| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.1 LAccepted-AOC AJITH BHAVAN KANDAMTHITTA PANTHA PO THIRUVANANTHAPURAM KERALA 695573 | THIRUVANANTHAPURAM | KERALA | 695573 | ₹4.1 L | L1 | Accepted-AOC commitee accepted |
| 2 | Rejected-Technical | - | - | Rejected-Technical rejected |
Tender Value
₹5 L
EMD Value
₹5,000
Closing Date
13 Sept 2023, 3:00 pmClosed
Chief Government Analyst
Chief Government Analyst Drugs Tesing laboratory Red cross road Vanchiyoor(p.o) Thiruvananthapuram-695035
Comprehensive Annual Maintenance Contract for Air Handling Unit(with Calibration)
2023_DCD_597451_1
EP-01/2023-24/DTL/TVM
Open Tender
AMC/ Maintenance Contracts
Service
30 days
vanchiyoor
please refer tender documents
3 documents required · 3 mandatory
₹1,180
Yes
₹5,000
Yes
20 Apr 2024
22 Aug 2023
16 Sept 2023
22 Aug 2023
13 Sept 2023
22 Aug 2023
I) Clean Room Validation as per grade A, B, C & D (i) Air Flow Velocity (ii) Air Changes per Hour(iii) Filter Integrity Test (iv) Differential Pressure (v) Recovery Time (vi) Room Temperature & Humidity(vii) Particle Count II) Maintenance, Servicing & Overhauling works of HVAC System A) Air Handling Units - 3 Nos (8.5 Ton x 2 Nos. & 5.5 Ton x 1 No.) (i) Flushing and Cleaning of Finned Surface & DX Tubes of Cooling Coils(ii) Checking & Replacement of faulty Fan Bearing(iii) Checking & Replacement of faulty Motor Bearing(iv) Checking of Belt Allignment and Tension & Mounting Bolts.(v) Cleaning of Filters, Replacement of Defective Belts, Pulleys, Blowers, Shafts, Bearings of AHUs whenever found defective. B) Electrical Panels and Wiring (i) Checking and Servicing of Contactors, Capacitors, Overloads, MCCBs and Fuses, Tightening of wiring connections and Replacement of faulty parts if required.(ii) Checking of Wiring Insulations & Motor Winding (iii) Checking of Earthing. C) Outdoor Units - 3 Nos (8.5 Ton x 2 Nos. & 5.5 Ton x 1 No.) Flushing & Cleaning of finned surface of condenser, General Change of compressor oil if required, greasing of bearing and oiling wherever required, replacement of motors and compressor if required. Topping of refrigerant whenever required. Rectification of leak if any and testing the system with nitrogen pressure and re-commissioning after vaccumization, replacement of insulation sleeves on Copper tubings. III) Other Works Metal painting work:Working area:A/C Duct support L angle ,Control panel,A/C outdoor unit,Blower ,Paint Category:Automotive,Product: 1 st section-Nippon 1K filler epoxy,2 nd section-Duco (Automotive)paint,Complete rustiness area cleaned with sand paper,Applying 1 st coat epoxy primer,Applying 2 nd coat epoxy primer,Applying 1 st coat Duco(automotive) paint,,Applying 2 nd coat Duco(automotive) paint,Indoor to outdoor copper pipe insulation work(insulation size 7/8),Control panel re-writing and all electrical items replacing work. Validation Frequency : 2 tests per year Breakdown attendance: Within 24 hrs.
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_886724.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .