| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹47.0 CrAdmitted-Finance 1101 A XITH FLOOR TOWER A II ANSAL CORPORATE PARK PLOT NO 7A 1 SECTOR 142 NOIDA 201 301 UTTAR PRADESH | NOIDA | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | L1 | Admitted-Finance |
| Sl No | Description | Qty | Unit | SA Infrastructure Consutants Pvt. Ltd. L1 |
|---|---|---|---|---|
| 10.00Item Description | ||||
| 20.00 | Local Consultants
Remuneration for Local Professional Staff
(inclusive of per diem allowance) | 1 | Nos | 13,89,96,000 ₹13,89,96,000 Lowest |
| 30.00 | Support Staff (inclusive of per diem allowance) | 1 | Nos | 42,33,600 ₹42,33,600 Lowest |
| 40.00 | Transportation | 1 | Nos | 72,00,000 ₹72,00,000 Lowest |
| 50.00 | Duty Travel to Site | 1 | Nos | 12,00,000 ₹12,00,000 Lowest |
| 60.00 | Office Rent | 1 | Nos | 14,68,800 ₹14,68,800 Lowest |
| 70.00 | Office Supplies, Utilities and Communication | 1 | Nos | 21,60,000 ₹21,60,000 Lowest |
| 80.00 | Office Furniture and Equipment (Rental) | 1 | Nos | 21,00,000 ₹21,00,000 Lowest |
| 90.00 | Reports and Document Printing | 1 | Nos | 8,58,500 ₹8,58,500 Lowest |
| 100.00Surveys & Investigations | ||||
Tender Value
Refer Docs
Closing Date
14 Oct 2025, 5:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
CE BPSP
TRANSPORT BHAWAN, NEW DELHI-110001
Consultancy Services for preparation of Detailed Project Report for Construction of 4/6 laned High Speed Corridor/Expressway Bhavnagar Bharuch in the state of Gujarat
2025_MoRTH_873152_1
Pkg-4-RW/NH-37011/46/2025-BPSP
Open Tender
Consultancy
Lump-sum
720 days
Bhavnagar
Please refer Tender documents.
6 documents required · 6 mandatory
₹5,900
034415-PAO(NH)
Exempted
3 Feb 2026
13 Aug 2025
15 Oct 2025
13 Aug 2025
14 Oct 2025
26 Aug 2025
Amount
Item Description
Local Consultants Remuneration for Local Professional Staff (inclusive of per diem allowance)
Support Staff (inclusive of per diem allowance)
Transportation
Duty Travel to Site
Office Rent
Office Supplies, Utilities and Communication
Office Furniture and Equipment (Rental)
Reports and Document Printing
Surveys & Investigations
Topographical Survey
Investigations
Net work survey and GPR
Cost of supply and fixing boundary pillars
Land acquisition Team including support staff and logistics/transportation
Awareness Training and Technology Transfer
Sub Total for Local Consultants
Foreign Consultants
Remuneration for Expatriate Staff
Mobilization and Demobilization
Total Cost net of Tax:
Taxes & Duties
Income Tax (Expariate)
Other Taxes / Duties (if any) Specify clearly
Grand Total Excluding GST (for all 3 phases)
** Total Cost Net of Goods & Service Tax shall be considered for financial evaluation Note: No escalation will be payable during the services except where period of consultancy services is more than 18 months. In such cases, payment for any stage shall be modified (+/-) by following formula: Price adjustment (Rs.)=0.85*payment percentage for particular stage*contract price*L1/L0 where Lo and L1 are the average wage indices for the quarter before the quarter in which base month falls and for the quarter before the quarter in which date of supply falls; respectively. For example for a tender opening on March 17, 2016 (base date), Lo would be average wage index for the quarter of Oct-Dec 2015. Insurances shall not be allowed separately. These will be incidental to main items. Rates for all items shall be quoted in figures as well as in words.
Description of Work / Item(s)
Amount
A. Topographical Survey (Fixed Rate)
Topographic Survey including hire charges for equipment and supply of survey Teams comprising of project survey field staff etc. inclusive of cost of materials, labourer.
Detailed topographic surveys using mobile/ aerial LiDAR or better technology
Bathymetric, Oceanographic, hydrographic survey using state of art equipment at required intervals
Carry out Model Studies as per Supplement-II in accordance with clause 4.13.4.2 Hydraulic and Hydrological investigations para 6 of TOR.
Description of Work / Item(s)
Amount
Road and Bridge Inventory
FWD Test and Pavement Evaluation
Roughness Survey
Axle Load Survey
Material Survey and Investigation
Sub-grade Investigation
Traffic Survey
Socio-economic & Census Survey/ Studies
Land Acquisition Studies
Seismic Reflection test
Wind Tunnel Test
Any other investigations/surveys
Any other investigations/surveys 2
Sub Total
Note: Investigations/Survey mentioned at Sr. No, 1.10 & 1.11 shall be done with the prior approval of the Ministry.
Sub-Soil Investigation (Boring)* Rate (INR) Quantity Amount (INR) Amount (INR) in Words
a) Boring in all type of soils,Qty. in mtr. 1500m (for projects of length < 110 km) or 2000m (for projects of length > 110 km)
b)Boring in hard rock ,Qty. in mtr. 200 mtr. (for projects of length < 110 km) or 300m (for projects of length > 110 km)
Sub Total
Note: * Quantities of borings shall be taken from Financial Proposal Form No. V. For financial evaluation, these quantities and rates quoted by the consultant will be considered. However, Payment shall be made on the actual quantity of boring at rates quoted above by the Consultant, which may be substantially more or less than the estimated quantities.
Description of Work / Item(s)
Amount
Net work Survey of the existing Highways as a repository for civil work as per direction from Authority
GPR Survey for detection of under ground utilities
Description of Work / Item(s)
Amount
Procuring and Fixing boundary pillars and its installation , complete in all respect as per IRC:25,1967:Whereve the proposed alignment follows the exissting alignment, the boundary pillars shall be fixed at an interaval of 200m on either side of proposed right of way. Wherever there is a proposal of realignment of the existing Highway and/or construction of new bypass, consutant shall fix boundary pillars along the proposed alignment on the extreme boundary on either side of the project Highway at 50 m interval (in number)
Description of Work / Item(s)
Amount
A Land Acquisition Team including support staff :
Ex-Land revenue inspector/officer or equivalent
EX-kanoogo/Girdwar or equivalent
Ex-Patwari or equivalent
Typist
Total
Number of land acquisition teams (A)
Grand total (A)
B: Logistic for Land Acquisition Team :
computer including necessary peripherals
printers
Vehicles(Bolero or equivalent )with monthly running limit of 4000 km
Total
Number of logistics for land acquisition teams (B)
Grand Total (B)
Grand total for all Land Acquisition teams And Logistics (A) + (B)
Note: The Consultant shall provide one Land Acquisition Expert along with allied team and supporting logistic as envisaged in Clause 5.1 of TOR for each CALA for stretches proposed for DPR preparation. The number of team indicated in BOQ are tentative and subject to change as per the actual deployment of Land acquisition team for each CALA in consultation with the Employer.
Description of Work / Item(s)
Amount
Awareness Training in Foreign
Awareness Training in India
Note: Consultant shall arrange two weeks training on similar projects for five officers of project team in foreign countries (Europe, USA and Far East Asia) and one week trip in India of such projects separately as per Schedule of MoRTH. The costs incurred on this training for MoRTH Officials including air fare, boarding, lodging, local travel etc. will be borne by MoRTH. This training is aimed at gaining an insight into the international standards and practice followed in such projects and to apply such concepts to this project.
Description of Work / Item(s)
Amount
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Description of Work / Item(s)
Amount
International Airfares (Fixed costs)
Inland Travel in Home Country (Lump Sum)
Description Lump Sum RATE Name Amount
Airlines
Other Miscellaneous expenses ( like DA, internal travel expenses other incidentals)(fixed cost)
Description Lump Sum RATE Name Amount
Miscellaneous expenses
Sub Total for Mobilization and Demobilization
Description of Work / Item(s)
Amount
A. Professional Staff
Team Leader cum Senior Bridge Engineer
Senior Marine Structure Expert
Transportation Expert
Highway Engineer
Road Safety Expert
Material cum Geo-Technical Engineer
Ecology & Biodiversity Expert
Environmental Specialist
Senior Survey Engineer
Economist/Financial analyst
Procurement Expert & Contract Specialist
Land Acquisition Expert
Utility Expert
Sub Total
B: Sub Professional Staff (To be assessed by Consultant as per requirement of assignment and one sub-professional be a fresh graduate)
Staff 1
Staff 2
Staff 3
Staff 4
Staff 5
Staff 6
Staff 7
Staff 8
Staff 9
Staff 10
Sub Total
Description of Work / Item(s)
Amount
Office Manager
Typist
Office Boy
Night Watchman
Description of Work / Item(s)
Amount
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. A. For use of consultants
The vehicles provided by the Consultants shall include the cost for rental, drivers, operation, maintenance, repairs, insurance, etc. B. For use of Employer.(Maruti Ertiga (Latest Model) or Equivalent)
Description of Work / Item(s)
Amount
Duty Travel to Site
Description of Work / Item(s)
Amount
The office rent includes electricity and water charges, maintenance, cleaning, repairs, etc
Description of Work / Item(s)
Amount
Office Supplies Drafting
Supplies computer
Running Costs
Domestic and International Communication
Description of Work / Item(s)
Amount
Office Furniture and Equipment
Description of Work / Item(s)
Amount
Monthly Report (per month)
Inception Report, QAP & Preliminary alignment report
Environment and Social Impact Screening Report
Draft Feasibility Report
Final Feasibility Report & Subsoil Investigation report
Strip Plan with L.A. Reports
Draft LA and Clearances I Report & Draft TOR for EC, Draft GAD for ROB/RUB, Forest/wildlife diversion
Final LA and Clearances I Report
Draft Environmental Assessment report & RAP
Final Environmental Assessment report & RAP
Draft Detailed Design Report & Drawings etc.
Draft EMP
Draft Bidding Documents
Final Detailed Project Report with Bill of Quantities, Cost Estimates, Updated Drawings ,etc
Final EMP
Final Bidding Documents
Draft 3(a) ,3(A) and 3(D) notification for land acquisition ( 3 copies each)
LA & Clearances II Report
stage.html
html • 0.03 MB
techsummary_917888.pdf
BOQ Comparative Chart
xlsx
cancelled_1.pdf
pdf • 0.16 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.54 MB
BOQ_917888.xls
BOQ • 1.06 MB
RFP.pdf
Tender Documents • 5.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .