guarantee shall remain valid and in full effect from the date of the advance
paymentunder theContractuntil -------------------------------------- (nameof employer)
receives fullrepayment ofthesameamount from thecontractor.
SignatureandSeal
NameofBank/ Financial InstitutionAddress___________________
*An amount shall beinsertedbythat BankorFinancial Institution representingthe amount
oftheAdvancePayment,and denominatedin Indian Rupees.
Sign.of the Contractor Sign. Of the Executive Engineer
Letter ofAcceptance
(Letterheadpaperofthe Employer)
(Nameandaddress oftheContractor)
This is to notify you that your Bid datedfor execution of the(Name of the
contract and identification number, as given in the Instructions to Bidders) for the Contract
Price of Rupees.()(amount in words and figures) as corrected and modified in accordance
with the Instructions to Bidders* isherebyacceptedbyouragency.
You are requested to furnish performance security, in the form detailed in
para34.1 of ITB for an amount equivalent to Rs. Within 10 days of the receipt of this letter
of acceptance up to beyond 60 days from the date of expiry of defects Liability period i.e.
up to and the Additional Performance Security foran amount equivalent to Rs.Shall be valid
beyond 28 (twenty-eight) days of Project Completion Date i.e. up to and sign the contract,
failing which action as stated in Para 34.3 of ITB will betaken.
Yours Faithfully
AuthorizedSignature
NameandtitleofSignatory
Delete“Corrected and”orandmodifiedifonly oneofthe sections applies.Deleteas corrected
andmodifiedinaccordancewiththeInstructionstoBidders,if correctionsor modifications
havenot beenaffected.
Sign.of the Contractor Sign. Of the Executive Engineer
Issue ofNotice to proceedwith the work
(Letterheadofthe Employer)
(Nameandaddress oftheContractor)
Pursuant to your furnishing the requisite security in ITB Clause 34.1 and signing
of the Contract for the construction of at abid Price of Rs..
Youareherebyinstructedto precede with theexecution ofthesaidworks in
accordancewith thecontract documents.
Yours faithfully
(Signature,nameandtitleofsignatoryauthorized
To sign on behalfofEmployer)
Sign.of the Contractor Sign. Of the Executive Engineer
This agreement, made on theday ofbetween. (Name and address of Employer)
(Here in after called “the Employer) and.(Name and address of contractor) here in after
called “the Contractor” of the other part.
Where as the Employer is desirous that the Contractor execute.Name and
identification number of contract (here in after called “the works”) and the employer has
accepted the Bid by the Contractor for the execution and completion of such works and
there medying of any defects there in, at a cost of Rs..
NOW THIS AGREEMENT WITNESSETH AS FOLLOWS
1. InthisAgreement,wordsandexpressionshallhavethesamemeaningsasare
respectivelyassignedto them in theconditions ofcontract hereinafter referredto and they
shall be deemed to form and be read construed as part of this Agreement.
2. InConsiderationof thepaymenttobemade by the Employer tothecontractor as
hereinaftermentioned,theContractorhereby covenantswith theEmployerto executiveand
completetheworksandremedyany defectsthereininconformity in all aspects with
theprovisions ofthecontracts.
3. TheemployerherebycovenantstopaytheContractorinconsiderationofthe executionand
completionof theworksand theremedying thedefectswherein contractpriceor suchother
sumasmaybecomepayableunder theprovisionsof theContract at thetimes andin the
manner prescribed by the contract.
4. The Following documents shall bedeemedto form andbereadyandconstruedas part
ofthis Agreement viz
i) letterof Acceptance
ii) Noticeto proceed with theworks:
iii) Contractor’s Bid
iv) Conditions ofcontract:General andSpecial
Sign.of the Contractor Sign. Of the Executive Engineer
v) Contract Data
vi) Additional conditions
viii) Bill of Quantities and
ix) Anyother documents listedin theContract data as formingpart oftheContract.
Inwitnesswhereoftheparties hereto have caused this Agreement to be
executedthedayand year first beforewritten
TheCommon seal of was hereunto
affixin the presenceof:
Signed,sealedandDeliveredbythesaid
In the presenceof.
BindingsignatureofEmployer
BindingSignatureof Contractor
Sign.of the Contractor Sign. Of the Executive Engineer
(For Investment)
I, the undersigned do hereby undertake that our firm M/s ……………………
…………..wouldinvestaminimumcashup to 25%ofthe
valueoftheworkduringimplementation ofthecontract.
(Signedbyan Authorizedofficerofthefirm)
Sign.of the Contractor Sign. Of the Executive Engineer
I,theundersigneddoherebyundertakethatourfirmM/s…………………………
………..………………………………..agreetoabideby this bid
foraperiod.................................daysfordatefixedforreceivingthesameanditshallbebinding
onusandmaybeacceptedat anytime beforetheexpiration ofthat period.
(Signed by an Authorized officer of the firm)
Title oF Officer
Sign.of the Contractor Sign. Of the Executive Engineer
Sign.of the Contractor Sign. Of the Executive Engineer
DOCUMENTS TO BE FURNISHED BY BIDDER
Sign.of the Contractor Sign. Of the Executive Engineer
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
GRs.pdf
Electric Specification.pdf
ITEM WISE SPECIFICATIONS FOR CIVIL WORK.pdf
SBD ANGIYA P SCHOOL TOILET.pdf
SCH-B.pdf
SCHEDULE FOR TESTING OF MATERIALS.pdf
Speci Index.pdf
SPECIFICATIONS.pdf
Testing.pdf
Work List.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .