Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 LAdmitted-Finance | ₹35.0 L | L1 | Admitted-Finance |
| 2 | L2₹36.5 L+₹1.5 L (4.16%)Admitted-Finance VILLAGE DIKHOLGAON CHAMBA TEHRI GARHWAL | CHAMBA | HIMACHAL PRADESH | 176207 | ₹36.5 L+₹1.5 L (4.16%) | L2 | Admitted-Finance |
| 3 | L3₹37.0 L+₹2.0 L (5.82%)Admitted-Finance NAINBAG | DEHRADUN | UTTARAKHAND | 248001 | ₹37.0 L+₹2.0 L (5.82%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | MS SHYAM SINGH L3 | M/S OM ELECTRICALS CONSTRUCTION L1 | MS POWER DESIGN L2 |
|---|---|---|---|---|---|---|
| 1.00Electrical Items : | ||||||
| 2.00 | STAY CLAMP FOR SP-23 WITH NUT &
BOLT | 368 | NOS | 1,12,240 ₹1,12,240 | 91,632 ₹91,632 Lowest | 1,04,880 ₹1,04,880 |
| 3.00 | EARTH WIRE CLAMP FOR SP-23 WITH
N/B | 124 | NOS | 37,820 ₹37,820 | 30,752 ₹30,752 Lowest | 35,340 ₹35,340 |
| 4.00 | PP & CLAMP WITH N&B ST POLE SP-23 | 252 | NOS | 1,07,100 ₹1,07,100 | 1,00,296 ₹1,00,296 Lowest | 1,09,620 ₹1,09,620 |
| 5.00 | BRACING CLAMP TOP FOR SP-23 WITH
N/B | 184 | NOS | 67,160 ₹67,160 | 64,032 ₹64,032 Lowest | 73,232 ₹73,232 |
| 6.00 | BRACING CLAMP BOTTOM FOR SP-23
WITH N/B | 184 | NOS | 76,360 ₹76,360 | 73,232 ₹73,232 Lowest | 78,568 ₹78,568 |
| 7.00 | 11 KV H.S Kit 3x70 MM (Indoor Type) | 15 | NOS | 66,420 ₹66,420 | 66,000 ₹66,000 Lowest | 66,510 ₹66,510 |
| 8.00 | 1 1 KV H.S Kit 3x70 MM (Outdoor Type) | 15 | NOS | 73,650 ₹73,650 | 73,080 ₹73,080 Lowest | 73,650 ₹73,650 |
| 9.00SERVICES (LABOUR) | ||||||
| 10.00 | ERECTION OF EARTHING ROD | 92 | NOS | 67,344 ₹67,344 | 66,424 ₹66,424 Lowest | 68,264 ₹68,264 |
Tender Value
Refer Docs
EMD Value
₹75,000
Closing Date
14 Jul 2025, 2:00 pmClosed
SE
EDC TEHRI
Construction of 11 KV line to provide connectivity to the proposed Solar Energy in various feeders under MSSY in 33/11 KV S/s Rajakhet under EDD Tehri
2025_UPCL4_85177_1
06/EDCT/2025-26
Open Tender
Miscellaneous Services
Item Wise
90 days
Rajakhet
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,360
Yes
EE TEST
₹75,000
Yes
4 Sept 2025
27 Jun 2025
15 Jul 2025
27 Jun 2025
14 Jul 2025
27 Jun 2025
Electrical Items :
STAY CLAMP FOR SP-23 WITH NUT & BOLT
EARTH WIRE CLAMP FOR SP-23 WITH N/B
PP & CLAMP WITH N&B ST POLE SP-23
BRACING CLAMP TOP FOR SP-23 WITH N/B
BRACING CLAMP BOTTOM FOR SP-23 WITH N/B
11 KV H.S Kit 3x70 MM (Indoor Type)
1 1 KV H.S Kit 3x70 MM (Outdoor Type)
SERVICES (LABOUR)
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
FIXING OF FUSE SET
LAYING OF WEASEL CONDUCTOR IN HT LINE
LOPPING & CHOPPING OF TREE BRANCHES
T-OFF CONNECTION COMPLETE 11 KV LINE
FIXING OF 11 KV XLPE JOINTING KIT
CARTAGE SP-21/23 POLE, 150-200KM
CARTAGE OF PETTY MATERIAL,150-200KM
HEADLOAD CARTAGE SP-21/23 POLE(0-1 KM)
HEADLOAD CARTAGE OF MATERIAL(0-1 KM)
Laying of 11KV Cable in Trench all work
MS POWER DESIGN (BID ID -390093)
MS SHYAM SINGH (BID ID -390100)
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .