Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹7.8 CrAccepted-Finance | ₹7.8 Cr | 1 | Accepted-Finance Successful Bidder |
| 2 | 2₹14.8 CrRejected-Finance 9 FLOOR INFINITY TOWER C DLF CYBER CITY PHASE LL GURGAON HARYANA 122002 LETTER OF INTENT | ₹14.8 Cr | 2 | Rejected-Finance Second |
| 3 | 3₹10.4 CrRejected-Finance BENGALURU BANGALORE KARNATAKA 560005 INDIA UDYAM KR 03 0062820 | BENGALURU URBAN | KARNATAKA | 560005 | ₹10.4 Cr | 3 | Rejected-Finance Third |
| 4 | Rejected-Technical 11TH FLOOR IFCI TOWER 61 NEHRU PLACE NEW DELHI 110019 INDIA | NEW DELHI | SOUTH EAST DELHI | DELHI | 110019 | - | - | Rejected-Technical Not Qualified in Technical Evaluation |
| 5 | Rejected-Technical 1ST 5TH FLOOR INDUSTRY HOUSE 45 FAIR FIELD LAYOUT RACE COURSE ROAD BENGALURU 560001 | BENGALURU URBAN | KARNATAKA | 560001 | - | - | Rejected-Technical Not Qualified in Technical Evaluation |
| Sl No | Description | Qty | Unit | AECOM INDIA PRIVATE LIMITED | Jacobs Solutions India Pv t. Ltd. | MEINHARDT EPCM INDIA PRIVATE LIMITED |
|---|---|---|---|---|---|---|
| 1.00 | Preparation of Master Plan for Cochin International Airport with a plan period of 25 years, with detailing as listed below:
Comprehensive master plan, duly strategised based on Traffic forecast and including
a. Second Runway and Taxiways
b. Associated airside infrastructure
c. Passenger Terminal and Cargo complex
d. Multimodal connectivity at Landside
e. Optimum land requirement for future expansion
Task 1:Analysis of Existing Situation
Task 2:Aviation Demand Forecast
Task 3:Airport Re-Development Strategy
Task 4:Alternatives Development Option and Evaluation
Task 5:Airport Zoning, Layout, and Land Use Plan
Task 6:Environmental & Social Impact Assessment (EIA/SIA) Guidance
Task 7: Land Identification
Task 8:Final Option and Phasing Plan
Task 9: Preparation of Final Master Plan Report | 1 | Ls | 12,55,95,128 ₹14.8 Cr | 6,64,40,200 ₹7.8 Cr | 8,78,00,000 ₹10.4 Cr |
Updated dates
Tender Value
Refer Docs
EMD Value
₹10 L
Closing Date
5 Mar 2026, 3:00 pmClosed
Managing Director
Cochin International Airport Kochi Airport P.O. Ernakulam - 683111 Kerala India
The scope of consultancy services covers the preparation of Master Plan for Cochin International Airport with a plan period of 25 years
2025_CIAL_824569_1
CIAL/OPS/AMP/101
Open Tender
Consultancy
Cochin International Airport
As per the Tender document
16 documents required · 16 mandatory
₹5,900
₹10 L
Cochin Airport
6 May 2026
30 Dec 2025
6 Mar 2026
31 Dec 2025
5 Mar 2026
16 Jan 2026
31 Dec 2025 - 13 Jan 2026
15 Jan 2026
Preparation of Master Plan for Cochin International Airport with a plan period of 25 years, with detailing as listed below: Comprehensive master plan, duly strategised based on Traffic forecast and including a. Second Runway and Taxiways b. Associated airside infrastructure c. Passenger Terminal and Cargo complex d. Multimodal connectivity at Landside e. Optimum land requirement for future expansion Task 1:Analysis of Existing Situation Task 2:Aviation Demand Forecast Task 3:Airport Re-Development Strategy Task 4:Alternatives Development Option and Evaluation Task 5:Airport Zoning, Layout, and Land Use Plan Task 6:Environmental & Social Impact Assessment (EIA/SIA) Guidance Task 7: Land Identification Task 8:Final Option and Phasing Plan Task 9: Preparation of Final Master Plan Report
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.57 MB
Tender_Document.pdf
Tender Documents • 1.23 MB
BOQ_1382457.xls
BOQ • 0.34 MB
Download all tender documents and submit your bid