Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 34 SANJAY BUILDING NO 6 ANDHERI KURLA ROAD ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance 13 THAKKAR PLOT DEEPAK KUNJ PORBANDAR 360575 | PORBANDAR | GUJARAT | 360575 | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
11 Sept 2021, 10:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
ASD
NAVAL DOCKYARD VISAKHAPATNAM 530014
REMOVAL OF ELLORA MK I SYSTEM AND INSTALLATION OF ELLORA MK II SYSTEM IN SHIP
2021_NAVY_467882_1
COM/OFF/WEA/20-21/450
Open Tender
Marine Services
Turn-key
NAVAL DOCKYARD VISAKHAPATNAM
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
Exempted
NAVAL DOCKYARD VISAKHAPATNAM
5 Nov 2021
13 Aug 2021
13 Sept 2021
13 Aug 2021
11 Sept 2021
25 Aug 2021
13 Aug 2021 - 11 Sept 2021
20 Aug 2021
180 days
Removal of Ellora MK I and Installation of Ellora MK II.Removal of ESM Rack, ECM Rack of Ellora MK I and transporting of survey yard) Transport to be catered by vendor.
Removal of Ellora MK I and Installation of Ellora MK II.Removal of Receiver Rack, AHU Transporting to survey yard and Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Removal of Two MBTU's. Transporting to survey yard and Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Removal of Display Device and RFSU. Transporting to Survey yard and transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Removal of Two MMTU's. Transporting to survey yard and Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Removal of Antenna AHU 1 and AHU 2 from main mast Transporting to survey yard and Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Degutting of existing cable 3500 mts. Transporting to survey yard and Transport to be catered by vendor.
Removal of Ellora MK I and Installation of Ellora MK II.Manufacturing fitment and installation of base plate for AHU 1 of Ellora MK II: Mast / Elevated deck with clear LOS in place of existing antenna. Transporting to survey yard and Transport to be catered by vendor.
Removal of Ellora MK I and Installation of Ellora MK II.Manufacturing of base plce for ESM processor rack, fitment and installation of ESM processor rack. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Manufacturing of base plate for display device. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Fitment and installation of display device. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Manufacturing of base plate for ECM Rack. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Fitment and installation of ESM. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Manufacturing of base plate for MBTU. Fitment and installation of MBTU. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.fitment and installation of MBTU. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Manufacturing of base plate for MMTU. Fitment and installation of MMTU. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.fitment and installation of MMTU. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Manufacturing of base plate for AHU PSU, fitment and installation of AHU PSU. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.fitment and installation of AHU PSU. Transporting from shopfloor to onboard location. Transport to be catered by vendor..
Removal of Ellora MK I and Installation of Ellora MK II.Laying of new cable (laying dressing and clamping) 8.6 (sqmm) 3 core 4000 mtrs per Radar..
Removal of Ellora MK I and Installation of Ellora MK II.laying provisioning and fitment of cable conduit 60 sqmm mtrs per radar.
Removal of Ellora MK I and Installation of Ellora MK II.Renewal of cable of cable trays 60 mm (Provisining, Installation and removalk of old cable tray including hot work.
Removal of Ellora MK I and Installation of Ellora MK II.Manufacturing and fitment of cable tallies 6x3x0.5 mm - Aluminums (punched).
Removal of Ellora MK I and Installation of Ellora MK II.Termination of old/unused cables by terminating the shield circumferentially and grounding the crore at both ends..
Removal of Ellora MK I and Installation of Ellora MK II.Connectorisation of over 180 connectors and glands for powering up the system with associted cable booting for the same.
Removal of Ellora MK I and Installation of Ellora MK II.Proper earthing/bonding of all units as per NEC-STD 1101.
Removal of Ellora MK I and Installation of Ellora MK II.Manufacturing and fitment of clamps for mounting of the channles trays and bulkhead mounted devices, as required..
Removal of Ellora MK I and Installation of Ellora MK II.Provisioning of all tools, equipment, slings, vehicles or any other item required for undertaking the above mentioned above..
Removal of Ellora MK I and Installation of Ellora MK II.Resting/Blanking of the existing ventilation trunking feeding the cabinets of ELLORA MK I (Subject to inspection on site).
Removal of Ellora MK I and Installation of Ellora MK II.Resting of the existing fight fixtures and manufacturing of additional cable trays in the HF Compartment and OPS room during installation and associated regutting and hot work (suject to inspected on site).
Removal of Ellora MK I and Installation of Ellora MK II.Manufacturing of 06 decks tubes and 09 bulkhead glands of material SS and fitment of the same. The glands are to be repacked post cable laying and proven during air pressure test (APT) of the ship.
Removal of Ellora MK I and Installation of Ellora MK II.The glands are to be repacked post cable laying and proven during air pressure test (APT) of the ship..
OM ENGINEERING
SAGAR SHIP REPAIRERS AND MARINE SERVICES
avisan engineering enterprises
POSITIVE CONTROLS
H and H Precision Private Limited
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .