Tender ID
Tender Value
₹5.7 Cr
EMD Value
₹5.7 L
Closing Date
27 Mar 2026, 6:00 pmClosed
Executive Engineer, R&B Division, Bhuj
Strengthening to Satapar Ajapar Modvadar Mithi Rohar Road Ch.0/00 To 18/00 (Ch. Km 0/0 to 9/300)Ta:Anjar Dist:Kutch
285789
99 For 2025-26
Open
Civil Works - Roads
Works
Kutch
15 documents required · 15 mandatory
₹12,000
Executive Engineer, R and B Division, Bhuj
₹5.7 L
12 Mar 2026
12 Mar 2026
12 Mar 2026
27 Mar 2026
12 Mar 2026
Name of work :-
Strengthening to Satapar Ajapar Modvadar Mithi Rohar Road
Ch.0/00 To 18/00 (Ch. Km 0/0 to 9/300)Ta:Anjar Dist:Kutch
Bill of Quantity
Memorandum showing items of works to be carried out.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
No. Estimated In Figures In Words
but may be estimated Quantities
1 745.00 Dismentaling the existing structure 930.35 Rupees Nine Cum
including removing and stacking Hundred Thirty
the dismentelled materials as and And Paise
where directed. (A)R.C.C. Work. Thirty Five Only
(sor 2024-25 it no 27001A pg no
2 5.31 Clearing and grubbing road land 28455.37 Rupees Twenty Cum
including uprooting rank vegetation Eight
grass bushes, shrubs, sapling and Thousand Four
trees girth up to 300 mm removal Hundred Fifty
of stumps of trees cut earlier and Five And Paise
disposal of unserviceable materials Thirty Seven
(C) By mechanical means in area of Only
light jungle (SOR 2024-25 No
3 2200.00 Scarifying existing bituminous 6.16 Rupees Six Smt
surface to a depth of 50 mm by And Paise
mechnical means Hydraulic Sixteen Only
excavator (scarifying the existing
bituminous road surface to a depth
of 50mm and disposal of scarified
material with in all lifts and lead
upto 1000metres. (NH SOR No2023-
4 1413.00 Box cutting the road surface to 109.24 Rupees One Cum
proper slope and camber for Hundred Nine
making a base of road work And Paise
including removing the excavated Twenty Four
stuff and depositing on the road Only
side slope as directed upto50 mts,
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
5 565.00 Construction of Grannular sub 1110.88 Rupees One Cum
base of 150 mm thick in by Thousand One
providing GSB Gr - I coarse graded Hundred Ten
material using B.T Metal 26.5mm And Paise
to 53 mm @ 35 % ,26.5mm to Eighty Eight
4.75mm 45% & Below 2.36mm 20 Only
% in uniform layer with motor
grader on prepared surface mxing
by mix in place method with
vibratory roller to achive the
desired density complete as per
close 401. (As per RA)
6 706.00 Providing and laying, spreading and 883.14 Rupees Eight Cum
compacting 125mm thick graded Hundred
stone aggregate in two layers to Eighty Three
Wet Mix Macadam specification And Paise
including premixing the material Fourteen Only
with water at OMC in mechanical
mix plant carraige of mixed
material by tipper tp site, laying in
uniform layers with mechanical
means in sub-base /base course on
well prepared surface and
compacting with vibratory roller to
achieve the desired density. (As
7 1770.00 Providing 100mm thick compacted 484.23 Rupees Four Cum
side shoulder of quarry spall on Hundred
road site including collection of Eighty Four
material spreading, rolling of And Paise
watering etc. complete as directed. Twenty Three
(As per RA) Only
8 2825.00 Providing & applying evenly 43.77 Rupees Forty Smt
priming coat with bitumen Three And
Emulsion (SS1) on prepared Paise Seventy
surface of granular base including Seven Only
cleaning of road surface and
sparying primer at the rate of
7.50 Kg. / 10 Smt using using
mechanical means. (As per RA)
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
9 8846.00 Providing and laying 75.00 mm 2893.64 Rupees Two MT
thick compacted bitumenous Thousand
macadam (BM) using crushed Eight Hundred
stone aggregate as per MORT & H Ninety Three
gradation and Emulsion (RS-1) for And Paise Sixty
tack coat @ 2.5 kg/10smt. & VG-40 Four Only
grade bitumen at the rate of 3.40%
by weight of total mix (i.e. 34kg/mt
by wt. of total mix) for binding
including heating and mixing the
asphalt and aggregates in Drum
mix plant and transporting the mix
and spreading the same by Sensor
paver finisher and consolidation
with vibratory road roller including
using all necessary equipments,
tools, plants, including cost of all
materials, firewood, oil, lubricants,
labour charges etc. complete.(As
10 2723.00 Providing and laying 25 mm thick 3593.18 Rupees Three MT
compacted S.D.B.C with B.T. stone Thousand Five
chips as per MORT & H gradation Hundred
and asphalt VG - 40 for mixing at Ninety Three
the rate of 5.0 % by weight of total And Paise
mix i.e (50.00 kg/MT by weight of Eighteen Only
total mix) including heating the
asphalt and aggregates by
continuous DRUm mix plant &
spreading the same by paver
finisher including rolling &
consolidation with 10-12 tones
vibratory and power roller &
providing all materials,
equipments, tools & plants, fire
wood, oil, kerosene, labour charges
etc. and using contractor's own
machineries Batch mix plant and
paver finisher etc. complete.(As per
11 1821.00 Earthwork for embankment 177.91 Rupees One Cum
including breaking clods, dressing Hundred
with all lead and lift and including Seventy Seven
watering rolling and consolidation And Paise
of subgrade in layers at O.M.C. to Ninety One
required dry density including Only
filling the depression which occur
during the process using power
roller 8T to 10T.(E) From Borrow
area within 3.0KM. lead 26004EA p
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
12 1039.28 Excavation for foundation upto 1.5 122.94 Rupees One Cum
m depth including sorting out Hundred
and stacking of useful Twenty Two
materials and disposing off the And Paise
excavated stuff upto 50 Meter Ninety Four
lead.(A) Loose or soft soil [S.O.R. Only
13 867.00 Excavation for foundation for 170.69 Rupees One Cum
depth from 1.5 m to 3.0 m Hundred
including sorting out and Seventy And
stacking of useful materials and Paise Sixty
disposing off the excavated Nine Only
stuff upto 50 Meter lead.(B)
Dense or Hard soil [S.O.R. 2024-
14 1708.00 Providing and filling in foundation 3737.13 Rupees Three Cum
with cement concrete M 150 mix Thousand
and providing necessary vertical Seven Hundred
pin headers including formwork, Thirty Seven
vibrating, ramming and curing And Paise
complet. [S.O.R. 2024-25, It. No. Thirteen Only
15 30.00 Supplying and fixing reinforced 5560.01 Rupees Five Rmt
concrete heavy duty non-pressure Thousand Five
pipes with collars for culverts Hundred Sixty
carrying heavy traffic as per IS 458- And Paise One
1991 specifications including Only
setting the pipes in C.M. 1:2
watering and laying (to level or
slopes) of class NP3 of following
internal daimeters.(vii) 1200mm
dia. [S.O.R. 2024-25, It. No.
16 1.00 Numbering the C.D.work with 58.80 Rupees Fifty Each
approved paint including all Eight And
materials for paintings etc. Paise Eighty
complete. [S.O.R. 2024-25, It. No. Only
17 38085.00 Providing TMT Bar FE 500D 77.29 Rupees Kg
reinforcement for R.C.C. work Seventy Seven
including bending, binding and And Paise
placing in position complete upto Twenty Nine
floor two level. Only
18 735.00 Providing and laying weep hole 86.70 Rupees Eighty No
in abutment and returning by Six And Paise
using A.C. pipes of 100mm Seventy Only
diameter including laying in
proper grade and jointing etc.
complete as per detailed
specifications.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
19 48.05 Providing Yellow and Black Patta 128.62 Rupees One Smt
(two coat) including priming (one Hundred
coats) with oil bound enamel paint Twenty Eight
of approved brand and And Paise Sixty
manufacture and of required shade Two Only
on wall surfaces to give an even
shade of approved brand and
manufacture after thoroughly
brushing the surface free from
mortar dropping and other foreign
matter and also including
preparing the surface even and
sand papered smooth as per
instruction of Engineer Incharge.
20 162.00 Filling available excavated earth 130.39 Rupees One Cum
(excluding rock) in trenches. Hundred Thirty
plinth, sides of foundations etc. in And Paise
layers not exceeding 20 cm. in Thirty Nine
depth consolidating each disposited Only
layer by ramming and watering.
21 1031.00 Providing and laying in situ 5339.16 Rupees Five Cum
Controled Cement Concrete M250 Thousand
for road laid as directed including Three Hundred
tamping, vibrating, finishing, Thirty Nine
curing and filling in joints with And Paise
bitumen complete. (RA) Sixteen Only
22 466.00 Providing and fixing indicator stone 343.27 Rupees Three No
of approved stone as per I.R.C. type Hundred Forty
design in C. C. 1:4:8 including Three And
white washing etc. complete.(ii) Paise Twenty
Fixing in C.C. 1:5:10 (As Per S.O.R Seven Only
23 8.00 Providing and fixing ordinary 1293.39 Rupees One No
Kilometer stone of precast C.C. Thousand Two
1:2:4 including necessary Hundred
reinforcement as per I.R.C. type Ninety Three
design in C.C. 1:4:8 including letter And Paise
and paints etc. complete (For N.H., Thirty Nine
S.H. and M.D.R.) As Per S.O.R Only
I.Code : 26048, Sr No. : 89 Pg no.
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
24 1.00 Providing and fixing 5th Kilometer 1935.15 Rupees One No
stone of precast C.C. 1:2:4 Thousand Nine
including necessary reinforcement Hundred Thirty
as per I.R.C. type design in C.C. Five And Paise
1:4:8 including painting, lettering Fifteen Only
etc. complete (For N.H., S.H. and
M.D.R.) As per S.O.R. I.Code :
25 38.00 Providing and fixing Hectometer as 356.50 Rupees Three No
per I.R.C. type design including Hundred Fifty
painting, lettering etc. complete.(ii) Six And Paise
Fixing in C.C. 1:5:10 As Per S.O.R. Fifty Only
I.Code. 26044 B Sr No. : 83 Pg no.
26 258.00 Providing and fixing guard stone as 350.80 Rupees Three No
per I.R.C. type design including Hundred Fifty
white washing etc. complete.(ii) And Paise
Fixing in C.C. 1:5:10 ( SOR I .C. Eighty Only
27 2815.00 Road marking with hot applied 367.72 Rupees Three Smt
thermoplastic paints with Hundred Sixty
reflectorising glass beads on Seven And
bitumin surface providing and Paise Seventy
laying a hot applied thermoplastic Two Only
compound 2.5 mm thick including
reflectorising glass beads @
250gms per sqm area, thickness of
2.5mm is excluding of surface
applied glass beds as per IRC:35-
2015. The finished surface to be
level, uniform and free from streaks
and holes. zebra patta /bump patta
lane /center line/ edge line/cut
patta. The white color marking
should provide ,liminance
coefficinet on cemend road shalll
be min 130 mcd/m2/lux and
Asphalt road shall be min 100 mcd
/m2/lux during the service life
during the day time. The marking
should meet the performance
criteria for night time reflectivity,
wet reflectivity and skid resistance
as mentioned in the section-15 of
IRC 35-2015. Warranty for the
Retro reflectivity should be two
years. 26161 Page 220)
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
28 2056.00 Cat Eye / Road Stud / RPM: 326.23 Rupees Three No
Supplying of Molded Twin Shanks Hundred
Raised Pavement Markers made of Twenty Six And
polycarbonate and ABS moulded Paise Twenty
body and reflective panels with Three Only
micro prismatic lens capable of
providing total internal reflection of
the light entering the lens face and
shall support a load of 13635 kgs.
tested in accordance to ASTM D
4280 Type H and complying to
Specifications of Category A of
MORTH Circular No
RW/NH/33023/10-97 DO III Dt
11.06. 1997. The height, width and
length shall not exceed 20 mm,
mm and 130 mm and with
minimum reflective area of
Sqcm on each side and the slope to
the base shall be 35 +/- 5 degree.
The strength of detachment of the
integrated cylindrical shanks, (of
diameter not less than 19 +/-
mm and height not less than 30+/-
2 mm) from the body, is to be a
minimum value of 500 Kgf. Fixing
will be by drilling holes on the road
for the shanks to go inside, without
nails and using epoxy resin based
29 3.00 Village Name Sign :-Providing and 6397.43 Rupees Six No
fixing sign boards made out of Thousand
2mm aluminium sheet / 4mm ACP Three Hundred
(Aluminum composite Panel); size Ninety Seven
90x60 cms. rectangular as per And Paise
design of IRC-67-2012. Pre treated Forty Three
with phospheting process & acid Only
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 3.3mtr long
stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required
and frame fabricated from suitable
size iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy
coatings in black and white bends.
The details of symbol or
inscription/letters / numerals for
each board shall be as per the
instruction of engineer in charge.
The fixing at site shall be in 1:2:4
CC blockof size 45 x 45 x 60 Cms.
for each leg.including excavation,
curing etc.complete under the
supervision of engineer in charge. A
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
30 4.00 Supplying and fixing road sign 3072.99 Rupees Three No
board of M.S. plates and angle iron Thousand
including painting, lettering etc. Seventy Two
complete including fixing in C.C. And Paise
1:4:8 with necessary excavation Ninety Nine
etc. complete as per I.R.C. type Only
design.(ii) Reflective type S.O.R I
Code : 26054 B, Sr No. 99 Pg no.
31 80.00 Chevron sign :-Providing and fixing 3711.75 Rupees Three No
sign boards made out of 1.5mm Thousand
aluminium sheet / 3mm ACP Seven Hundred
(Aluminum composite Panel); size Eleven And
60x50 cm as per design of IRC-67- Paise Seventy
2012. Pre treated with phospheting Five Only
process & acid etching; coated with
one coat of epoxy primer and two
coats of best quality epoxy paint
;reflectorised with Micro Prismatic
Grade retro refiectivesheeting of
Type-11 as per ASTM D-4956 and
latest M.O.S.T.Specifications;
mtr long stand post of 75 x 75 x
6mm / 65NB Circular MS Pipe as
required and frame fabricated from
suitable size iron angle of 50 x 50 x
5mm; painted with bestquality
epoxy coatings in black and white
bends. the details of symbol or
inscription / numerals for each
board shall be as per the
instruction of engineer in
charge.The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x
Cms. for each leg.including
excavation, curing etc.complete
under the supervision of engineer
in charge. A warranty for 10 years
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
32 3.00 Direction (Junction) Sign :- 21287.51 Rupees Twenty No
Providing and fixing sign boards One Thousand
made out of 2mm aluminium sheet Two Hundred
/ 4mm ACP(Aluminum composite Eighty Seven
Panel); size 244x122 cms. And Paise Fifty
rectangular as per design of IRC-67- One Only
2012. Pre treated with phospheting
process & acid etching; coated with
one coat of epoxy primer and two
coats of best quality epoxy paint
;reflectorised with Micro Prismatic
Grade retro refiectivesheeting of
Type-11 as per ASTM D-4956 and
latest M.O.S.T.Specifications;
4.0mtr long (2 Nos.) stand post of
75 x 75 x 6mm / 65NB Circular MS
Pipe as required and frame
fabricated from suitable size iron
angle of 50 x 50 x 5mm; painted
with bestquality epoxy coatings in
black and white bends. The details
of symbol foreach board shall be as
per theinstruction of engineer in
charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x
Cms. for each leg.including
excavation, curing etc.complete
under the supervision of engineer
in charge. A warranty for 10 years
33 2.00 Cautionary Warning Sign :- 3906.19 Rupees Three No
Providing and fixing sign boards Thousand Nine
made out of 2mm aluminium sheet Hundred Six
/ 4mm ACP (Aluminum composite And Paise
Panel); size 90 x 90 x 90 cms. Nineteen Only
equilateral triangle as per design of
IRC-67-2012. Pre treated with
phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 3.6mtr long
stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required
and frame fabricated from suitable
size iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy
coatings in black and white bends.
The details of symbol foreach board
shall be as per theinstruction of
engineer in charge. The fixing at
site shall be in 1:2:4 CC blockof
size 45 x 45 x 60 Cms. for each
leg.including excavation, curing
etc.complete under the supervision
of engineer in charge. A warranty
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
34 3.00 Facility Informatory Sign :- 3990.64 Rupees Three No
Providing and fixing sign boards Thousand Nine
made out of 2mm aluminium sheet Hundred
/ 4mm ACP(Aluminum composite Ninety And
Panel); size 80 x 60 cmsrectangular Paise Sixty
as per design of IRC-67-2012. Pre Four Only
treated with phospheting process &
acid etching; coated with one coat
of epoxy primer and two coats of
best quality epoxy paint
;reflectorised with Micro Prismatic
Grade retro refiectivesheeting of
Type-11 as per ASTM D-4956 and
latest M.O.S.T.Specifications;
3.6mtr long stand post of 75 x 75 x
6mm / 65NB Circular MS Pipe as
required and frame fabricated from
suitable size iron angle of 35 x 35 x
3mm; painted with bestquality
epoxy coatings in black and white
bends. The details of symbol
foreach board shall be as per
theinstruction of engineer in
charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x
Cms. for each leg.including
excavation, curing etc.complete
under the supervision of engineer
in charge. A warranty for 10 years
35 2.00 Regulatory / Mandatory Sign :- 3540.12 Rupees Three No
Providing and fixing sign boards Thousand Five
made out of 2mm aluminium sheet Hundred Forty
/ 4mm ACP (Aluminum composite And Paise
Panel); size 60 cms Dia Circle as Twelve Only
per design of IRC-67-2012. Pre
treated with phospheting process &
acid etching; coated with one coat
of epoxy primer and two coats of
best quality epoxy paint
;reflectorised with Micro Prismatic
Grade retro refiectivesheeting of
Type-11 as per ASTM D-4956 and
latest M.O.S.T.Specifications;
3.6mtr long stand post of 75 x 75 x
6mm / 65NB Circular MS Pipe as
required and frame fabricated from
suitable size iron angle of 35 x 35 x
3mm; painted with bestquality
epoxy coatings in black and white
bends. The details of symbol
foreach board shall be as per
theinstruction of engineer in
charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x
Cms. for each leg.including
excavation, curing etc.complete
under the supervision of engineer
in charge. A warranty for 10 years
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
36 5.00 STOP Sign :-Providing and fixing 6704.36 Rupees Six No
sign boards made out of 2mm Thousand
aluminium sheet / 4mm ACP Seven Hundred
(Aluminum composite Panel); size Four And Paise
90 cms Octagone as per design of, Thirty Six Only
IRC-67-2012. Pre treated with
phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 3.6mtr long
stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required
and framem fabricated from
suitable size iron angle of 35 x 35 x
3mm; painted with bestquality
epoxy coatings in black and white
bends. The details of symbol
foreach board shall be as per
theinstruction of engineer in
charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x
Cms. for each leg.including
excavation, curing etc.complete
under the supervision of engineer
in charge. A warranty or 10 years
37 2.00 Distance Informatory / Destination 18254.19 Rupees No
Sign :-Providing and fixing sign Eighteen
boards made out of 2mm Thousand Two
aluminium sheet / 4mm ACP Hundred Fifty
(Aluminum composite Panel); size Four And Paise
180x120 cms. rectangular as per Nineteen Only
design of IRC-67-2012. Pre treated
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 4.0mtr long
(Nos.) stand post of 75 x 75 x 6mm
/ 65NB Circular MS Pipe as
required and frame fabricated from
suitable size iron angle of 50 x 50 x
5mm; painted with bestquality
epoxy coatings in black and white
bends. The details of symbol
foreach board shall be as per
theinstruction of engineer in
charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x
Cms. for each leg.including
excavation, curing etc.complete
under the supervision of engineer
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
38 3.00 Place Identification Sign :-Providing 12341.52 Rupees Twelve No
and fixing sign boards made out of Thousand
2mm aluminium sheet / 4mm ACP Three Hundred
(Aluminum composite Panel); size Forty One And
150x90 cms. rectangular as per Paise Fifty Two
design of IRC-67-2012. Pre treated Only
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 4.0mtr long
(2 Nos.) stand post of 75 x 75 x
6mm / 65NB Circular MS Pipe as
required and frame fabricated from
suitable size iron angle of 35 x 35 x
3mm; painted with bestquality
epoxy coatings in black and white
bends. The details of symbol
foreach board shall be as per
theinstruction of engineer in
charge. The fixing at site shall be in
1:2:4 CC blockof size 45 x 45 x
Cms. for each leg.including
excavation, curing etc.complete
under the supervision of engineer
in charge. A warranty for 10 years
39 36.00 Hazard Marker Sign :-Providing and 3518.69 Rupees Three No
fixing sign boards made out of 2.0 Thousand Five
mm aluminium sheet / 4 mm ACP Hundred
(Aluminum composite Panel); size Eighteen And
90x30 cms. rectangular as per Paise Sixty
design of IRC-67-2012. Pre treated Nine Only
with phospheting process & acid
etching; coated with one coat of
epoxy primer and two coats of best
quality epoxy paint ;reflectorised
with Micro Prismatic Grade retro
refiectivesheeting of Type-11 as per
ASTM D-4956 and latest
M.O.S.T.Specifications; 1.8mtr long
stand post of 75 x 75 x 6mm /
65NB Circular MS Pipe as required
and frame fabricated from suitable
size iron angle of 35 x 35 x 3mm;
painted with bestquality epoxy
coatings in black and white bends.
The details of symbol foreach board
shall be as per theinstruction of
engineer in charge. The fixing at
site shall be in 1:2:4 CC blockof
size 45 x 45 x 60 Cms. for each
leg.including excavation, curing
etc.complete under the supervision
of engineer in charge. A warranty
for 10 years for the Retro reflective
Rupees Five Crore Sixty Nine Lakh(s) Forty Nine Thousand Three Hundred Six And Paise
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
*Estimated amount *Estimated amount
Put to tender Rs……………………… Put to tender Rs………………………
Deduct : ………% below Add : ………% above
Net Rs……………………… Net Rs………………………
In words ……………………………… In words ………………………………
*(please strike out whichever is not applicable)
Note-1 All works shall be carried out as per Public Works Department Handbook and other specifications of
Division or as directed.
Note-3 Rates quoted include clearance of site (prior commencement of work and its close) in all respects and
hold good for work under all conditions, site, moisture, weather etc.
Note-5 Testing of material shall be statement attached with the GERI Vadodara. Bill for testing charges shall
be paid by the Executive Engineer and 1% (One Percent) of amount put to tender excluding cost of
materials to be issued as schedule A i.e. Rs. _________ shall be recovered from the Contractor's
running bills as per (R&B) Department No.TNC/1085/(4)/C dated 10-5-85 and 20-12-91.
Note-8 pnMU VG[ BF6 lJEFU4 ;lRJF,I4 UF\WLGUZGF 9ZFJ S|DF\So V[DPV[DPVFZPv !!Z___vZ_!#vK4 TFP!q)qZ__$
YL ZFHI ;ZSFZGF AF\WSFD DF8[ J5ZFTF UF{6vBlGHGL ZMI<8L ;FNL DF8L VG[ ;MO8 DMZD 5Z ZMI<8L ,FU] 50X[P
Note-9 Labour Cess 1% of estimated cost put to tender for this work shall be recovered from the contract
payment as "Labour Cess" in terms of the Gujarat Govt. Gazette - extra ordinary - dt.12.12.2004,
implementation of buildings and other construction work (resolution of employment and conditions of
services Act'1996)
Note-10 Quantity of items may reduce or increase as per work execution.
Note-11 p5ZMST SFD SM.56 SFZ6;Z D\H]Z q GFD\H]Z SZJFGL ;œF ;CL SZGFZ VlWSFZLGL VAFlWT ZC[X[P
Note-13 In RCC items where there is change of grade mix or change as per actual mix design the difference of
cement consumption shall be deducted from rate of original item at the rate of star rate mentioned in
tender. However for Increase in quantity of cement no additional payment shall be made.
Note-14 For earthquake resistance provision the work shall be carried out as per the instruction of Engineer in-
Note-16 CM8DL1F %,Fg8 VG[ 5[JZYL YTF 0FDZGF SFDM AFAT[ ;ZSFZzLGF DFP VG[ DP lJEFU4 UF\WLGUZGF 5lZ5+
G\PV[;V[RVFZq!5(&qVF.ALq!*)s&fv;4 TFPZ_q!q_* VG[ 5ZL5+ S|DF\SP5ZRq!_qZ_!5q55q;L4 TFP_$q!!q!5
D]HA VG];ZJFG]\ ZC[X[P
Note-17 U]HZFT ;ZSFZzLGF DFPDPlJEFUGF 5lZ5+ S|DF\So VFZHLV[Gq&_Z__&qs#5fv; YL NFB, YI[, XZTMP
1) 5_DLDLYL JW] 0FDZ SFDGL ;\I]ST HF0F. sALPV[;PHLP4 ALPALPV[DP l;JFIf CMI T[JF Z:TFGF SFDDF\ NZ Z5_DLP NL9
V[S S|M; ;[SXG 5Z 0FDZSFDGL 5CM/F. VG];FZ A[ YL RFZ SMZ ;[d5, .HFZNFZ[ 5MTFGF SMZ S8L\U DXLG J0[ ;\A\lWT
GFIA SFI"5F,S .HG[ZzLGL CFHZLDF\ D[/JL VF5JFGF ZC[X[ VG[ VF ;[d5, ;L, SZL DFgI ,[AMZ[8ZL DFZOT YLSG[;4
0[g;L8L TYF AL8]DLG; Sg8[\8GF 5lZ1F6 SZFJL 5lZ6FD[ D[/JJFGF ZC[X[P ;\TMQFSFZS 5lZ6FDM VFjIF ;]WL 0FDZ SFDGL
R]SJJF5F+ ZSDGF 5@ ZSD JLYC[<0 ZFBJFDF\ VFJX[4 H[ ZSD ;\TMQFSFZS 5lZ6FDM D?IF AFN H K]8L SZFX[P 5Z\T]
;\TMQFSFZS 5lZ6FDM GlC\ D[/JJFGF lS:;FVMDF\ SZFZGL VgI XZTM VG];FZ SFI"JFCL Y. XSX[P
It. Qty. Item of work Estimated Rates Unit Total amount
It. Qty. Item of work Estimated Rates Unit Total amount
Estimated according to
No. In Figures In Words
but may be estimated Quantities
2) ~FP!__ ,FB S[ T[YL JW] ZSDGF SZFZ C[9/GF SFD 5Z .HFZNFZ[ O],8F.D SJM,LOF.0 V[gHLGLIZ lGI]ST SZJFGM ZC[X[
H[ V\U[ SFDGF JS"VM0"Z D?I[ lNGv!5 DF\ SFI"5F,S .HG[ZzLGL HF6 C[9/4 GFIA SFI"5F,S .HG[ZzLG[ lGO]S .HG[ZGF
GFD4 SJM,LOLS[XG4 DFS"XL84 ;8L"OLS[84 S,Z OM8MU|FO4 lGI]lSTGF C]SD JU[Z[ lJUT ZH] SZJFGL ZC[X[ TYF SFD 5Z CFHZ
YIF V\U[GM ZL5M8" VF5JFGM ZC[X[4 H[ VG];FZ SZFZ C[9/GF SFD 5Z SJM,LOF.0 .HG[ZGL p5ZMST XZT D]HA lGI]lST
YFI TYF :Y/ 5Z BZ[BZ SFDULZL G ;\EF/[ tIF\ ;]WLGF ;DIUF/F T[DH SFD RF,] ZC[ T[ ;DI NZdIFG lGI]S SZ[, .HG[Z
SFDULZL ;\EF/X[ GlC\ T[ ;DIUF/F DF8[ ~FP!54___qv 5|lTDF; ,[B[ lA,DF\YL S5FT SZJFDF\ VFJX4 H[ GMG ZLO\0[A,
Signature of Contractor Executive Engineer
R&B Division, Bhuj
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
Additional Instructions.pdf
BOQ.pdf
Bridge Booklet(1).pdf
Bridge Booklet(2).pdf
BUILDING SPECIFICATIONS BOOK.pdf
GR.pdf
ROAD WORK Booklet - 1.pdf
ROAD WORK Booklet - 2.pdf
SBD Book.pdf
Special Condition for RPM.pdf
Special Condition for signage.pdf
Special Condition for Thermoplast.pdf
Specifications.pdf
Spe. Index.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .