Loading…
Loading…
Tender ID
Tender Value
₹2.0 L
EMD Value
₹4,000
Closing Date
13 Apr 2026, 5:00 pmClosed
EE HP PWD Division Manali at Katrain
EE HP PWD Division Manali at Katrain
C/O Jeepable link road from Sari road to Darmot Nashni
2026_PWD_133108_1
13501-08 dated 31-03-2026
Open Tender
Civil Works
Percentage
30 days
Manali
C/O Jeepable link road from Sari road to Darmot Nashni
5 documents required · 5 mandatory
₹350
₹4,000
4 Apr 2026
4 Apr 2026
16 Apr 2026
4 Apr 2026
13 Apr 2026
4 Apr 2026
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Executive Engineer, HP,PWD. Division Manali at Katrain.
Tender Inviting Authority: C/O jeepable link road from Sari road to Darmot Nashni K.M 0/00 to 0/600 (SH:- Formation cutting in R.D 0/00 to 0/120
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Code / Make Quantity Units Estimated Rate with all Taxes including GST in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Excavation in soil in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of pick, jumper, blasting work both in soft and hard rock with chiseling/wedging out of rock( where blasting is not required ) and their intermediate classification of soil including, dewatering wherever required setting out to the required line grades, side slopes trimming bottom and level as shown on the drawings as directed by Engineer-in-charge at site according to technical specifications clause 1603.1,&1603.2 and sorting out useful/un useful materials and stacking the same in all leads and lifts and transportation of the un-useful materials for filling in road ways, embankments for grades improvements and levelling to the required grade and then disposing of surplus excvatedearth in acquired width of roads or on approved dumping sites through all modes of transportation including head load animal load or mechanical means along with its leveling fine dressing and all labour, machineries, materials, tools equipments and safety measures and incidentals necessary to complete the work by all means (if any required) Recovery for use ful stone of 52.21 Cum@ 300/-per cubic metre amounting to Rs15663.00/- only shall be done on prorata basis for the quantity of cutting in earth work effected. Any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all respect. BI01010001010000000000000515BI0100001114 Per cubic metre Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
Select, At Par, Excess (+), Less (-) IOCL
Tender Inviting Authority: Executive Engineer, HP,PWD. Division Manali at Katrain.
Tender Inviting Authority: C/O jeepable link road from Sari road to Darmot Nashni K.M 0/00 to 0/600 (SH:- Formation cutting in R.D 0/00 to 0/120
Name of the Bidder/ Bidding Firm / Company :
Sl. No. Item Code / Make Quantity Units Estimated Rate with all Taxes including GST in Rs. P Addition / Deduction Addition / Deduction Values Currency Convertion against each Item Quoted Currency in INR / Other Currency BASIC RATE In Figures To be entered by the Bidder Rs. P Excise Duty VAT Freight Charges ( Unloading & Stacking) Any Other Taxes/Duties/Levies Other Taxes 2 IIIrd Party i.e DGS&D / RITES etc Inspection Charges @0.34%+Service Tax Less for Cenvat Credit,if any respect of Supplies Under full Excise Duty Category
1 Excavation in soil in hilly area in all heights and depths in all kinds of soil including saturated soil comprising of pick, jumper, blasting work both in soft and hard rock with chiseling/wedging out of rock( where blasting is not required ) and their intermediate classification of soil including, dewatering wherever required setting out to the required line grades, side slopes trimming bottom and level as shown on the drawings as directed by Engineer-in-charge at site according to technical specifications clause 1603.1,&1603.2 and sorting out useful/un useful materials and stacking the same in all leads and lifts and transportation of the un-useful materials for filling in road ways, embankments for grades improvements and levelling to the required grade and then disposing of surplus excvatedearth in acquired width of roads or on approved dumping sites through all modes of transportation including head load animal load or mechanical means along with its leveling fine dressing and all labour, machineries, materials, tools equipments and safety measures and incidentals necessary to complete the work by all means (if any required) Recovery for use ful stone of 52.21 Cum@ 300/-per cubic metre amounting to Rs15663.00/- only shall be done on prorata basis for the quantity of cutting in earth work effected. Any loss to the public and private property during the course of execution shall be the absolute responsibility of the contractor, which shall have to be duly compensated by him in all respect. BI01010001010000000000000515BI0100001114 750.41 Per cubic metre Excess(+) Full Conversion INR
Total in Figures
Quoted Rate in Figures Select
Please Enable Macros to View BoQ information
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.31 MB
BOQ_196850.xls
BOQ • 0.25 MB
BOQSari198183.xls
Tender Documents • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .