Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 108 3 CHANDAR NAGAR DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Finance |
| 2 | Admitted-Finance 62 NOIDA UTTAR PRADESH | SANT KABEER NAGAR | UTTAR PRADESH | 272125 | Admitted-Finance |
| 3 | Admitted-Finance 58 NEW MARKET CLOCK TOWER DEHRADUN | DEHRADUN | UTTARAKHAND | 248001 | Admitted-Finance |
Tender Value
Refer Docs
EMD Value
₹1 L
Closing Date
21 Mar 2020, 5:00 pmClosed
Executive Engineer
Executive Engineer, Central Store, Uttarakhand Jal Sansthan, Jal Bhawan, B Block, Nehru Colony, Dehradun
SITC of Three Phase Digital Rolling Contact Servo Voltage Stabilizers Suitable For Unbalance Voltage and Unbalance Load at different sites in Uttarakhand State on Turnkey Basis including 5 years cost free maintenance
2020_UKJS_23009_8
1113/E-Tendering/2019-20 dated 27.02.2020
Open Tender
Supply of Materials
365 days
Uttarakhand State
As per TD
3 documents required · 3 mandatory
₹1,180
Executive Engineer, Central Store, UJS
₹1 L
Dehradun
2 Jul 2020
3 Mar 2020
23 Mar 2020
3 Mar 2020
21 Mar 2020
3 Mar 2020
7 Mar 2020
Supply, Installation, Testing and Commissioning of Three Phase Digital Rolling Contact Servo Voltage Stabilizers Suitable for Unbalance Voltage & Unbalance Load including fixing of proper size copper lugs on input and output cables on both ends at Different Sites on Turnkey Basis including 5 years cost free maintenance.
Input voltage 330-460 volts (phase to phase) 1. Capacity- 25 kva
2. Capacity- 40 kva
3. Capacity- 50 kva
4. Capacity- 60 kva
5. Capacity- 80 kva
6. Capacity- 100 kva
7. Capacity- 125 kva
8. Capacity- 150 kva
9. Capacity- 180 kva
10. Capacity- 200 kva
11. Capacity- 225 kva
Input voltage 280-460 volts (phase to phase) 1. Capacity- 25 kva
2. Capacity- 40 kva
3. Capacity- 50 kva
4. Capacity- 60 kva
5. Capacity- 80 kva
6. Capacity- 100 kva
7. Capacity- 125 kva
8. Capacity- 150 kva
9. Capacity- 180 kva
10. Capacity- 200 kva
11. Capacity- 225 kva
Supply, installation, testing and commissioning of ISI Marked 4 core copper flexible cable as per IS: 694:1990 revised as IS: 694:2010 with latest amendments for proper completion of work including 5 years cost free maintenance.
SEROVKON SYSTEMS LTD
Supra Electrical
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid