Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.9 CrAdmitted-Finance 916 9 AWAS VIKAS COLONY RISHIKESH | DEHRADUN | UTTARAKHAND | 248001 | ₹1.9 Cr | L2 | Admitted-Finance |
| 3 | Rejected-Technical | - | - | Rejected-Technical Not Admitted |
| Sl No | Description | Qty | Unit | M/S R. B. ELECTRICALS L2 | GRAMIN VIKASH TAKNIKI SANSTHAN L1 |
|---|---|---|---|---|---|
| 1.00Electrical Items : | |||||
| 2.00 | E-CLAMP FOR 33kV 75X10mm WITH N&B | 114 | NOS | 61,560 ₹61,560 | 60,306 ₹60,306 |
| 3.00 | Bracing Clamp Top SP-55 with N/B | 36 | NOS | 14,688 ₹14,688 | 14,400 ₹14,400 |
| 4.00 | Bracing Clamp Bottom SP-55 with N/B | 36 | NOS | 16,524 ₹16,524 | 16,200 ₹16,200 |
| 5.00 | Nut & Bolts | 14 | KG | 1,428 ₹1,428 | 1,400 ₹1,400 |
| 6.00 | PP & CLAMP WITH N&B ST POLE SP-55 | 62 | NOS | 28,458 ₹28,458 | 27,900 ₹27,900 |
| 7.00 | Stay Clamp for SP-55 With Nut & Bolt | 80 | NOS | 36,720 ₹36,720 | 36,000 ₹36,000 |
| 8.00 | STAY CLAMP FOR SP-33 WITH NUT & BOLT | 40 | NOS | 14,280 ₹14,280 | 14,000 ₹14,000 |
| 9.00 | PP & CLAMP WITH N&B ST POLE SP-33 | 26 | NOS | 10,608 ₹10,608 | 10,400 ₹10,400 |
| 10.00 | Earth Clamp STP SP-33/55/72 Pole WithN&B | 140 | NOS | 64,260 ₹64,260 | 63,000 ₹63,000 |
Tender Value
Refer Docs
EMD Value
₹3.7 L
Closing Date
3 Feb 2026, 2:00 pmClosed
SE
EDC TEHRI
Under Missing link scheme, Replacement the conductor of 33 KV line (Raccoon to Dog) from 33/11 KV S/s Dhanarigad to 33/11 KV S/s Chinyalisaur for the evacuation of Solar Power under MSSY of EDD Uttarkashi
2026_UPCL4_91041_1
43/EDCT/2025-26
Open Tender
Miscellaneous Services
90 days
Uttarkashi
Please refer Tender documents.
3 documents required · 3 mandatory
₹11,800
Yes
EE TEST
₹3.7 L
Yes
23 Apr 2026
17 Jan 2026
4 Feb 2026
17 Jan 2026
3 Feb 2026
17 Jan 2026
E-CLAMP FOR 33kV 75X10mm WITH N&B
Bracing Clamp Top SP-55 with N/B
Bracing Clamp Bottom SP-55 with N/B
Nut & Bolts
PP & CLAMP WITH N&B ST POLE SP-55
Stay Clamp for SP-55 With Nut & Bolt
STAY CLAMP FOR SP-33 WITH NUT & BOLT
PP & CLAMP WITH N&B ST POLE SP-33
Earth Clamp STP SP-33/55/72 Pole WithN&B
33KV IPC for CC to Bare Conn. Both end
33 KV Mid Span Jointing Kit
33 KV Tension clamp with Bail & IPC
33 KV Cable ties for Pin insulator
33 KV IPC for covered to covered conduct
IPC with aluminium bail for earthing
Double Tension Disc Fitting 70KN-D
33kv al 59 104 mm2 Covered Conductor
SERVICES(LABOUR)
CONSTRUCTION OF RETURNING WALL & PLINTH
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
EXCAVATION OF PIT FOR STAY SET
ERECTION OF 33 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-33 POLE
ERECTION OF SINGLE SP-55 POLE
ERECTION OF SP-55 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
DISMANTLING OF SP-33 SINGLE POLE
DISMANTLING OF SP-33 DOUBLE POLE
DISMANTLING OF LT LINE 3 P 4 W(RACCOON))
LAYING OF DOG CONDUCTOR IN HT LINE
GUARDING OF 33 KV LINE
LOPPING & CHOPPINGOF TREE BRANCHES
MAKING OF SECTION POLE
CARTAGE SP-33 POLE, 151-200KM
CARTAGE SP-55 POLE, 151-200KM
CARTAGE OF PETTY MATERIAL,151-200KM
HEADLOAD CARTAGE SP-33 POLE(1-3 KM)
HEADLOAD CARTAGE SP-55 POLE(1-3 KM)
HEADLOAD CARTAGE OF MATERIAL(1-3 KM)
TIGHTENING OF STAY SET
STRAIGHTENING OF TILT SINGLE POLE 33 KV
BACK CARTAGE OF PETTY MATERIAL,151-200KM
FIXING OF 33 KV TENSION CLAMP WITH IPC
FIXING OF 33 KV IPC FOR CC TO CC COND.
FIXING OF 33 KV IPC FOR CC TO BARE COND.
FIXING OF 33 KV MID SPAN JOINTING KIT
FIXING OF IPC WITH AL. BAIL FOR EARTHING
BACK HEAD LOAD CART. OF PETTY MAT. 1-3KM
FIXING OF 33KV CABLE TIES
FIXING OF BRACING SET
LAYING SPREAD. SAGGING 33KV LINE ON AL59
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.41 MB
BOQ_107862.xls
BOQ • 0.35 MB
ss.pdf
Tender Documents • 2.26 MB
43PQR.xls
Other Document • 0.03 MB
Download all tender documents and submit your bid