The Executive Engineer, Water Resources Investigation Division, Bhuj
Providing consultancy services for survey work of Mevasa MIS , village-Mevasa Rapar Taluka of Kachchh District
270945
SBD-25 of 2025-26
Open
Civil - All
Works
Kutch
8 documents required · 8 mandatory
₹600
Yes
The Executive Engineer, Water Resources Investigation Division Bhuj
₹1,900
Yes
29 Jan 2026
29 Jan 2026
29 Jan 2026
7 Feb 2026
29 Jan 2026
4 Brief Description of work
9 Camp Regulations
11 Power Supply
13 Post, Telegraphs & Telephone
14 Bank Facility
15 Supply of Petrol & Diesel
WORK AND SITE CONDITION
1.00 INTRODUCTION:-
GENERAL FEATURES OF THE PROJECT
Providing consultancy services for survey work of Mevasa MIS , village-Mevasa Rapar
Taluka of Kachchh DistrictThe Purpose of work is to Providing consultancy services
for survey work of Mevasa MIS , village-Mevasa Rapar Taluka of Kachchh District
2.00 LOCATION:-
The proposed site is situated as below:-
The proposed project site is situated near Villages:Mevasa ( Rapar of Kachchh-District
The nearest railway station is Samkhiyali.
3.00 COMMUNICATION:-
The nearest city & town is Rapar is a taluka place of Kachchh district. Nearest villages
are connected through VRB & SH with district and taluka place.
4.00 BRIEF DESCRIPTION OF WORK:-
WORK TO BE EXECUTED / SCOPE
(a) Survey By DGPS
(b) Computing cross-section
(c) Preparation of L Section
4.1 Proposed work consists following:-
Providing consultancy services for survey work of Mevasa MIS , village-Mevasa Rapar
Taluka of Kachchh District).
4.2 Cost of work: Rs.
II. PRINCIPAL DETAILS OF WORK:
Works to be performed for the various items included in Bill of Quantity.
The above information is only a general outline and does not in any way limit, the
performance of all work and supply of plant, machinery, all labour and materials
necessary for completing the works as shown in the approved working drawing and
mentioned in the specification. No extra payment or claim on account of any additions
or alteration in working drawing shall be admissible.
Availability is good except showing and harvesting period. However there may be
shortage of skilled labour like masons, carpenters operators, mechanics etc. However
the contractors shall have to make his own inquiry in this regard and quote his rates.
Area being highly rural, there is no local housing arrangement available and contractor
will have to make his own arrangements for his staff and labour etc.
7.00 WATER SUPPLY:
The contractor shall have to make his own arrangements of water supply for this work.
Fresh use of available water for work will be allowed free of cost to the contractor from
the river length flowing in the construction areas and area transferred to Narmada
Water Resources, W.S. & K. Department. Contractor shall have to make his own
arrangement for Pumping, purification; storage tanks, pipe line etc. for the said purpose
at his own cost.
Suitable and adequate arrangement shall have to be made by the contractor for
drainage of water around his colony and work spots. The contractor shall also have to
install and maintain at his own cost suitable drainage system to dispose off sewage &
solid waste from his colony. The labour colony layout shall be got approved from the
Engineer-in-charge.
9.0 CAMP REGULATIONS:
The contractor shall be responsible for maintaining law and order in his camp and on
his work, and shall employ such officers, watchman or other persons as required,
unauthorized or undesirable persons shall be excluded from the camp and the work. If
in the opinion (which shall not be questioned) of the Engineer-in-charge any employee
or agent of the contractor misbehaves and/or causes obstructions in the proper
execution or otherwise makes himself undesirable, the contractor shall on receipt of the
instruction to do so remove him from the premises.
10.00 MEDICAL AID:
There is no dispensary on Project Site. However there is a Government Hospital at
Bhuj / Kachchh. The Services of this Hospital will be available to contractor's staff and
labour on payment of requisite charges as may be required to be paid by the agency at
his risk & cost.
11.00 POWER SUPPLY:
Power supply shall be arranged by the contractor at their own cost. No power supply is
guaranteed by the department.
The contractor shall construct and maintain the inspection roads and quarries roads for
all purposes required during construction at his own cost. There will however be no
charge for any reasonable use of any road constructed by Government at site of work.
At present site is only approachable during fair weather.
13.00 POST, TELEGRAPHS & TELEPHONE:
Post office is available at taluka head quarter. Contractor shall make their own
arrangements for telephone if required.
14.00 BANK FACILITY:
Branches of Nationalized Bank and other Schedule Banks are available at Taluka. head
15.00 SUPPLY OF PETROL & DIESEL:
There is no petrol pump near Dam site. However Petrol & Diesel will be available from
Taluka Head Quarter.
16.00 MATERIALS:- (Quarry details are shown for guidance purpose only)
Water is scarily available in Dam vicinity area however contractor shall have to make
his own arrangement and inquiry regarding this at his own cost.
Good quality natural sand will be available within lead of 25 km from all site of Rapar
Taluka. However sand of required quantity may not be available in reasonable lead.
The contractor should arrange to obtain the sand of approved quality from any lead. No
extra claim shall be admissible for extra lead.
(c) COARSE AGGREGATE (CRUSHED METAL)
The black stone crushed metal for concrete work will be obtained from stone crushers
situated in the vicinity of dam site within 25 km lead near village Rapar Taluka.
However coarse aggregate of required size & quantity may not be available in
reasonable lead, the contractor should arrange to obtain the coarse aggregate of
required size & of approved quality from any lead. No extra claim shall be admissible
for extra lead.
The good quality black stone hard stone to be used in pitching / Masonary work
available within 25 km distance from dam site near of Village of Rapar Taluka. The
contractor shall have to make his own inquires regarding availability of above materials
and other materials for work and accordingly he should quote the rates. If the materials
of required standard are not available from the specified quarries, no extra lead will be
payable by the department. Contractor should make his own arrangement to bring all
materials from any lead without any extra cost to the Department.
Signature of Contractor Executive Engineer
Water Resources Investigation Division
GENERAL CONDITION
GENERAL CONDITIONS
Sr. Particulars Page
2 Interpretations
3 Period Of Completion
4 Language Of The Contract
5 Notice And Instructions
6 Tools, Plants & Equipments And Instructions
7 Reference Marks & Bench Marks
8 Information And Data
9 Permission To Enter And Work In Private Field
11 Removal Of Contractor's Men
12 Certificate Of Completion Of Works
13 Tolls And Duties
14 Old Curiosities
15 Engineer's Decisions
16 Other Contractor's
17 Other Workmen
18 Payment And Certificates
19 Release Of Claims
21 Observance Of Laws, Local Regulations & Attachments
22 Contractor Dying Recomming Insolvent, Insane Or Imprisoned
23 For Closure Of Works By Government
24 Extension Of Time
25 Settlement Of Disputes
26 Base Lines And Grades
27 Damage By Floods Or Accident
28 Reference Marks And Bench Marks
30 Income Tax, Surcharge, Education Tax
31 Labours Welfare Cess
32 Contract Documents And Matter To Be Treated As Confidential
33 Work Order Book
GENERAL CONDITIONS
All the conditions given in the clause appearing herein after shall be deemed to
form a part of the contract in S.B.D. form and shall be deemed as supplemental to the
same. These conditions shall be binding to the contractor in the same manner as terms
and conditions in the S.B.D. Form.
1.00 DEFINITIONS:
In the contract (as hereinafter defined), the following words and expressions shall have
the meanings hereby assigned to them.
(a) Approved/Approval:
Means approved / approval in writing by the Engineer-in-charge.
Means the instructions and information for tenderers, general and special conditions of
contract, specifications, drawings, tender (including schedules of quantities & tender
prices), the formal agreement and all agenda and attachments related to the above.
(c) Contractor:
Means the particular person, firm or corporation with whom the contract has been made
for executing the works under question.
(d) Construction Plant:
Means all equipment, machineries, appliances or things of whatsoever nature required
for the execution, completion or maintenance of the work or temporary works.
(e) The Department:
Means Government of Gujarat, Narmada, Water Resources, Water Supply and Kalpsar
Department, Gandhinagar.
Means the drawings referred to in the specifications, any modifications of such
drawings approved in writing by the Executive Engineer, and such other drawings as
may from time to time be furnished or approved in writing by the Engineer-in-charge.
(g) Executive Engineer / Engineer-in-Charge:
Means the Engineer-in-charge of the works, specified parts of the works under the
contract or such other departmental assistants or subordinates referred to Engineer-in-
charge to whom the Executive Engineer may have delegated certain in duties entrusted
to them. It is however, to be distinctly understood that, no delegation of powers shall be
made to such departmental assistants or subordinates, except in respect of supervision
to ensure compliance of the contract conditions.
(h) Government:
Government of Gujarat.
Means Indian Standard specifications.
Means a day from midnight to midnight.
Means from the beginning of a given date of calendar month to the end of preceding
date of the next calendar month.
Means three consecutive seasons (winter, summer, Monsoon each includes four
months) in Calendar year.
Means seven consecutive days.
Means Rupees of Indian Currency.
(o) Employer or Owner:
Means the Narmada Water Resource, Water Supply & Kalpsar Department,
Means the lands and other places on, under, in or through which, the works are to be
executed or carried out and any other lands or places provided by the Owner on
availability for the purposes of the contract together with such other places as may be
specifically designated in the Contract or subsequently approved as forming part of the
(q) F.A., C.A., CMD, DMC; FM, PCC, RCC NMC:
Means fine aggregate, coarse aggregate, concrete mix design, Design mix concrete
Fineness modulus, Plain cement concrete, Reinforced cement concrete, Nominal mix
concrete respectively.
(r) Fck, fcr, FY, fd:
Means characteristic cube compressive strength of concrete, Modulus of rupture of
concrete (Flexural tensile strength) characteristic strength of steel, Design strength
(s) Superintending Engineer:
Means the Superintending Engineer Kachchh Irrigation Circle, Bhuj in overall charge of
(t) Chief Engineer:
Means the Chief Engineer (Panchayat) & Additional Secretary N.W.R. & W.S. Kalpsar
Department, Gandhinagar in overall charge of the work.
(u) Temporary Works:
Means all temporary works of every kind required for performance of the Contract.
Means the works to be executed in accordance with the contract.
Means Gujarat Engineering Research Institute includes head office at Vadodara and its
Regional and district level laboratories. Nearest Regional laboratory is GERI, Bhuj.
2.00 INTERPRETATIONS:-
Words imparting the singular only, shall also include the plural, 'he' includes 'she' and
vice versa, unless this is repugnant to the extent. Wherever the term specifications is
used apart from a specified standard specifications, it shall mean the specification of
plan prepared for a particular item as per instructions to the contractor for executing the
3.00 PERIOD OF COMPLETION:-
The period of completion of the work under this contract shall be 1 (One) months.
4.00 LANGUAGE OF THE CONTRACT:-
All written materials and correspondence in connection with the contract shall be in
5.00 NOTICE AND INSTRUCTIONS:-
The contractor shall furnish the postal address of his site office. Any notice or
instructions to bed given to the contractor under the terms of the contract shall be
deemed to have been served, if it has been delivered to his authorized agent or
representative at site, or sent by registered letter to the site office or to the address of
the Firm last provided by the Contractor.
6.00 TOOLS, PLANTS & EQUIPMENTS AND INSTRUCTIONS:-
The contractor shall provide at his own expenses all tools, plants and equipments and
instruments required for the execution of the work especially for the work.
7.00 REFERENCE MARKS & BENCH MARKS:-
In addition to the permanent bench marks constructed by the Department, the
contractor shall establish at his own cost, at suitable points, referenced lines and
temporary bench marks as may be necessary. The contractor shall confirm values of
permanent Bench Marks as stated above by double leveling or by Total Station before
starting the work. The contractor shall remain responsible for the sufficiency and
accuracy of all bench marks and reference lines. He shall take precautions to see that
the lines, point and bench marks fixed by the Department, are not disturbed by his work
and shall make good any such damage. Survey of levels for establishment of TBM at
work site from PBM shall be recorded in level book.
8.00 INFORMATION AND DATA:-
The information and data furnished herein related to the works and site conditions are
general. It shall be the responsibility of the contractor to fully acquaint himself with other
aspects which are relevant to the work.
9.00 PERMISSION TO ENTER AND WORK IN PRIVATE FIELDS:-
The Department will arrange to provide authority to the contractor and his personnel for
entering the private field to fulfill his obligations under this contract, for transport and
communications to the site work for the contractor shall use public roads in the area.
10.00 ACCIDENTS:-
It shall be the contractor's responsibility to take safety measures to prevent accidents
on the works. He shall indemnify the Government against any claims for damage or for
injury to persons or property resulting from and in the course of work and also under the
workmen's compensation Act. On the occurrence of an accident during the
performance of the works, which results in death of which is so serious that it might
result in death, the contractor shall immediately report the matter to the police and
within 24 hours of such accident, report in writing to the Executive Engineer the facts,
stating, clearly and in sufficient details the circumstances of such accident and the
subsequent action taken by him as may be needed under Rules/Acts in force. All other
accidents on the work involving injuries to persons or damage on the work to property,
other than that of the contractor shall be promptly reported to the Executive Engineer
stating clearly and in sufficient details the facts and circumstances of the accidents and
the actions taken. In all cases, the contractor shall indemnify the Govt. against all
losses or damages resulting directly or indirectly from the contractor's failure to report in
the manner aforesaid. This include penalties or fines, if any payable by the Govt. as a
consequence of failure to give notice under the workmen's compensation Act or failure
to confirm to the provisions of the said Act in regard to such accidents.
In the event of an accident, in respect of which, compensation may become payable
under the workmen's compensation Act. Including all modifications thereof, whether
such compensations may become payable by the contractor or by the Government as
principal employer, the Executive Engineer may retain, amount of money due and
payable to the contractor, such sum or sums of money as may, in the opinion of the
Executive Engineer-in-charge be sufficient to meet such liability. On receipt of the
award from the labour commissioner in regard to quantum of compensation the
difference in amount will be adjusted.
11.00 REMOVAL OF CONTRACTOR'S MEN:-
The contractor shall on the written direction of the Executive Engineer immediately
remove from the works, any person employed there on, who may, in the opinion of the
Executive Engineer, be in competent or has misconduct himself, such persons shall not
be employed against on the works without the written permission of the Executive
Engineer in charge.
12.00 CERTIFICATE OF COMPLETION OF WORKS:-
As soon as the works completed, the contractor shall give notice of such completion of
the Executive Engineer and within one month of receipt of such notice, the Engineer-in-
charge shall furnish the contractor with a certificate of completion or otherwise, inform
him in writing giving reasons for not granting the certificate.
13.00 TOLLS AND DUTIES:-
The contractor shall unless otherwise specified in the contracts, pay all duties, tolls,
octroi, quarry fees, royalties and other taxes on all materials and articles that he may
14.00 OLD CURIOSITIES:-
All old curiosities, relies, coins, minerals and other items of archeological importance
found in excavation or pulling down shall be the property of the Govt. and shall be
handed over to the Executive Engineer, should any structure be uncovered, the
Executive Engineer's instruction shall be obtained before its demolition or removal.
15.00 ENGINEER'S DECISIONS:-
It shall be accepted as a inseparable part of the contract that in matter regarding
materials, workmanship, removal of improper work, interpretation of the Contract
specifications, mode of procedure and the carrying out of the work, the decision of
Executive Engineer / Engineer-in-charge which shall be given in writing, shall be final
and binding to the contractor.
In case of any discrepancy between the descriptions of items in the Bill of Quantity and
Technical Specifications the former shall prevail. And further in case of any discrepancy
between the discrepancy S.B.D. and Technical Specifications the former (S.B.D. Form)
shall applicable. In case any clarification on any item is necessary, the contractor shall
forthwith apply to the Executive Engineer, any modifications in specifications ordered by
the Engineer-in-charge would be in writing.
The Executive Engineer/ Engineer-in-charge's final authority mentioned above applied
to technical considerations and does not included decisions regarding sums due to or
from the contractor or extension of time.
16.00 OTHER CONTRACTOR’S:-
When two or more contractors are engaged on work in the vicinity, they shall work
together in spirit of Co-operation and accommodation. The contractor shall not take or
cause to be taken any steps or actions taken may cause disruptions, discontent or
disturbance to the work labour and arrangements of other contractor in the neighboring
and the project locations. In case of any difficulties amongst the Contractors, the
Engineer-in-charge shall direct the matter, in which each contractor shall conduct his
work so far as it affects the others.
17.00 OTHER WORKMEN:-
The Executive Engineer shall have full authority to depute workmen on the work site,
execute other works not included in the contract. The contractor shall afford every
reasonable facility during working hours to enable such workmen to carry out the other
works provided that such work shall be carried out in such manner as not to impede the
progress of the work included in the contract. The contractor, however, shall not be
liable for any damage which may happen to or be occasioned by such other works,
provided he complied with the instruction in connection therewith and provided that the
damage is not caused by the contractor or his workman.
18.00 PAYMENT AND CERTIFICATES:-
Payment for the work done by the contractor shall be caused on measurements
recorded at various stages of the work. The contractor or his authorized agent or
representatives shall remain present at the time of recording of each set of
measurements and sign the appropriate documents in taken of their acceptance.
If for any reasons of the contractor or his authority agent is not available, and the work
is suspended the Executive Engineer to avoid recording of measurement during the
absence of the contractor or his authorized for representative does not remain present
at the time of such measurements, after the contractor has been given a three days
notice in writing, such measurements may be taken in his absence and shall deemed
be accepted the contractor.
Payment will be made to the contractor of different stages of work done and approved
as specified in Technical Specifications.
The contractor shall submit his bills for the work done to the Engineer-in-
charge's in the printed form. The Engineer-in-charge's shall thereafter verify the
claims in the bill, and arrange for admissible payment as far as possible within ten days
of the presentation of the bill, after deducting there from all the amounts as per terms of
the contract. The full rate shall be valid only when the item concerned is accepted as
having been completed fully in accordance with the sanctioned specifications regarding
details of release of part payments. On completion of the entire work, the contractor will
submit his final bill. Payment of this bill shall not be considered conclusive evidence as
to the sufficiency of any work or materials or
correctness of measurements to which it relates, nor shall it relieve the consultant from
the liabilities arising from any defects.
All interim payments shall be treated as advance payments. All payments will be made
19.00 RELEASE OF CLAIMS:-
After completion of work and prior to final payment, the contractor shall furnish to the
Engineer-in-charge a release of claims against the Govt. arising out of the contract,
other than claims specifically identified, evaluated and accepted from the operation of
the release by the contractor.
20.00 RECOVERIES:-
Any recovery ordered by the Government shall be recovered from any bill of money
retained from this contract and shall be deemed to the arrears of land Revenue and the
Govt. may, without prejudice to any other rights and remedies of the Govt. recover the
same from the contractor as arrears of revenue.
21.00 OBSERVANCE OF LAWS, LOCAL REGULATIONS & ATTACHMENTS:-
The contractor shall confirm to all laws of the land and the regulations and bye laws of
any local authority. The contractor shall protect and indemnity govt. against all claims or
liabilities arising from or based on the violation of such laws, ordinances, regulations,
bye laws, decrees or attachments by him or his employees.
22.00 CONTRACTOR’S DEATH BECOMING INSOLVENT, INSANE OR IMPRISONED:
In the event of the death or insanity of the contractor the contract may be terminated by
notice in writing, pasted at the site and advertised in one issue or a local newspaper. All
acceptable works shall thereafter be paid at appropriate rates, after recovering all dues
of contractor to Govt. to the persons entitled to received and give a discharge for such
In the contractor is a imprisoned, becomes insolvent, has a receiving order made
against him, or carries on business under a receiver for the benefit of the creditors or
any of them, or, if it is a partnership firm it becomes dissolved, or if it is corporation it
goes into liquidation or commences to be wound up (not being a voluntary winding up
for the purpose only a amalgamation or reconstruction) the Govt. will be at liberty.
(a) To give such liquidator, receiver or other person of whom the contract may become
vested the option of providing an appropriate guarantee for the performance of such
(b) To terminate the contract forthwith by notice in writing to the contractor the liquidator,
the receiver, or person in whom the contract may become vested, and take further
actions as provided in the clause "Default by contractor' if this termination is in order
23.00 FOR CLOSURE OF WORKS BY GOVERNMENT:-
If at any time after award of the contract, the Govt. for any reason what so ever, does
not require the whole or any part of the works to be carried out, the Engineer-in-charge
shall give 10 days’ notice in writing to that effect to the contractor. The contractor shall
not have claim to any compensation whatsoever, on account of any profit or advantage
which he might have derived from the execution of such works.
There upon, the contractor shall be paid at contract rates for works executed and, in
reasonable amount as certified by the Engineer-in-charge, for the items here under
mentioned, which could not be fully utilized on the work because of the foreclosure.
(a) Preliminary site work such as temporary road, temporary labour huts, staff quarters and
the site offices, storage accommodation water storage tank, etc. which was necessary
for execution on the works under the contract.
(b) Contractor's material either brought to site or for which the contractor is legally bound to
accept delivery from the suppliers, provided however, the quantities or such materials
are not in excess or reasonable requirements of works. The decision of the Executive
Engineer for works will be final and conclusive. If the contractor wishes to take away
some of the materials the Executive Engineer may permit him to do so.
(c) Mobilization and repatriation of contractor's site staff and imported labour. The
contractor shall if required by the Executive Engineer, furnish him books of account and
other relevant documents as may be necessary to enable him to certify the reasonable
amount payable under this condition.
24.00 EXTENSION OF TIME:-
Time shall be considered as the essence of the contract. If however, the failure of the
contractor to complete the work as per the stipulated dates referred to the above arises
from delays on the parts of the Govt. in supplying the basic data, such as B.M. Values,
ruling level, Contractor Maps as a Counter-part assistance provided in the tender,
Design mix/Nominal mix, handing over clear site etc. that it has undertaken to supply
under the contract, with a time frame set or from delays in handing over sites, or from
increase in the quantity of work to be done under the contract, or change in scope of
work or Force Majure, an appropriate extension of time will be given. The contractor
shall request such extension within one months of the cause of such delay and in any
case before expiry of the contract period.
25.00 SETTLEMENT OF DISPUTES:-
If the contractor considers any work demanded of him to be outside the requirements of
the contract, or considers any drawings, record or ruling of the Engineer-in-charge of
any matter in connection with or arising out of the contract or the carrying out of work,
to be unacceptable he shall promptly ask the Executive Engineer, the Executive
Engineer shall give his written instructions or decision within a period of thirty days of
Upon receipt of the written instructions or decision, the contractor shall promptly
proceed without delay to comply with such instructions or decision.
If the Executive Engineer fails to give his instructions or decision in writing within a
period of thirty days after being requested, or if the contractor is dissatisfied with the
instruction or decision of the Executive Engineer, the contractor, may within thirty days
after receiving the instructions or decision, appeal to the Superintending Engineer, who
will afford an opportunity to the contractor to be heard and to offer evidence in support
of his appeal. The Superintending Engineer will give decision within a period if sixty
days after the Contractor has given the said evidence in support of his appeal. The
decision of the Superintending Engineer shall be final and binding to the contractor.
26.00 BASE LINES AND GRADES:-
A. Permanent base line (and cross lines) shall be established at sufficiently close intervals
with bench marks at all corner points to serve as “ Reference Grid ”. The contractor
shall provide at his expense, all templates, pillars, stacks, equipment, materials and
labour for establishing the grid lines and pillars & preserve during the whole period of
construction. These shall be laid out with prior approval of the Engineer-in- charge. No
base line or bench mark or reference mark shall be used as reference line, or bench
mark or level for the work without prior approval of the engineer. The contractor shall
maintain certified copies of such approved reference lines, marks and levels and shall
not remove any of them without prior approval of the engineer.
B. The contractor shall further lay out the work from these reference base lines in
consultation with the engineer and shall established level connection therewith
notwithstanding the fact that the same might have been checked by the Engineer's staff.
C. The contractor shall be responsible for proper execution of the work to such lines and
grades as may be specified on the drawings or established or indicated by the
27.00 DAMAGE BY FLOODS OR ACCIDENT:-
The contractor shall take full precautions against any damage to the work by flood or
from accidents. No compensation shall be allowed to the contractor for his plants or
materials lost or damaged by floods, unanticipated or otherwise, or from such other
cause, during monsoon or unexpected rains, and he shall be liable to make good any
damage to the plant, machinery or materials of Department hired by him and lost or
damaged by flood or from any other cause while in his possession for use on works.
28.00 REFERENCE MARKS AND BENCH MARKS:-
The basic center line, reference points and bench marks will be fixed by the
Department However the material and labour required for this shall be supplied by the
contractor. The contractor shall establish at his cost, at suitable points, additional
reference lines and bench marks as may be necessary. The contractor shall remain
responsible for the sufficiency and accuracy of all these bench marks and reference
marks. He should take precautions to see that the reference lines or points and bench
marks fixed by the Department are not disturbed by his work and shall make good the
damage at his cost.
29.00 OTHER TAXES:-
The rates to be quoted by the tenderer shall be inclusive of all taxes, excise etc. and no
claim whatsoever in these connections shall be entertained. GST Applicable as per
S.B.D. Section-1(C) Preparation of Bids Clause-13.3
30.00 INCOME TAX, SURCHARGE, EDUCATION TAX:-
Government will recovered central taxes like I.T., S.C. & E.C. as per the Income Tax
Act-1961 and amended from time to time under works contracts from each R.A. Bills/
31.00 LABOURS WELFARE CESS:-
As per prevailing rules under labour Act, labour welfare cess shall be recovered from
R.A. Bills/ Final bill.
32.00 CONTRACT DOCUMENTS AND MATTER TO BE TREATED AS CONFIDENTIAL:-
All documents, correspondence and other matter concerning the contract shall be
considered as confidential and restricted in nature by the contractor and he shall not
divulge or allow access to them by any unauthorized person.
33.00 WORK ORDER BOOK:-
A work order book as prescribed by the Government will be required on the work and
the contractor shall sign the orders in token of acceptance as given by the Engineer-in-
charge or his representative. He shall carry out the orders in true spirit and as required
for the correct performance of the contract. Work order book is the property of the
Department and shall remain in the custody of the Department supervisory staff on
duty. The compliance shall be carried out promptly and reported to the Engineer-in-
charge in good time by the contractor so that the work can be checked. If the contractor
fails to take note of orders or instructions issued in the work order book or tries to avoid
the same, the Engineer-in-charge will have power to take suitable recourse. Any such
action of the engineer for the non-compliance on the part of the contractor shall be
binding upon him.
Signature of Contractor Executive Engineer
Water Resources Investigation Division
STANDARD GENERAL TECHNICAL SPECIFICATIONS
: STANDARD GENERAL TECHNICAL SPECIFICATIONS:
1.1 All the items occurring in the work and as found necessary during actual execution shall
be carried out in workman like manner as per specifications below and as per written
orders of the Engineer-in-charge.
1.2 A work order book as prescribed by the Engineer-in-charge shall be maintained on the
site of work and the contractor shall carryout field compliance properly.
1.3 The contractor shall engage authorized representative who shall be responsible and
competent for managing the work. He shall take orders from the Engineer-in-charge
and shall be responsible for carrying out the same.
1.4 Quantities specified in the tender may vary at the time of actual execution and the
contractor shall have not to claim for compensation on account of such variation.
1.5 No trees shall be cut without permission of Engineer-in-charge.
1.6 Diversion for roads if necessary shall be provided and maintained during the currency
of the contract without any extra cost to the Department.
1.7 The work shall be executed strictly in accordance with plans & specifications. Only the
best materials and sound construction shall be executed in a through workman like
1.8 The drawing prepared and trial pits taken are for general guidance and indication and
changes either minor or major are likely to take place. No claim for extra payment shall
be made by the contractor for such changes.
1.9 The quantities in the schedule are only estimated quantities and during execution they
may increase or decrease. Any claim put forward for this variation in quantity shall not
be entertained.
1.10 The rejected materials shall be removed from the site within 24 hours. If they are not
removed within this period, the same will be removed at the contractor's risk and cost
by the Department.
1.11 The work is an important work and this fact shall be constantly borne in mind by the
contractors and his workers. Works not specified above shall be carried out according
to P.W.D. Hand Book or according to instructions of the Executive Engineer.
1.12 The work requires constant attention for line, levels and workmanship and hence the
contractor shall have to keep the experienced technical staff on the work. The
contractor has to supply the necessary materials and labour for the line and levels work
at his own cost.
1.13 The contractor unless otherwise specified and providing in the contract shall pay all
duties, tolls, quarry fees, royalties and taxes on all materials and articles they may use.
The rate quoted by the contractor shall be considered inclusive of all such duties, fees,
royalties, taxes etc.
1.14 In the specification “as directed / approved” shall be taken to mean “as directed /
approved “by the Engineer - in - Charge.
1.15 Wherever a reference to any India Standard appear in the specifications, it shall be
taken to mean as reference to the latest edition of the same in force on date of
1.16 In “Mode of Measurement " in the specifications, wherever a dispute arises in the
absence of specification of a particular point or aspect, the provision on these particular
points or aspect in the relevant Indian Standard shall be referred to.
1.17 All measurement and computations, unless otherwise specified, shall be carried out
nearest to the following limits:-
(1) Length, Width and Depth (Height) 0.01 Meter.
(2) Areas 0.01 Sq. Mt.
(3) Cubic Contents (Except Wood) 0.01 Cumt.
(4) Cubic Contents (Wood Work) 0.001 Cumt.
In recording dimensions of work in measurement book the sequence of length, width
and height (depth) or thickness shall be followed.
1.18 The distance with constitutes lead shall be determined along the shortest practical route
and not necessarily the route actually taken. The decision of the Engineer - in - Charge
in this regard shall be taken as final.
1.19 Where no lead is specified, it shall mean “all leads ".
1.20 Lift shall be measured as per current practice for relevant item under direction or
decision by Engineer-in-charge.
1.21 Definite particulars covered in the items of work, through not mentioned or included in
it’s specifications, shall be deemed to be included therein.
1.22 Reference to specifications of materials as made in the detailed specification of the
items of work is in the form of a designation containing the number of the specification
of the material and prefix "M" i.e. “M-1 “etc.
1.23 Approval to the samples of various materials given by the Engineer-in-charge shall not
absolve the contractor from the responsibility of replacing defective material brought on
site or materials used in the work found defective at a later date. The contractor shall
have no claim to any payment or compensation whatsoever on account of any such
materials being rejected by the Engineer - in - Charge.
1.24 The contract rate of the item of work shall be for the work completed in all respects.
1.25 No collections of materials shall be made before it is got approved from the Engineer -
1.26 Collection of approved materials shall be done at site of work in a systematic manner.
Materials shall be stored in such a manner as to prevent damage, deterioration or
intrusion of foreign matter and to ensure the preservation of their quality and fitness for
1.27 Materials if and when rejected by the Engineer-in-charge, shall be immediately
removed from the site of work.
1.28 No materials shall be stored prior to, during and after execution of a structure in such a
way as to cause or lead to damage or overloading of various components of the
1.29 All works shall be carried out in a workman like manner as per the best technique for
the particular item.
1.30 All tools, templates, machinery and equipment for correct execution of the work as well
as for check line, levels, alignment of the works during execution shall be kept in
sufficient number and in good working condition on the site of work.
1.31 The contractors shall be responsible for observing the rules and regulations imposed
under the “Mine and Minerals Act “and such other laws and rules prescribed by Govt.
from time to time.
1.32 All necessary safety measures and precaution (including these laid down in the various
relevant Indian Standards) shall be taken to ensure the safety of men / women,
materials and machinery on the works and also of the work itself.
1.33 Approval to any of the executed item for the work does not in any way relieved the
contractor of his responsibility for the correctness, soundness, strength of the structure
as per the drawings and the specifications.
Signature of Contractor Executive Engineer
Water Resources Investigation Division
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
01 Notice Inviting Tender NIT Mevasa.pdf
02 SBD_Mevasa survey 01-103.pdf
03 Itemwise Specification 126-128 Mevasa.pdf
04 Price Bid Volume Part-III 104-125 Mevasa.pdf
05 Bill of Quantity 129-131 Mevasa.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .