Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 4 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 5 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
7 Jun 2021, 5:00 pmClosed
Executive Engineer
OFFICE OF THE EXECUTIVE ENGINEER UTTARAKHAND JAL SANSTHAN, HALDWANI, NAINITAL
Shifting and Strengthening of Distribution System Due to Road Widening by Nahar Covering (Chambal Pul to Chaufula Chauraha) Undar Paniyali Water Supply Scheme Under CM Announcement
2021_UKJS_32996_1
1417/Nivida/173 dated 19.05.21
Open Tender
Civil Works - Water Works
Item Wise
180 days
Haldwani
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,720
Executive Engineer, UJS
Exempted
8 Jun 2021
24 May 2021
8 Jun 2021
24 May 2021
7 Jun 2021
24 May 2021
Rates for Shifting & Strengthening of Distribution System Due to Road Widening by Nahar Covering (Chambal Pul to Chaufula Chauraha) Undar Paniyali Water Supply Scheme Under CM Announcement
Dismantling of Bituminous / Concrete road during pipe laying including all labour, material, T & P etc. complete.
Excavation of earth for pipe line in following strata lift upto 1.50 m. and lead upto 30.00 m. including refilling, watering, ramming of excavated earth into the trenches and removal of surplus earth upto a distance of 60.00 m. from trenches including supply of labour T&P etc. all complete. It is estimated that 75% excavation will be in soil mixed with shingle, bajari & boulders and rest 25% will be in medium rock. Soil mixed with Shingle, Boulders etc.
Cartage of following pipes, specials & fittings from site store to the site of works, lowering them into trenches, laying true to alignment & gradient, laying & joining of pipe line including cutting & threading of pipe for making up lengths as required for proper completion of work. (G.I. Medium) G.I (Medium Class)Confirming to IS: 1239 (Part - I) / 2004 1) 100 mm dia
2) 80 mm dia
3) 50 mm dia
Cartage of following pipes, specials & fittings from site store to the site of works, lowering them into trenches, laying true to alignment & gradient, laying & joining of pipe line including cutting & welding of pipe for making up lengths as required for proper completion of work. MSERW Line Pipe (4.80 mm Thick). Confirming to BIS: IS / ISO 3183 / 2007 1) 350 mm dia
2) 200 mm dia
3) 150 mm dia
Cartage of C.I./C.S. Sluice or Reflex Valves of 50 to 125 mm dia sizes to the site of work, lowering in already prepared trenches and fixing them in position, but excluding cost of earth work and all material. (Labour cost only) 1) For 50 and 125mm size
2) Same as above but for 150 and 200mm size
3) Same as above but for 350 and 400mm size
Making connection with the existing M.S. Galvanised mains of , including cutting and threading of pipe, bailing out water, fixing, if required, specials and testing etc. complete, but excluding cost of insertion pipes and specials besides boring out (and also subsequent back fill) existing main. 1) 50 mm to 80 mm nominal dia
2) 100 mm to 150 mm nominal dia
Shifting of house connection.
Constructing masonry Chamber 120x120x100 cm inside, in brick work in cement mortar 1:4 (1 cement : 4 coarse sand) for sluice valve, with C.I. surface box 100 mm top diameter, 160 mm bottom diameter and 180 mm deep ( inside) with chained lid and RCC top slab 1:2:4 mix (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size) , i/c necessary excavation, foundation concrete 1:5:10 (1 cement : 5 fine sand : 10 graded stone aggregate 40 mm nominal size) and inside plastering with cement mortar 1:3 (1 cement : 3 coarse sand) 12 mm thick, finished with a floating coat of neat cement complete as per standard design : With common burnt clay F.P.S.(non modular) bricks of class designation 7.5.
Temporary Shifting of house connection during Nahar covering work.
GANPATI ENTERPRISES
Prashant Buildteck (P) Ltd
M/s KHIM SINGH BISHT CONTRACTOR
GRODOT INFRASTRUCTURE LIMITED
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .