Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.0 CrAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹42.9 Cr+₹7.9 Cr (22.7%)Admitted-Finance NH 44 OPPOSITE KASHMIR GARDENS NUCON SWITCHGEARS PRIVATE LIMITED DORAHA DORAHA LUDHIANA PUNJAB 141421 | LUDHIANA | PUNJAB | 141421 | L2 | Admitted-Finance | |
| 3 | Not Admitted-Finance 4222 LAXMI KUNJ 1ST FLOOR 1 ANSARI ROAD DARYA GANJ NEW DELHI 110002 | NEW DELHI | CENTRAL DELHI | DELHI | 110002 | - | Not Admitted-Finance Not qualified for AOC | |
| 4 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC | |
| 5 | Not Admitted-Finance | - | Not Admitted-Finance Not qualified for AOC |
| Sl No | Description | Qty | Unit | Nucon Switchgears Private Limited L2 | Grun Umwelt Energy Pvt L1 |
|---|---|---|---|---|---|
| 1.00 | Turnkey package for Design, Engineering, Manufacture, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFWF (oil forced water forced)type cooling system, to be connected in Delta–Star configuration by 11KV single core new power cables& with existing 3x35MW, 11KV Generator Bus, alongwith complete dismantling of old existing 14MVA Transformers in phased manner at LJHP Power House , Baramulla, JKPDC.SITC of automatic high velocity water spray system as per relevant IS for firefighting shall also be included in the scope of work inclusive of routine type and impulse test as detailed in SBD. | 10 | No. | 4,18,50,000 ₹41,85,00,000 | 3,39,00,029 ₹33,90,00,290 Lowest |
| 2.00 | Mandatory Spares/accessories for 10 No Transformers HV Bushes | 3 | No. | 1,20,000 ₹3,60,000 | 1,10,000 ₹3,30,000 Lowest |
| 3.00 | LV Bushes | 10 | No. | 40,000 ₹4,00,000 Lowest | 40,000 ₹4,00,000 Lowest |
| 4.00 | Neutral Bushes | 10 | No. | 40,000 ₹4,00,000 Lowest | 40,000 ₹4,00,000 Lowest |
| 5.00 | OTI and WTI | 10 | each No | 60,000 ₹6,00,000 Lowest | 65,000 ₹6,50,000 |
| 6.00 | Oil pump &motor assembly complete | 10 | No. | 1,50,000 ₹15,00,000 Lowest | 1,60,000 ₹16,00,000 |
| 7.00 | Heat exchangers/radiators | 10 | No. | 1,50,000 ₹15,00,000 | 1,35,000 ₹13,50,000 Lowest |
| 8.00 | Oil valves,/shut off valves of types | 10 | No. | 45,000 ₹4,50,000 Lowest | 50,000 ₹5,00,000 |
| 9.00 | Oil flow indicators | 10 | No. | 35,000 ₹3,50,000 Lowest | 40,000 ₹4,00,000 |
| 10.00 | Aux panel contactors, contactor coils & starters | 10 | each No | 1,25,000 ₹12,50,000 Lowest | 1,30,000 ₹13,00,000 |
Tender Value
₹40.3 Cr
EMD Value
₹80.5 L
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Executive Engineer
Generation Division LJHP Gantamulla Baramulla
Turnkey package for Design Engineering Supply Installation Testing and Commissioning of Ten 10 No 15MVA 11 by 132KV Single Phase Transformers with OFWF type Cooling system to be connected in Delta Star (YNd11) configuration by 11KV single Co
2026_SPDC_319116_1
E-NIT No 30 of 2026-27 dated 01.08.2026
Open Tender
Electrical Works
Item Rate
540 days
LJHP POWER HOUSE
Please refer Tender documents.
6 documents required · 6 mandatory
₹10,000
Yes
Chief Pay and Accounts Officer
₹80.5 L
Yes
Executive Engineer
15 Oct 2026
3 Aug 2026
1 Sept 2026
6 Aug 2026
28 Aug 2026
18 Aug 2026
6 Aug 2026 - 12 Aug 2026
13 Aug 2026
180 days
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Turnkey package for Design, Engineering, Manufacture, Supply, Installation, Testing and Commissioning of (Ten) 10 No. 15MVA, 11/132KV, Single Phase, Generator Power Transformers with OFWF (oil forced water forced)type cooling system, to be connected in Delta–Star configuration by 11KV single core new power cables& with existing 3x35MW, 11KV Generator Bus, alongwith complete dismantling of old existing 14MVA Transformers in phased manner at LJHP Power House , Baramulla, JKPDC.SITC of automatic high velocity water spray system as per relevant IS for firefighting shall also be included in the scope of work inclusive of routine type and impulse test as detailed in SBD. | - | No. | - | - |
| 2 | Mandatory Spares/accessories for 10 No Transformers HV Bushes | - | No. | - | - |
| 3 | LV Bushes | - | No. | - | - |
| 4 | Neutral Bushes | - | No. | - | - |
| 5 | OTI and WTI | - | each No | - | - |
| 6 | Oil pump &motor assembly complete | - | No. | - | - |
| 7 | Heat exchangers/radiators | - | No. | - | - |
| 8 | Oil valves,/shut off valves of types | - | No. | - | - |
| 9 | Oil flow indicators | - | No. | - | - |
| 10 | Aux panel contactors, contactor coils & starters | - | each No | - | - |
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
cancelled_1.pdf
pdf • 0.22 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 1.40 MB
ModifiedTenderdocumentof15MVALJHP.pdf
Tender Documents • 1.90 MB
VolIITECHNICALSPECIFICATIONS.pdf
Other Document • 0.69 MB
BOQ_1055635.xls
BOQ • 0.33 MB
Corrigendum5.pdf
PDF • 0.63 MB
RevisedCorrigendumTransformers.pdf
PDF • 0.40 MB
corrigendum.pdf
PDF • 0.71 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart shows the information on this page on a best-effort basis and does not guarantee that it is accurate, complete or current. Check it against the buyer's official notice and documents before you act on it; the official record prevails. TenderKart is not liable for any loss or claim arising from the use of this information. If you notice any error or omission, please let us know at .