Tender ID
Tender Value
₹53.3 Cr
EMD Value
₹28.1 L
Closing Date
17 Mar 2026, 3:00 pmClosed
Construction of ROB.422 with Spans : 1x42.0m+2X30.0m CG+9X24.0m RCC T- Beam including RE Walls in lieu of closure of manned level crossing at km 740/35- 37 between Urlam - Srikakulam stations in Waltair Division on East coast Railway.
DYCEGSUWATENGG2026008~ECOR
DYCEGSUWATENGG2026008
Open
Works - General
24 Months
Srikakulam, Andhra Pradesh
₹0
₹28.1 L
12 Feb 2026
12 Feb 2026
3 Mar 2026
A-Execution of Concrete works and its connected works for the ROB Above/
B-Execution of RCC Pile work , MS liner, Pile Load test etc. items
C-Execution of Structural Steel works and its connected works etc works
D-Supply , including straightening, cutting, bending, placing in position
E-Supply and using of Cement etc., Items covered under ECoR USSOR -
F-Execution of ROB approach works and its connected works etc, items
G-Execution of Non Schedule items (Non USSOR-2021 & CPWD-DSR-
H-Execution of miscellaneous unforeseen items of works not covered by
I-Execution of miscellaneous unforeseen items of works not covered by
superstructure, Service/Diversion of Roads etc ( Items Covered under USSOR-2021).
Item- 1 Execution of all items covered under Schedule-A.
S No. Item No Description of Item Unit Qty Rate Amount
ECOR-CONST-HQ-ENGG/ECOR
Earthwork in filling in embankment,
guide bunds, around buried type
abutments, bridge gaps, trolley
refuges, platforms etc. with
contractor's own earth conforming
to Soil Quality Class SQ1/SQ2/SQ3,
after preparation of foundations as
applicable, benching in existing
banks wherever required, spreading
in layers with motor grader, bringing
the moisture content to OMC,
mechanical compaction to specified
density and dressing of bank to final
profile as per RDSO Specifications:
RDSO/2020/GE: IRS-0004 with latest
correction slips. Note: 1) Foundation
preparation, Benching including
additional earthwork on account of
this, wherever required, shall be
paid extra under relevant schedule
item for benching. 2) Payment for
Earthwork under this item shall be
made based on the cross section
measurements calculated (i) with
original ground profile of existing
bank based on initial ground levels
before doing benching and (ii) final
profile of the bank worked out with
final levels as per prevailing
material by wet mixing of naturally
available suitable soil including
additional blending with naturally
available or manufactured material
as required to achieve specified
gradation, in designed proportion in
Pug mill or wet mix plant to have
uniform gradation including all
incidental transportation, laying
over finished formation in uniform
layer(s) with motor grader,
compaction with suitable vibratory
roller to specified density and
finishing to correct profile, complete
as per RDSO Specification No.
RDSO/2020/GE: IRS-0004 with latest
correction slips.
Providing portable fencing along
running track where work is to be
done in close vicinity of track,
maintaining during execution of
work and removing after completion
of the work as per direction of the
Engineer. Fencing shall consist of
self supporting steel angles of size
50mm x 50mm x 6mm, 1.5m long
provided with hooks etc. and
embedded in CC 1:2:4 block of size
0.23m x 0.23m x 0.23m placed at
c/c distance of 2m along track.
12mm dia rods in three horizontal
layers shall be tack welded with
angle posts. Note : Released
material will be property of the
contractor after completion of work.
Cost of cement required for CC
blocks shall be paid separately.
ECOR-CONST-HQ-ENGG/ECOR
retro-reflective tape in horizontal
direction, duly secured/tight with
vertical posts.
Earthwork in excavation by
mechanical means (Hydraulic
Excavator)/Manual Means for
foundations and floors of the
bridges, retaining walls etc.
including setting out, dressing of
sides, ramming of bottom, getting
out the excavated material, back
filling in layers with approved
material and consolidation of the
layers by ramming and watering
etc. including all lift, disposal of
surplus soil up to a lead of 300m, all
types of shoring and strutting with
all labour and material complete as
per drawing and technical
specification as directed by Engineer
in charge. Note: This item will be
used for excavation work in
connection with other miscellaneous
works also like side drains,
foundation for OHE masts and other
miscellaneous structures in
connection with Gauge Conversion,
Doubling, New lines.
Providing and laying in position Plain
cement concrete of specified
Nominal Mix f o r miscellaneous
works like side drains, foundation for
OHE masts and other miscellaneous
structures excluding the cost of
Cement, centering and shuttering -
All work up to plinth level :
(zone-III) : 3 graded stone aggregate
20 mm nominal size)
ECOR-CONST-HQ-ENGG/ECOR
7 022040 Providing and laying in position cum 3815.65 3777.08 14412015.30
machine batched, machine mixed
and machine vibrated Cement
Concrete of specified grade as per
approved Design Mix (mixed in
Mobile Concrete Batching/Mixing
Plant at site or RMC from approved
plants) using 20mm graded crushed
stone aggregate and coarse sand of
approved quality in RCC raft
foundation & Pile cap including
finishing, using Plasticiser in
approved proportions (as per
IS:9103), to modify workability
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. N o t e : 1.
Payment for cement, reinforcement
and shuttering shall be made extra
under relevant item. 2. Plasticiser
shall invariably be used in approved
proportion to increase workability
with minimum possible quantity of
cement for all grade of Design Mix
Concrete unless it is specifically
approved citing reasons for not
using plasticiser at the stage of Mix
Design and in that case deduction
shall be made as per relevant item.
Providing and laying in position
machine batched, machine mixed
and machine vibrated Cement
Concrete of specified grade as per
approved Design Mix (mixed in
Mobile Concrete Batching/Mixing
Plant at site or RMC from approved
plants) using 20mm graded crushed
stone aggregate and coarse sand of
approved quality for the following
Reinforced cement concrete
structural elements up to height of
9.0 m from foundation top level,
including finishing, using Plasticiser
in approved proportions (as per
IS:9103), to modify workability
without impairing strength and
durability complete as per
specifications and direction of the
Engineer in charge. N o t e : 1.
Payment for cement, reinforcement
and shuttering shall be made extra
under relevant item. 2. Plasticiser
shall invariably be used in approved
proportion to increase workability
with minimum possible quantity of
cement for all grade of Design Mix
Concrete unless it is specifically
approved citing reasons for not
using plasticiser at the stage of Mix
Design and in that case deduction
shall be made as per relevant item.
10 022053 Abutment cap, Pier Cap, Inspection cum 1415.55 3874.93 5485157.16
Platform & Pedestal over Pier cap,
Fender wall, Diaphragm wall etc.
11 022054 Approach slab at formation level, cum 2480.08 3809.70 9448360.78
Dirt wall/ ballast wall at formation
ECOR-CONST-HQ-ENGG/ECOR
part thereof in the height above 9.0
13 022060 Providing and laying Plain Cement cum 518.47 3513.33 1821556.21
Concrete 1:3:6 with graded stone
aggregate of 40mm nominal size, in
foundation and floors, retaining
walls of bridges including
mechanical mixing, vibrating,
pumping and bailing out water
where ever required with all
materials and labour complete but
excluding the cost of cement and
shuttering as per drawings and
technical specifications as directed
14 022070 Providing and fixing Weep Holes in Metre 1247.40 276.80 345280.32
Abutments, Wing walls and Return
walls etc., of new bridges with
110mm dia UPVC pipe Type A ISI
marked with all contractor's men,
material, transportation, all taxes as
per specifications and as directed by
Engineer-in-Charge.
15 022140 Pulse Echo Test (PET) for integrity Each 36.00 3186.07 114698.52
testing of piles with contractor's
men, materials and machines. The
rate includes cost of Inspection of
site, preparation of pile head and
any other unforeseen cost required
for the test, submission of reports in
triplicate as per satisfaction of the
Engineer in Charge.
Centering and shuttering including
strutting, propping etc. and removal
16 025031 All types of bridge sub-structures, Sqm 10601.00 665.63 7056343.63
e.g. pier, abutment, wing wall,
retaining wall, RCC box type
foundations, Abutment cap, Pier
Cap, Inspection Platform & Pedestal
over Pier cap, Fender wall,
Diaphragm wall etc. up to 5m above
17 025032 All types of bridge super-structures, Sqm 5189.05 868.54 4506897.49
e.g. slabs, I-girders, T-girders, Box
girders etc. up to 5m above ground
18 025033 Extra for additional height over item Sqm 9212.25 107.45 989856.26
no. 025031 & 025032 wherever
required with adequate bracing,
propping etc. over initial height of 5
metres for every additional height of
1 metre or part thereof.
PVC Pipes Class-I, capable for a
pressure of 2.5 kg/sqm in footpath
of ROB for laying cable with all
contractor's materials labour, tools,
plant, machinery, vehicles,
consumables, lead, lift etc.
complete as per specifications and
as directed by Engineer in-charge.
ECOR-CONST-HQ-ENGG/ECOR
20 041050 Providing and fixing railing used in Kg 2250.00 104.58 235305.00
rows for footpath or anti-crash
barrier railing with B class G.I. pipe
65/50 mm nominal dia including
cost of M.S. angle and channels in
vertical posts, welding / bolting,
priming painting with one coat
ready mix Zinc Chromate
conforming to IS:104 with DFT of 25-
30Microns, followed by one coat of
Zinc Chrome red oxide conforming
to IS:2074 with DFT of 25 Microns
with all material, labour, T&P as a
complete job. Note: Cost of painting
shall be paid extra under relevant
weighing not less than 35 kg each at
specified bridge locations.
22 052030 Supply and laying of quarry dust cum 39.00 775.77 30255.03
including consolidation, supply of all
materials, labour, lead, lift, tools,
plants, crossing of tracks as per
drawing and technical specification
as directed by the Engineer in
charge in case loose slush is
encountered at site of foundation
before casting the foundation or
laying the filtering media.
23 052040 Supply and laying of coarse sand cum 200.00 1709.55 341910.00
including consolidation with all
labour, lead, lift, tools, plants,
crossing of tracks as per drawing
and technical specification as
directed by the Engineer in charge
in case loose slush is encountered
at site of foundation before casting
the foundation or laying the filtering
24 052150 Providing and laying of filter media cum 450.00 2662.74 1198233.00
consisting of granular materials of
GW, GP, SW groups as per IS:1498
(latest) in required profile behind
boulder filling of abutments, wing
walls / return walls etc. above bed
level with all labour and material
complete job as per drawing and
technical specification of RDSO
25 052250 Providing Boulder Backing behind cum 300.00 359.00 107700.00
wing wall, return wall, retaining wall
with hand packed boulders &
cobbles with smaller size boulders
toward the back including all lead,
lift, labour & other incidental
charges as complete work in all
respect. Payment for
boulder/cobbles will be done extra.
accumulated water from any
location. Payment to be done for
Horse power of pump multiplied by
ECOR-CONST-HQ-ENGG/ECOR
Designing and developing Detailed
structural and working Drawings for
following items for ROB/RUB/Bridge
based on Railway's approved GADs,
duly collecting necessary data from
Railways and R&B authorities, duly
designing members and submission
of check plot duly getting proof-
checked by Railway approved
institutes, submitting for Railway's
verification and approval, making
corrections duly incorporating
suggestions in drawings/designs,
further submission of original in
transparent film paper and soft copy
(CD) for Railways approval etc. with
contractor's technical expertise and
instruments, labour, consumables,
repeatedly attending till final
approval etc., complete as directed
by Engineer in-charge.
piers/abutments
RCC retaining wall, abutment and
Hiring of machinery for minor
miscellaneous works for short
duration including operator/driver,
fuel, lubricants and consumable.
The contractor shall arrange all
statutory permits as required by
rules and regulations prevailing in
the area of work. Payment shall be
made for actual working hours at
similar with minimum 1.10 cum
bucket capacity
Schedule B-Execution of RCC Pile work , MS liner, Pile Load test etc. items Covered under USSOR-
Item- 2 Execution of all items under Schedule-B.
S No. Item No Description of Item Unit Qty Rate Amount
ECOR-CONST-HQ-ENGG/ECOR
Boring, providing and installation of
bored cast in-situ Reinforced
Cement Concrete piles using
Hydraulic piling Rig of specified
diameter and length below pile cap
of specified grade with Design Mix
Cement Concrete, using 20mm
graded crushed stone aggregate
and coarse sand of approved
quality, to carry a safe working load
not less than specified, concreting
by machine batching, machine
mixing, scaffolding, using Admixture
in approved proportion (as per
IS:9103), placing with tremie pipe,
chipping off of pile top to remove
laitance concrete above cut off level
etc., pumping and bailing out water
complete in all respect as per
approved drawing, specification and
direction of the Engineer in charge.
Note: 1. Payment for only cement,
reinforcement shall be made extra.
2. Length of the pile for payment
shall be measured up to the bottom
of RCC pile Cap. 3. Plasticiser shall
invariably be used in approved
proportion to increase workability
with minimum possible quantity of
cement for all grade of Design Mix
Concrete unless it is specifically
approved citing reasons for not
using plasticiser at the stage of Mix
Design and in that case deduction
shall be made as per relevant item.
2 022100 Providing, fabricating and installing MT 444.38 108148.95 48059230.40
permanent casing pipe for bored
piles for all diameters with specified
thickness of steel plate including all
labour, materials, tools & complete
as per approved drawing &
specifications complete in all
respect as per the direction of
Engineer in charge. Note: Payment
shall be made as per the weight of
circular plate of casing pipe only.
E x t r a for chiselling in addition to
boring of piles, if chiselling is
required to be resorted to in hard
rock or big stone boulders larger
than 30cm, manually or by any
Conducting load test of a single pile
up to specified capacity in
accordance with IS:2911 (Part-IV)
including installation of loading
platform and preparation of pile
head or construction of test cap and
dismantling of test cap after test
etc. with all labour, material, tool &
plants, equipment, machinery, etc.
complete as per drawing and
specification, as directed by the
4 022122 Initial load test above 50 ton and up Each 36.00 66928.79 2409436.44
to 100 T capacity pile
up to 250 T capacity pile
ECOR-CONST-HQ-ENGG/ECOR
6 025020 Providing and applying two coats of Sqm 7087.60 126.98 899983.45
coal tar or bitumen confirming to
IS:3117- latest version on the top
and sides of RCC box/slabs @ 1.70
kg/sqm after cleaning the surface
with all labour and materials
complete job as directed by the
Schedule C-Execution of Structural Steel works and its connected works etc works Covered under
Item- 3 Execution of all items under Schedule-C.
S No. Item No Description of Item Unit Qty Rate Amount
1 031090 Design, manufacturing, supplying Cubic 1991664.00 1.52 3027329.28
and fixing in position elastomeric Centimetre
b e a r i n g true to line and level
conforming to IS:3400, IS:226, BS-
5400 under prestressed concrete
girders/ Steel Girders, for Pre-cast as
well as cast-in-situ girders as per
approved drawing. The rate shall
include cost of load test of one no.
bearing from Railway approved
firms and all fixing materials,
equipments, machineries, labour,
taxes, loading, unloading, leading,
lifting etc. complete. Rates include
getting the drawing approved from
Railway and cost of inspection
during manufacturing from railway
approved organization.Note : 1. The
rate is for finished item complete
and paid only after fixing in position
below the girder. 2. The volume shall
be as given in the drawing and no
deduction shall be made for inserted
steel plates etc.
Providing and fixing in position of
standard preformed sealed and slab
type or strip seal elastomeric type
expansion joints for Railway bridge
or Road Over Bridges as per
approved drawings and latest
MORTH/IRC specifications complete
in all respect as directed by
Engineer in-charge.
Load testing of one or more spans of
bridge as selected by the Engineer
as per approved load test procedure
following relevant IS/IRC/Railway
codes with contractor's labour,
deflection measuring instruments,
loading materials, recording and
analyzing the load testing results
including all lead & lift, etc.
complete as required. The rates are
all inclusive and will be paid after
load test is finished and girder is
cleared of the kentledges/loading
material etc. The load shall be 1.25
times the stipulated design load.
part thereof over 100 MT in the span
design load capacity up to 800 MT
ECOR-CONST-HQ-ENGG/ECOR
Providing and fixing in position GI
Drainage Spouts of required length
with Grating in RCC slab and filling
bitumen along kerb as shown in
drawing with contractor's pipes,
bitumen, tools, equipment, lead,
lifts etc. complete as per
specifications and as directed by
Engineer in-charge.
Supplying, fabrication, assembling
of all types of steel girders of
specified spans with structural steel
conforming to Quality "B0" Grade
Designation E250 conforming to
IS:2062, erection / slewing / end
launching of steel girders with
cranes or any other approved
launching methods as per site
c o n d i t i o n s (not requiring traffic
block) on sub-structure including
provision of trolley refuges etc.,
complete as per approved Q A P and
drawings conforming to IRS-B1-2001
and other relevant codes and
specifications. Note: 1. Detailed
fabrication and erection drawings &
launching methodology will be
prepared by the contractor and got
approved from Railway. 2. The rate
is all inclusive including launching in
position, complete in all respect
except cost of (i) Painting /
Metalising; (ii) Bearings & (iii) HSFG
bolts which shall be paid extra under
relevant item. 3. The payment shall
be made on the theoretical weight
of main components and gusset
plates only. 4. Payment Schedule: (i)
Receipt of material at site: 40% (ii)
Fabrication of girders: 20% (iii)
Erection/Launching: 20% (iv)
Completion in all respects: 20%
Girder/Composite Girder (Steel
7 041013 Extra for using steel conforming to MT 559.00 3969.26 2218816.34
Grade Designation E350 instead of
Grade Designation E250 of Quality
"B0" as per IS: 2062
any dia and any length with suitable
n u t s including DTI washers
conforming to IRS-B1-2001 for
bridges and s t e e l structures with
contractors labour, tools and plants
and lead and lift etc., complete.
ECOR-CONST-HQ-ENGG/ECOR
Metallizing of steel work of girders
with sprayed aluminium after
surface preparation by Sand/grit
blasting, followed by one coat of
etch primer (IS:5666) & one coat of
Zinc Chrome primer (IS:104) and
two coats of aluminium paint
(IS:2339) with all labour, T&P and
material as a complete job duly
conforming to all relevant
specifications and process given
under Clause 39 of IRS-B1-2001.
Note: Nominal Thickness of sprayed
Aluminium coating shall be 150
microns. DFT of Zinc chrome primer
shall be 25-30 microns and DFT of
each coat of Aluminium paint shall
be 12-14 microns.
access ladders, inspection
platforms, Trolley refuges etc., on
bridges with structural steel
conforming to IS:2062 including
welding / bolting, priming painting
with one coat of ready mixed paint
of Zinc Chromate (IS:104) with DFT
of 25-30 microns followed by one
coat of Zinc Chrome Red Oxide
(IS:2074) with DFT of 25 microns
with all material, labour, T&P as a
complete job. Note: Painting shall be
paid separately under relevant item.
Design, supply, fitting and fixing in
position true to line and level POT-
PTFE bearing of 300MT Capacity,
consisting of a metal piston
supported by a disc or un reinforced
elastomer confined within a metal
cylinder, sealing rings, dust seals,
PTFE surface sliding against
stainless steel mating surface,
complete assembly to be of cast
steel / fabricated structural steel,
metal and elastomer elements
complete as per IS:2062, IS:1030,
Bridge Code and as per approved
drawing and Technical
Specifications. The design of the
bearings shall be submitted by the
manufacturers / contractor and got
approved from Railway before
fixing. Test report after inspection of
the bearings shall be submitted and
got approved before the materials
are lifted from the manufacturer
Schedule D-Supply , including straightening, cutting, bending, placing in position of Reinforcement
steel Items etc covered under ECoR USSOR -2021.
Item- 4 Execution of all items under Schedule-D.
S No. Item No Description of Item Unit Qty Rate Amount
ECOR-CONST-HQ-ENGG/ECOR
Supply of steel reinforcement of
approved brands/makes for R.C.C.
work including straightening,
cutting, bending, placing in position
and binding all complete.
of grade Fe-500D or more of
approved brands/makes.
Schedule Schedule E-Supply and using of Cement etc., Items covered under ECoR USSOR -2021.
Item- 5 Execution of all items under Schedule-E.
S No. Item No Description of Item Unit Qty Rate Amount
Supply and using Cement at
of approved brands/makes
Schedule F-Execution of ROB approach works and its connected works etc, items covered under
Item- 6 Execution of all items under Schedule-F.
S No. Item No Description of Item Unit Qty Rate Amount
13.0 FINISHING
Applying one coat of water thinnable
13.43 cement primer of approved brand
and manufacture on wall surface :
13.44S EXTERIOR FINISHING
Finishing walls with Acrylic Smooth
exterior paint of required shade :
13.46.1 New work (Two or more coat applied Sqm 531.36 166.85 88657.42
@ 1.67 ltr/10 sqm over and
including priming coat of exterior
primer applied @ 2.20 kg/10 sqm)
16.0 ROAD WORK
16.1S ROADS
16.1 Preparation and consolidation of sub Sqm 4560 180.5 823080
grade with power road roller of 8 to
12 tonne capacity after excavating
earth to an average of 22.5 cm
depth, dressing to camber and
consolidating with road roller
including making good the
undulations etc. and re-rolling the
sub grade and disposal of surplus
earthwith lead upto 50 metres.
16.9 Scarifying metalled (water-bound) Sqm 7150 27.55 196982.5
road surface including disposal of
rubbish, lead upto 50 m and
consolidation of the aggregate
received from scarifying with power
road roller of 8 to 10 tonne capacity.
16.30S PREMIX CARPET
Providing and applying tack coat
using hot straight run bitumen of
grade VG - 10, including heating the
bitumen, spraying the bitumen with
mechanically operated spray unit
fitted on bitumen boiler, cleaning
and preparing the existing road
surface as per specifications :
ECOR-CONST-HQ-ENGG/ECOR
Providing and applying tack coat
using bitumen emulsion conforming
to IS:8887, using emulsion pressure
distributer including preparing the
surface & cleaning with mechanical
With medium setting bitumen
16.49S MISCELLANEOUS
16.50 Providing and fixing Glow studs of Each 1000 175.5 175500
size 100x20 mm made of heavy
duty body shall be moulded ASA
(Acrylic styrene Acryloretrite ) or HIP
(High impact polystyrene) or ABS
having electronically welded micro-
prismatic lens with abrasion
resistant coating as approved by
Engineer in charge. The glow stud
shall support a load of 13635 kg
tested in accordance with ASTM
D4280. The slope of retro- reflective
surface shall be 35 (+/-5) degress to
base .The reflective panels on both
sides with at least 12 cm of
reflective area up each side. The
luminance intensity should be as per
the specification and shall be tested
as described in ASTM I: 809 as
recommended in BS: 873 part 4 :
1973. The studs shall be fixed to the
Road surface using the adhesive
conforming to IS, as per procedure
recommended by the manufacturer
complete and as per direction of
Engineer-in-charge.
Preparation of sub-base road
pavement with commercial dry lime
(slaked), fly ash stabilised soil with a
mix of 3% lime, 12% fly ash and
85% local suitable soil by weight, so
as to achieve minimum field C.B.R.
of 20, including mixing, rolling with
road roller curing etc. all complete.
Providing and laying Dense Graded
Bituminous Macadam using crushed
stone aggregates of specified
grading, premixed with bituminous
binder and filler, transporting the
hot mix to work site by tippers,
laying with paver finisher equiped
16.54 with electronic sensor to the
required grade, level and alignment
and rolling with smooth wheeled,
vibratory and tandem rollers as per
specifications to achieve the desired
compaction and density, complete
as per specificatons and directions
of Engineer-in-Charge.
thickness with bitumen of grade VG-
30 @ 5% (percentage by weight of
total mix) and lime filler @ 2%
(percentage by weight of
Aggregate) prepared in Batch Type
Hot Mix Plant of 100-120 TPH
ECOR-CONST-HQ-ENGG/ECOR
Providing and laying Bituminous
concrete using crushed stone
aggregates of specified grading,
premixed with bituminous binder
and filler, transporting the hot mix to
work site by tippers, laying with
paver finisher equiped with
16.57 electronic sensor to the required
grade, level and alignment and
rolling with smooth wheeled,
vibratory and tandem rollers to
achieve the desired compaction and
density as per specification,
complete and as per directions of
Engineer-in-Charge.
16.57.1 40/50 mm compacted thickness with cum 668.52 10870.75 7267313.79
bitumen of grade VG-30 @ 5.5%
(percentage by weight of total mix)
10 and lime filler @ 3% (percentage by
weight of Aggregate) prepared in
Batch Type Hot Mix Plant of 100-120
16.62 Providing and applying 2.5 mm thick Sqm 1066 623.8 664970.8
road marking strips (retro-
reflective) of specified shade/ colour
using hot thermoplastic material by
fully/ semi automatic thermoplastic
paint applicator machine fitted with
profile shoe, glass beads dispenser,
propane tank heater and profile
11 shoe heater, driven by experienced
operator on road surface including
cost of material, labour, T&P,
cleaning the road surface of all dirt,
seals, oil, grease and foreign
material etc. complete as per
direction of Engineer-in-charge and
accordance with applicable
specifications.
Construction of granular sub-base
by providing close graded Material
conforming to specifications, mixing
in a mechanical mix plant at OMC,
carriage of mixed material by
tippers to work site, for all leads &
16.78 lifts, spreading in uniform layers of
specified thickness with motor
grader on prepared surface and
compacting with vibratory power
roller to achieve the desired density,
complete as per specifications and
directions of Engineer-in-Charge.
16.78.1 With material conforming to Grade-I cum 1430 2658.1 3801083
12 (size range 75 mm to 0.075 mm)
having CBR Value-30
16.79 Providing, laying, spreading and cum 3513 2803.65 9849222.45
compacting graded stone aggregate
(size range 53 mm to 0.075 mm ) to
wet mix macadam (WMM)
specification including premixing the
material with water at OMC in for all
leads & lifts, laying in uniform layers
13 with mechanical paverfinisher in
sub- base / base course on well
prepared surface and compacting
with vibratory roller of 8 to 10 tonne
capacity to achievethe desired
density, complete as per
specifications and directions of
Engineer-in-Charge.
ECOR-CONST-HQ-ENGG/ECOR
22.0 WATER PROOFING
22.22 Providing and mixing integral Kg 4000 332.4 1329600
crystalline admixture for water
proofing treatment to RCC
structures like basement raft,
retaining walls, reservior, sewage &
water treatment plant, tunnels /
subway and bridge deck etc. at the
time of transporting of concrete into
the drum of the ready-mix truck ,
using integral crystalline admixture
@0.80% (minimum) to the weight of
cement content per cubic meter of
concrete) or higher as
recommended by the
manufacturer's specification in
reinforced cement concrete at site
of work. The material shall meet the
requirements as specified in ACI-
212-3R-2010 i.e. by reducing
permeability of concrete by more
than 90%, compared with control
concrete as per DIN 1048 and
resistant to 16 bar hydrostatic
pressure. The crystalline admixture
shall be capable of self-healing of
cracks up to a width of 0.50mm. The
work shall be carried out all
complete as per specification and
the direction of the Engineer-in-
charge. The product performance
shall carry guarantee for 10 years
against any leakage.
NEW TECHNOLOGIES AND
Providing at all heights, levels and
locations Aluminium profile
industrial troughed sheet of Alloy
31500/31000/40800, conforming to
IS 1254, IS 737, IS 2676. The sheet
shall be fixed using self drilling/self
tapping SS screws of size 5.5x65
mm with EPDM seal complete upto
required pitch in horizontal, vertical
26.19 or curved surfaces i/c cutting to size
and shape where required as per
specifications, detail drawings and
direction of Engineer-in-Charge. The
rate shall be inclusive of all screws,
seal, ridge, labour, scaffolding,
machinery for fixing and approved
sealent where required etc. but
excluding the cost of purlins, rafters
15 width 1044/920 mm, cover width
26.41S NEW TECHNOLOGY ITEMS
ECOR-CONST-HQ-ENGG/ECOR
26.65 Providing and fixing roofing consist Sqm 925.44 1630.4 1508837.38
of 0.8 mm thick galvanized steel
deck sheet confirming to IS
277:1992 used as permanent
shuttering over which MS wire mesh
3mm laid at 100x100 mm grid
16 including edge trim covered with
concrete. This metal deck will be
supported on structural steel beam
with shear studs. (Structural steel
like Beam, column, joists etc. &
concrete of different grade as per
design will be paid separately).
Schedule Schedule G-Execution of Non Schedule items (Non USSOR-2021 & CPWD-DSR-2021 Items).
Item- 7 Execution of all items under Schedule-G.
S No. Item No Description of Item Unit Qty Rate Amount
1 1 Providing Reinforced earth structure Sqm 4560.00 9848.09 44907290.40
including excavation for foundation,
foundation concrete in M15 and
cement concrete grooved seating in
the foundation for facing elements
inM35 (facia material) and its
placement, assembling, joining with
facing elements and laying of the
reinforcing elements asper Clause
3103, fixing frictionties and anchor
pins etc. as per approved design
and drawing ,providing filter media
of minimum 300 mm width or more
behind wall with perforated drainage
pipe of required diameter both
longitudinal and transverse direction
as directed ,back filling with
approved granular selected material
, laying in layers of 150mm thick,
breaking clods, dressing in required
lines, grades& section, watering and
compaction by vibratory roller etc.
including all lifts (for 5 Km lead &
average height of 8 m)complete.
Note : Back filling of approved
granular material of1500mm width
to be provided."Providing
REINFORCED EARTH".
carboxylate ether base water
reducing admixture Plast Super-
C700 conforming to lS:9103-1999
(to be added @ 1% by weight of
cement) for CC & RCC work for
controlling water cement ratio and
for gaining early strength.
ECOR-CONST-HQ-ENGG/ECOR
3 3 Provision of an reinforced cement Metre 760.00 783.15 595194.00
concrete crash barrier /RCC wall
type railing at edge of the road,
approaches to bridge structure and
medians, constructed with M-25
Grade concrete with HYSD
reinforcement conforming to IRC: 21
and dowel bars of 25mm dia,
450mm long at expansion joints
filled with pre-moulded asphalt filler
board, keyed to the structure on
which it is built and installed as per
design and as per dimension in the
approved drawing and at location
directed by the engineer all as
specified excluding cost of steel
reinforcement, its fabrication
charges and premoulded filler for
finished item (as per approved
4 4 Providing and laying well graded cum 1520.00 2533.45 3850844.00
drainage fill by 450 mm thick
composed of 20mm, 10mm, and
6mm of well graded aggregate as
per drawing and technical
specification and including cost,
seignorage and conveyance of all
the material to site and all labour
charge, drain pipe wrapped With
geotextile, hire charges of plant and
machinery for laying filter Media,
including technical supervision as
directed by engineer- in-charge for
finished item of work for drainage
layers behind the facts. As per
approved reinforced soil wall
5 5 Filling in between reinforced cum 18240.00 378.20 6898368.00
earth(RE) walls with good gravel
(Angle of interna friction not less
than 32) depositing the gravel
between walls, spreading gravel,
sectioning, grading and
consolidation with 8 to 10 Tonnes
vibratory road Roller @ OMC and
with plate compactor/small vibrator
for 1.5 m width from facia to meet
requirement of table 300-2 of
MORTH, including all hire and
operational charges of T&P and
seigniorage charges, complete for
finished item of work as per
MoRT&H specification 305 & 2200
(5th Revision) (Payment will be
made based on level for finished
Item of work) as per approved
drawing and as per the directions of
the Engineer-ln-charge.
ECOR-CONST-HQ-ENGG/ECOR
6 6 Conducting non destructive tests on Numbers 400.00 2795.00 1118000.00
butt and fillet welds as per IS codes
by Radiography/Ultrasonic, Magnetic
particle test report and dye
penetration tests by approved
agency and submitting the proper
test report to the department duly
certification by the approved agency
with contractor, labor, materials,
tools and plants including leading,
loading and unloading etc.,
complete as directed by the
Engineer-incharge.R.T.Test (Film
7 7 Conducting non destructive tests on Metre 4000.00 608.00 2432000.00
butt and fillet welds as per IS codes
by Radiography/Ultrasonic, Magnetic
particle test report and dye
penetration tests by approved
agency and submitting the proper
test report to the department duly
certification by the approved agency
with contractor, labor, materials,
tools and plants including leading,
loading and unloading etc.,
complete as directed by the
Engineer-in-charge.D.P.Test/
M.P.Test/U.T.Test.
8 8 Providing precast RCC slab for use cum 359.29 8121.00 2917794.09
as shuttering slabs, foot path slab
etc., using M-30 design mix with 20
mm graded stone aggregate
including fixing and removal of
contractor's for works ,shuttering
supports, vibrating ,curing etc., and
fixing in position (all labour and
materials including cement by the
contractor) with all lead and lift etc
as per approved drawing and as
directed by the Engineer-in-charge.
elastomeric membrane coating with
breathing property(viz., "Emce
colour Flex"/Deck guard 'S' or similar
type coating materials) over one
coat with its primer, the system
should be made of water based
acrylic polymer with selected
mineral fillers having properties of
ultra violet resistant crack bridging
type, carbonation resistant, water
proofing coating, the consumption of
primary coat and two coats of
protective coating shall be as per
the manufacturers specification
should be in suitable approved
shades, including cost of materials,
cleaning chipping and removing the
dirt particles of the concrete with
wire brush and water, labour for
applying the above coatings,
scaffolding charges, all inclusive
taxes etc., for sub structure and
super structure of the Road over
Bridge. Dry film thickness of each
coating shall not be less than 150
microns. Manufacturer specifications
shall be followed.
ECOR-CONST-HQ-ENGG/ECOR
11 11 Painting of crash barrier/kerb stones Sqm 1304.69 149.00 194398.81
of CC/RCC slabs, stone with
approved quality reflective type of
Enamel paint , including one coat of
primer with contractor's own labour
and material etc. complete as
directed by Engineer -in -charge.
0.2mm) thick heavy duty, full-body
homogeneous, anti-algal, all
weather resistant, exterior use
Paving vitrified tiles of size up to
400mmx400mm in approved shade,
colour & quality, having anti-skid
matt finish surface with plain or
projected texture. Tiles to be laid on
20 mm average thick cement mortar
bed of 1:4 (1 cement : 4 coarse
sand) with all labour, material
13 13 Supplying, cutting and fixing 18 mm Sqm 150.00 1203.00 180450.00
thick mastic pads for clean
joints/expansion joints in between
slab etc. as per IS: 1838
specification inclusive of costs of
labour, materials, tools and
equipment, loading, unloading, all
lead and lift, including crossing of
railway track, taxes, royalty and all
other incidental charges etc.,
complete as diretced by Engineer-In-
charge (cut pieces less than 500 mm
should not be used).
14 14 Providing Speed breakers as per Each 2.00 2953.00 5906.00
Railways approved Plans/Drawings
including painting white and yellow
bands, diagonals etc., complete with
contractors labour men and
materials, machinery, consumables,
approved paint, T&P, Crew, fuel etc.,
complete inlcuidng all lead and lifts
and directed by egineer-In -Charge.
15 15 Supply, fabrication, painting and Each 15.00 4429.00 66435.00
erection of road traffic warning
boards of suitable height of various
purposes such as No parking, No
entry , HTV and prohibited etc as
per IRC standards made of 50 * 50 *
5 mm MS angles such and 3 mm
thick MS plate for the board of
appropriate enamel paint and
pasted with reflective stickers
reflective paint on the board erected
into the ground with cement
metre including earth work
excavation, etc as directed by the
Engineer-in-Charge.
ECOR-CONST-HQ-ENGG/ECOR
16 16 Supplying & fixing of bearing with Each 4.00 154046.49 616185.96
fixtures for 25T loading for
composite girders- welding type
18.3m/24.4m and 30.5m span
Metallic guided bearing as per RDSO
approved drawings with latest
amendment. The rate is inclusive of
supply of Metallic guided bearings
and all other components of
approved dimensions and
specifications based on RDSO
Drawings with latest amendment,
fixing in position on bed block true
to line and level on pier/ abutment.
This included testing charges from
reputed laboratories, inspection
charges, if any, fixing with any other
adhesive material to the satisfaction
of Engineer at site with all lead, lift,
labour etc. complete in all respect.
Note The bearing shall meet with
the requirement as mentioned in the
respective approved drawings.
17 17 Supplying & fixing G.I. lamp posts in Each 10.00 10290.00 102900.00
crash barriers of ROB. The Post shall
consist of G.I. Pipe 100 mm dia 3m
long reduced to 75 mm dia 2.5m
long and again reduced to 50 mm
dia 2.5 m vertical height including
fixing of G.I. reducers and welding of
G.I. Pipes, bending ,transportation,
all taxes ,lead, lift etc. Necessary
provision for Electrical concealed
wiring shall be made in the parapets
and lamp posts complete as require.
Rate is also inclusive of fixing of
contractor's junction boxes in crash
18 18 Fabricating, supplying & installing Kg 1200.00 993.89 1192668.00
stainless steel railings for staircases,
balconies, FOBs,
Enquiry/Reservation complex etc.,
made of SS 304 grade stainless
steel, laser cut / water jet cut (no
shearing), polished with Automatic
round/flat polishing machine to get a
uniform hairline finish. All parts shall
be connected to each other with the
help of prescribed size CNC made
solid connectors, countersunk
screws. Welding should be finished
ensuring that no welding marks are
visible and assembly is mounted on
floor with the help of dash fasteners.
Railings shall be fabricated as per
approved drawings by engineer-in-
charge. Manufacturer shall submit
maintenance manual and basic
material test report for grade
ECOR-CONST-HQ-ENGG/ECOR
quality of poly carbonate sheets
2mm thick in side walling to suit the
required profile embossed clear
translucent UV protected with all
fittings such as J bolts bitumen and
cup washers, including drilling holes
in sheets, filling the gaps with Sqm
silicon sealant including all cost of
labour materials, lead, lift,
transportation, loading, unloading,
etc. Complete as directed by
Engineer-in- charge. Note: The area
of individual sheets will be taken
into consideration for payment.
20 20 Comprehensive Land Acquisition Each 1.00 631880.00 631880.00
Liaison Services under Railways Bridge
(Amendment) Act, 2008 including
Site office with all category of Man
power (Land expert, Amin, Legal
expert, Chainman etc.), Camp for
public consultation, boundary
making and fixing of stone with
supervision charges involving below
activities: NOTE: 1. PRE-
ACQUISITION ACTIVITIES (Sections
20-A to 20-D) 1.1 Land Survey and
Verification (Section 20-A Support)
1.2 Stakeholder Consultation and
Documentation 1.3 Survey
Operations Support (Section 20-B)
1.4 Damage Assessment and
Compensation (Section 20-C) 1.5
Objection Management (Section 20-
D) 2. DECLARATION PROCESS
(Section 20-E) 2.1 Declaration
Documentation 2.2 Publication and
Notification 3. COMPENSATION AND
ACQUISITION (Sections 20-F to 20-I)
3.1 Valuation and Compensation
(Sections 20-F & 20-G) 3.2 CALA and
Arbitration Support 3.3 Payment and
Possession (Sections 20-H & 20-I) 4.
POST-ACQUISITION ACTIVITIES 4.1
Land Transfer and Mutation 4.2 Final
Demarcation and Handover 4.3
Compliance and Reporting 4.4 Fixing
of Boundary stone Payment
Schedule: i) 40% of the accepted
rate will be made after completing
Section -11/20A to 20-D. ii) 20% will
be released on clearing Section - 20-
E (iii) 20% on clearing Section - 20-F
(iv) 20% in the Final bill after
completing all land acquisition work,
including mutations of land to the
name of the Railway.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .