Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹79.8 LAdmitted-Finance 31 NEELGIRI IND ESTATE T J ROAD SEWRI W MUMBAI MAHARASHTRA 400015 | MUMBAI | MAHARASHTRA | 400015 | L1 | Admitted-Finance | |
| 2 | L2₹1.1 Cr+₹29.7 L (37.2%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹1.4 Cr+₹59.7 L (74.8%)Admitted-Finance PLOT NO 4B SURVEY NO 237 3P INDUSTRIAL PARK VAKALAPUDI KAKINADA EAST GODAVARI ANDHRA PRADESH 533005 | KAKINADA | ANDHRA PRADESH | 533005 | L3 | Admitted-Finance | |
| 4 | L4₹1.9 Cr+₹1.1 Cr (143.8%)Admitted-Finance | L4 | Admitted-Finance |
| Sl No | Description | Qty | Unit | JAMI HYDRAULIC L2 | KALATHIL BROTHERS CONSTRUCTION CO. PVT. LTD. L4 | YEOMAN MARINE SERVICES PVT. LTD. L1 | SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD L3 |
|---|---|---|---|---|---|---|---|
| 1.00BOP (BLOW OUT PREVENTER) MAKE- SHAFFER (NOV), LOCATION - MOON POOL AREA: Entire Bop (Blow out Preventer)unit (160 Tons) is to be lifted and placed on its stowing position -QTY 01 NO | |||||||
| 2.00Scope of work: Lifting and Positioning of BOP is to be carriedout as per the following scope of work to the satisfaction of SS & HSL. (Due to Cyclone, BOP unit on Vessel has tilted to its original position on Stbd side. The same is to be positioned to the satisfaction of Rig Staff & HSL.) | |||||||
| 3.00 | Bop unit parts to be properly Secured and locked (by welding and wire ropes with bottle screws) | 1 | LS | 3,75,000 ₹3,75,000 | 2,50,000 ₹2,50,000 Lowest | 5,47,509 ₹5,47,509 | 15,00,000 ₹15,00,000 |
| 4.00 | Remove unwanted materials (Spider beam door, wire ropes, wooden planks, hoses etc.) on bop track and moon pool area.Remove Bop pod hoses,skidding unit pipelines,carrige cylinders,panels,All stack mounted bottles,Rest & Inclined walk and adjacant staircase,All existing External supports and secure properly.All obstacles materials like deck plate , railing, pipes foundations etc on main deck to facilitate the lifting of Bop, after completion of work same to be fitted back. | 1 | LS | 9,35,000 ₹9,35,000 | 7,50,000 ₹7,50,000 | 6,42,730 ₹6,42,730 Lowest | 28,00,000 ₹28,00,000 |
| 5.00 | Remove all four old 55-tons shackles on Bop upper weldment. Carry out NDT and load test of all four eye pads on Bop upper Weldment. If found damage, weld and test as per specification. Fit four new shackels of thread and bolt type of minimum 55-tons capacity(contractor supply). | 1 | LS | 4,65,000 ₹4,65,000 | 4,50,000 ₹4,50,000 | 8,33,170 ₹8,33,170 | 3,50,000 ₹3,50,000 Lowest |
| 6.00 | Remove and shift the BOP carriage and installed on track (centre space between LMRP and BOP stowage position) and locked by welding.After completion work carriage to be shifted to bop stowage position.Place Main Bop assembely plate on the carriage and required number of small BOP plates (total 7cm thick) on its centre.Rest the BOP stack on BOP carrige and Proper aligniment to be done and Locked all corners with structural supports and welded.After completion of work supports to be removed. Weld steel angle supports/pipes between BOP upper and Lower beside BOP guide posts. | 1 | LS | 14,75,000 ₹14,75,000 | 13,00,000 ₹13,00,000 | 6,23,686 ₹6,23,686 Lowest | 17,00,000 ₹17,00,000 |
| 7.00 | Lift up and shift the BOP via crane with certifieed wire ropes and bow shackles through eye pads (55 tons eye pads - 04 Nos). Lift the BOP stock about 2 mtrs height and lowered on BOP stowage position of carrige. | 1 | LS | 22,00,000 ₹22,00,000 | 12,00,000 ₹12,00,000 | 10,95,022 ₹10,95,022 Lowest | 21,00,000 ₹21,00,000 |
| 8.00 | Required capacity crane ( Suiatble Heavy duty crane) should be arranged by Contractor for Lifting,shifting and securing of BOP stock on carriage. All required tools and tackles like shackles,lifting ropes with test certificates are covered in contractor scope. | 1 | LS | 55,00,000 ₹55,00,000 | 1,55,00,000 ₹1,55,00,000 | 42,37,260 ₹42,37,260 Lowest | 55,00,000 ₹55,00,000 |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
15 Jun 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Lifting and Positioning of BOP on MODU SAGAR BHUSHAN
2022_HSL_90171_1
20 / 22005 / BOP / 042 / 2022-23
Open Tender
Miscellaneous Services
Service
15 days
HSL Visakhapatnam
Please refer Tender documents.
8 documents required · 8 mandatory
₹1,050
Yes
HSL
₹1 L
Yes
18 Jun 2022
1 Jun 2022
15 Jun 2022
1 Jun 2022
15 Jun 2022
1 Jun 2022
120 days
Amount
BOP (BLOW OUT PREVENTER) MAKE- SHAFFER (NOV), LOCATION - MOON POOL AREA: Entire Bop (Blow out Preventer)unit (160 Tons) is to be lifted and placed on its stowing position -QTY 01 NO
Scope of work: Lifting and Positioning of BOP is to be carriedout as per the following scope of work to the satisfaction of SS & HSL. (Due to Cyclone, BOP unit on Vessel has tilted to its original position on Stbd side. The same is to be positioned to the satisfaction of Rig Staff & HSL.)
Bop unit parts to be properly Secured and locked (by welding and wire ropes with bottle screws)
Remove unwanted materials (Spider beam door, wire ropes, wooden planks, hoses etc.) on bop track and moon pool area.Remove Bop pod hoses,skidding unit pipelines,carrige cylinders,panels,All stack mounted bottles,Rest & Inclined walk and adjacant staircase,All existing External supports and secure properly.All obstacles materials like deck plate , railing, pipes foundations etc on main deck to facilitate the lifting of Bop, after completion of work same to be fitted back.
Remove all four old 55-tons shackles on Bop upper weldment. Carry out NDT and load test of all four eye pads on Bop upper Weldment. If found damage, weld and test as per specification. Fit four new shackels of thread and bolt type of minimum 55-tons capacity(contractor supply).
Remove and shift the BOP carriage and installed on track (centre space between LMRP and BOP stowage position) and locked by welding.After completion work carriage to be shifted to bop stowage position.Place Main Bop assembely plate on the carriage and required number of small BOP plates (total 7cm thick) on its centre.Rest the BOP stack on BOP carrige and Proper aligniment to be done and Locked all corners with structural supports and welded.After completion of work supports to be removed. Weld steel angle supports/pipes between BOP upper and Lower beside BOP guide posts.
Lift up and shift the BOP via crane with certifieed wire ropes and bow shackles through eye pads (55 tons eye pads - 04 Nos). Lift the BOP stock about 2 mtrs height and lowered on BOP stowage position of carrige.
Required capacity crane ( Suiatble Heavy duty crane) should be arranged by Contractor for Lifting,shifting and securing of BOP stock on carriage. All required tools and tackles like shackles,lifting ropes with test certificates are covered in contractor scope.
JAMI HYDRAULIC
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
KALATHIL BROTHERS CONSTRUCTION CO. PVT. LTD.
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .