Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
23 Mar 2022, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
Hindustan Shipyard Limited Gandhigram SR Complex Visakhapatnam 530 005
Instrumentation works of Main Engine and Auxiliary Engine on MV Skipper II
2022_HSL_89374_1
20 / 20015 / Instrumentation / 237 / 2021-22
Open Tender
Miscellaneous Services
Service
45 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
28 Mar 2022
14 Mar 2022
23 Mar 2022
14 Mar 2022
23 Mar 2022
14 Mar 2022
120 days
Amount
Main engine instrumentation safety panels in engine room and bridge to be serviced by replacing with indications and internal wiring required in the panel along with strengthening of the panel board by fabricating new foundation to adherent main engine vibration . Complete wiring to be made by proper securing by arranging proper securing clamps. Complete Engine safeties to be checked along with respective sensors and to replace the defective sensors.In addition to the above One set of safety controls, indication lights to be supplied to the ship staff for emergency use Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
Main engine scavenging blower to be serviced.Driven belts to be renewed.( 12 No's belts) Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
Main engine analogue gauge parameters are to be calibrated and defective guages/meters to be renewed. Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
lube oil pressure gauge
fresh water pressure gauge
Hydraulic oil pressure gauge
Scavenging blower air pressure gauge
Main engine tachometer to be installed and proved
priming pump gauges to be renewed
Main engine stand by lub oil pump and gear oil pump auto on/off control system to be made operational. Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
All the bilge alarm floats to be serviced and proved along with necessary cabling including Supply 5 no's floats for emergency use. Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
Propeller pitch angle potentiometer to be repair/renewed and proved for satisfactory operation. Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
Auxiliary Engines: Complete material required for completion of the following jobs should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
Both auxiliary engines safety control panel board instrumentation system to be surveyed, serviced and damaged safety controls to be renewed along with new cabling.
Both auxiliary engines digital RPM indicator with proximity switch not working same to be replaced with marine quality type.
Both auxiliary engines alarm panel board foundation to be fabricated for strengthening.
safety panel board wirings to be properly secured and any additional cabling required from panel board to the individual instruments to be renewed and the same to be secured properly.
Instruments on the Auxiliary engine panel board analog with parameters are to be calibrated and required are to be repair/renewed.
Both auxiliary engines stop solenoid system to be renewed and proved.
Both auxiliary governor control units to be serviced and one number spare to be renewed.
Fresh Water/Sea Water Hydrophore tanks pressure cut off switches are to be renewed and the system to be proved and Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
The following panel board gauges are to be calibrated if required it may renewed. Inside panel board to be cleaned with pressure air.Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
(a) Frequency meter
(b) Amp meter
(c) Volt meter
(d) KW meter
Intercom system master unit in wheel house is malfunctioning and In engine room intercom receiver unit is Damaged and it’s headphone is not working. The same to be renewed and Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
Wheel house control panel gauges to be calibrated and it’s hoses to be flushed.Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
Both air compressor running hour meters and decompression valves to be renewed and commissioned, both compressor to be renewed with secured copper pipe lines.
Wheel house electrical steering gear existing control unit contact points has become broken worn out and obsolete and the same has to be renewed with suitable new one and in addition contractor has to supply the new control unit.Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory operational trials to be shown to HSL/shipstaff.
steering gear electrical solenoid unit to be renewed and in addition one number full set supplied to ship for emergency use ( make :Parker, HCD made in Germany D-kaaist model no : D1vw2CNJP70. 24Hz, 1.2A max PAB=350bar, max. T=140 bar) (Contractor to supply the spares units ) Complete material required for completion of the job should be supplied by the contractor.After completion of repairs satisfactory trials to be shown to HSL/shipstaff.
AKSHAY CONTROLS AND SYSTEMS PVT. LTD.
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .