Loading…
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical Technically Unsuitable |
| 4 | Rejected-Technical | Rejected-Technical Technically Unsuitable |
Tender Value
Refer Docs
Closing Date
30 May 2025, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-OS
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Battery Charger Rectifier and UPS Servicing works ON INS JAMUNA
2025_HSL_97205_3
20 / 22040 / 059 / Rectifier and UPS/ 2025-26
Open Limited
Miscellaneous Services
Service
45 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
20 Jun 2025
28 May 2025
30 May 2025
28 May 2025
30 May 2025
28 May 2025
Amount
VESSEL : INS JAMUNA WO.NO:22040 DL NOS : : 20288,89,90,30058,59,26.. ROUTINES ON WASHING MACHINE, DRIER AND DRIER TUMBLER
5 KVA UPS OF WT EQUIPMENT: SUB-OPTIMAL PERFORMANCE OBSERVED IN 5 KVA UPS OF WT EQUIPMENT BACK UP OF 15 MINUTES OBSERVED AS AGAINST MINIMUM OF 30 MINUTES. FOLLOWING ARE REQUIRED:- (A) SERVICEABILITY CHECKS OF UPS. (B) REPLACEMENT OF OLD BATTERIES (QTY - 09 NOS., 12V 65 AH). (C) SERVICEABILITY CHECKS POST FITMENT OF NEW SMF BATTERIES.
3 KVA UPS: SUB-OPTIMAL PERFORMANCE OBSERVED IN 3 KVA UPS. BACK UP OF 15 MINUTES OBSERVED AS AGAINST MINIMUM OF 30 MINUTES. FOLLOWING ARE REQUIRED:- (A) SERVICEABILITY CHECKS OF UPS. (B) REPLACEMENT OF OLD BATTERIES (QTY - 6Nos for EACH UPS x 5 NOS = 30 Nos., 12V 65 AH). (C) SERVICEABILITY CHECKS POST FITMENT OF NEW SMF BATTERIES.
3 KW BATTERY, 24V CHARGER - 1, M/S RADIANT ELECTRONICS: FLUCTUATIONS IN OUTPUT VOLTAGE.IS OBSERVED. OVERHAULING OF 12V, 3KW BATTERY CHARGER IS REQUIRED. VARIOUS ITEMS OF TRANSRECTIFIER ARE MALFUNCTIONING. REPLACEMENT OF BELOW MENTIONED ITEMS IS REQUIRED: - (A) 10 AMP, 3 POLE ON/OFF SWITCH (QTY-1) (B) INDICATING LAMP WITH COVER (QTY-1) (C) LAMP 220 V (QTY-3) (D) FUSE LINK- 6A (QTY-3) (E) FUSE LINK-2A (QTY-3) (F) FUSE LINK-125A (QTY-1) (G) FUSE BASE-250A (QTY-1) (H) FUSE BASE-15A (QTY-1) (J) 10A, 3POLE, 4 WAY VOLTAGE CONTROL SWITCH (QTY-1) (K) SURGE SUPPRESSOR CAPACITOR (QTY-1) (L) SET OF COILS (3NOS) FOR TRANSFORMER (QTY-1) (M) DIODE (QTY-2)
3 KW BATTERY, 24V CHARGER - 2, M/S RADIANT ELECTRONICS: FLUCTUATIONS IN OUTPUT VOLTAGE.IS OBSERVED. OVERHAULING OF 24V, 3KW BATTERY CHARGER IS REQUIRED. VARIOUS ITEMS OF TRANSRECTIFIER ARE MALFUNCTIONING. REPLACEMENT OF BELOW MENTIONED ITEMS IS REQUIRED: - (A) 10 AMP, 3 POLE ON/OFF SWITCH (QTY-1) (B) INDICATING LAMP WITH COVER (QTY-1) (C) LAMP 220 V (QTY-3) (D) DIODE (QTY-2) (E) FUSE BASE-250A (QTY-1) (F) FUSE BASE-400A (QTY-1) (G) 10A, 3POLE, 4 WAY VOLTAGE CONTROL SWITCH (QTY-1) (H) SURGE SUPPRESSOR CAPACITOR (QTY-1) (K) SET OF COILS (3NOS) FOR TRANSFORMER (QTY-1)
4 KW BATTERY, 12V CHARGER, M/S RADIANT ELECTRONIC: VARIOUS ITEMS OF TRANSRECTIFIER ARE MALFUNCTIONING. REPLACEMENT OF BELOW MENTIONED ITEMS IS REQUIRED: - (A) 6 AMP, 3 POLE ON/OFF SWITCH (QTY-1) (B) INDICATING LAMP WITH COVER (QTY-1) (C) LAMP 220 V (QTY-3) (D) FUSE LINK- 2A (QTY-3) (E) FUSE LINK-50A (QTY-3) (F) FUSE BASE-63A (QTY-1) (G) FUSE BASE-15A (QTY-1) (H) 6A, 3POLE, 4 WAY VOLTAGE CONTROL SWITCH (QTY-1) (J) SURGE SUPPRESSOR CAPACITOR (QTY-1) (K) SET OF COILS (3NOS) FOR TRANSFORMER (QTY-1) (L) DIODE (QTY-2)
3KW TRANS-RECTIFERS, M/s RADIANT ELECTRONIC TRANSFORMER RECTIFIER: Input Voltage: 415 V, 3 Phase, 50 Hz. Output Voltage: 12/24 V DC FREQUENT VOLTAGE DROPS OBSERVED. OVERHAULING OF THE RECTIFIER IS REQUIRED. WORK INCLUDES REMOVAL OF THE RECTIFIER AND REWINDING. FITMENT OF THE RECTIFIER POST REWINDING AND TRIALS.
1KW TRANS-RECTIFERS, M/s RADIANT ELECTRONIC TRANSFORMER RECTIFIER: FLUCTUATIONS IN OUTPUT VOLTAGE.IS OBSERVED. OVERHAULING OF 24V, 1KW BATTERY CHARGER IS REQUIRED.
CABLE FROM RECTIFIER TO CHARGING TERMINALS INSIDE BCR COMPARTMENT IS PERISHED. RECABLING FROM RECTIFIER TO CHARGING TERMINALS IS REQUIRED FROM 03 RECTIFIERS TO 06 BATTERY CHARGING TERMINALS. WORK INVOLVES GLAND PIERCING, LAYING OF CABLE AND GLAND PACKING. (CABLE LENGTH - 100 MTRs, CABLE TYPE - 02 CORE 04 SQMM).
BATTERY CHARGER, M/S ELAK(PORTABLE) : 24V,1 KW PORTABLE BATTERY CHARGING RECTIFIER IS NOT WORKING. REPAIR/ REPLACEMENT OF 24V, 1 KW PORTABLE BATTERY CHARGING RECTIFIER IS REQUIRED.
POSITIVE CONTROLS (BID ID -417141)
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Restricted Tender
This is a Open Limited tender. Documents are accessible only to bidders authorized by the issuing authority on the government portal.
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .