Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹9.3 LAccepted-AOC | 1 | Accepted-AOC Lowest Bidder | |
| 2 | 2₹9.7 L+₹43,484.12 (4.67%)Rejected-Finance 215 KRISHNAPUR ROAD KOLKATA 700102 | KOLKATA | 24 PARAGANAS NORTH | WEST BENGAL | 700102 | 2 | Rejected-Finance L2 Bidder | |
| 3 | 3₹10.0 L+₹73,354.82 (7.88%)Rejected-Finance 38 4 NEW SANTOSHPUR 1ST LANE KOLKATA 700075 | KOLKATA | WEST BENGAL | 700075 | 3 | Rejected-Finance L3 Bidder |
Tender Value
Refer Docs
EMD Value
₹23,275
Closing Date
9 Jul 2024, 11:00 amClosed
D.M., BIDHANNAGAR-II DIVISION
Bidhannagar - II Divisional Office, WBSEDCL, Prafulla Kanan, Krishnapur Kolkata - 700101
Execution of Repair-Maintenance work iro DTR Kiosks, Service JBs, FPBs at different locations under Teghoria CCC under Bidhannagar-II Division
2024_WBSED_696737_1
BNDDII/OM/E-TENDER/24-25/03
Open Tender
Miscellaneous Services
Lump-sum
90 days
Tegoria CCC
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹23,275
10 Feb 2025
28 Jun 2024
11 Jul 2024
28 Jun 2024
9 Jul 2024
3 Jul 2024
Amount
Repairing the body of L.T.Kiosk Boxes by supply of 16 SWG MS sheet with Apartment running welding at-Ariyan Hospital(2pcs), Beside Arsalan-New Avenue Nursing Home(1pc), Ambika Apartment opp(3pcs), Behind Loards Building(Aminia) Box No.1 (6pcs),M-Bazar Box No.2 (2pcs), Santi Kunja Box No.1 (1pc), Outside Belvedere Building Box No.1(2pcs),Bidhannagar Pouranigam Borough-2 office (3pcs), Pump Room(1pc), Charigram School(2pcs),Sarkar Bagan Box No.1(1pc),No.2(2pcs), Raghunathpur (uttarpara) (2pcs), Annapurna Apartment (3pcs), Apollo Pharmacy (Raghunathpur Balaka Sangha)(3pcs),Indrapastra Apartment Phase-III No.1(1pc).
Same as sl.no.1.But for F.P.Boxes at- Outside Sagar Jyoti Apartment Box No.1 (2pcs),M-Bazar(2pcs), VIP Enclave B-II Block(2pcs), opp Belvedere Building(1pc), Inside Belvedere Building Box No.2 (2pcs),Regent Court-Phase-I-Box No.1(2pcs), No.2 (2pcs),Block-3(1pc),Inside Shyam Vihar-Phase-I(1pc), Shyam Vihar-Phase-II -7 No.Building(2pcs), S/Stn Box No.1(2pcs),Anupama Housing Complex S/Stn-2 Box No.2 (2pcs),Phase-III-S/Stn (2pcs), Phase-I-Beside C Block (2pcs), Koyla Vihar Avinandan-8 no. Building(2pcs),Beside Charnok Hospital Natural Nest Apartment(2pcs).
Same as sl no.1.But for S.J.Boxes at-Anupama Housing Complex Phase-III-S/Stn(1pc), Pump Room(1pc), Anupama Housing Complex-Phase-I 3C Building (3pcs),2C Building (4pcs),7C Building (3pcs),15C Building(3pcs), Pump House(D Block) (9pcs), 24D Building (4pcs),37D Building(3pcs), 30D Building (4pcs),35D Building (4pcs),29D Building (4pcs), Mandalganthi Apartment-60CC(1pc), 53DD(1pc), Kendriya Vihar Canteen(2pcs),C-1-3(2pcs), Koyla Vihar Basundhara 1A Building(1pc),2 No. Building(1pc).
Same as sl.no.1.But for J.Boxes at-Kendriya Vihar-Play Ground Box No.1(2pcs).
Repairing the Door of L.T.Kiosk Boxes by supply of 16. SWG. Ms. Sheet with running welding at- Grihangan Apartment(2pcs), Ambika Apartment opp(2pcs), Behind Loards Building (Aminia) Box No.1(1pc), M-Bazar Box No.1 (2pcs),Outside Belvedere Building Box No.1 (2pcs), Charigram School (1pc), Durga Bhawan (1pc), Beside A.R.Motor (2pcs).
Same as sl.no.5.But for F.P.Boxes at-Fortune Square Box No.1(1pc), Opp Santi Kunja (4pcs), Regent Court-Block-1 (1pc), Regent Sagar-Block-C (2pcs), Anupama Housing Complex S/Stn-1 (1pc),Phase-I-23D Building (1pc),Indra Pastra Complex Phase-I-Opp B2 Building Box No.1(1pc), M-Bazar(4pcs), Anupama Housing Complex-Phase-I D Block S/Stn(4pcs),
Same as sl no.5.But for S.J.Boxes at-Anupama Housing Complex Phase-II Building No.81 (1pc), Phase-III-S/Stn (1pc), Building no.87-88 (1pc), Anupama Housing Complex-Phase-I- Pump House(D Block)(2pcs),43E Building(1pc), Mandalganthi Apartment-60CC(1pc),Kendriya Vihar-ST Plant(2pcs),B-8-10 (2pcs),B-11-12(4pcs),B-7-9(2pcs), A-3-4 (2pcs),B-17-18(2pcs), B-15-16(1pc), C-1-3(4pcs),Koyla Vihar Basundhara 10 No. Building (2pcs),3 No. Building(1pc),
Supply and fixing of New Door of L.T.Kiosk Boxes by supply of 16 SWG. Ms. Sheet with running welding at-Outside Smart Bazar(2pcs).
Same as sl no.8.But for S.J.Boxes at- Anupama Housing Complex Phase-I 23D Building (2pcs), 30D Building (2pcs),
Supply and fixing of New Lock of L.T.Kiosk Boxes at-Narayan Institute opp Box No.2(2pcs), Rajarhat Residency Opp Box No.1(2pcs),No.2(2pcs), Grihangan Apartment(2pcs), Ambika Apartment(2pcs), Ambika Apartment opp(2pcs), Dayanand Public School (2pcs), M-Bazar Box No.1 (1pc),No.2(2pcs), Sarkar Bagan Box No.2(1pc),Rani Apartment(2pcs),Durga Bhawan (1pc),Raghunathpur (uttarpara) (1pc),Outside Anupama Phase-4(2pcs), Koyla Vihar Avinandan-Gate (2pcs),Yamuna Block (2pcs),Exit Gate(2pcs),Haldiram Enclave (2pcs), Indrapastra Apartment Phase-III No.1(2pcs), No.2(2pcs).
Same as sl.no.10.But for F.P.Boxes at- Fortune Square Box No.1 (4pcs), No.2(4pcs),No.3 (4pcs), Meadows Square Box No.1 (4pcs), No.2(4pcs), Ambey Residency (4pcs),Inside Gitanjali Apartment Box No.1(2pcs),No.2(4pcs), Outside Sagar Jyoti Apartment Box No.1(2pcs), No.2(2pcs), M-Bazar (2pcs),VIP Enclave-D-II Block (2pcs), Opp Santi Kunja (4pcs), opp Belvedere Building(2pcs), Regent Court-Phase-I-Box No.1 (2pcs), No.2(2pcs), Regent Court-Block-1(2pcs),Block-3(2pcs), Regent Sagar-Block-C(4pcs), Inside Shyam Vihar-Phase-I (2pcs), Shyam Vihar-Phase-II -2 No.Building(1pc), Shyam Vihar-Phase-II -7 No.Building (2pcs), Anupama Housing Complex S/Stn-1 (2pcs), Phase-III-S/Stn(2pcs), Phase-I-4B Building (8pcs),Play Ground (2pcs),7C Building (2pcs), D Block-S/Stn (3pcs),23D Building (1pc), Mandalganthi Apartment S/Stn (4pcs), Kendriya Vihar S/Stn Box No.1(2pcs), No.2(4pcs),B-3-4 (1pc),Anupama Phase-IV-GG Building(2pcs),Pump Room (3pcs) ,Koyla Vihar Avinandan Opp 1A Building(2pcs),S/Stn Box No.1 (2pcs),No.2(2pcs),8 no. Building (2pcs),Indra Pastra Complex Phase-I-Opp B2 Building Box No.1 (2pcs),No.2 (2pcs),A4 Block (2pcs),A1 Block (2pcs).
Same as sl no.10.But for S.J.Boxes at-Anupama Housing Complex Phase-III-S/Stn(1pc), Pump Room (1pc),Building no.87-88 (2pcs), Anupama Housing Complex Phase-I 8A Building (2pcs),4B Building(1pc), Pump House(D Block)(2pcs), opp Pump House(D Block)(2pcs),37D Building (1pc), 35D Building(1pc),29D Building (2pcs),28D Building(1pc), Mandalganthi Apartment-60CC (1pc),Kendriya Vihar S/Stn (2pcs), Canteen (2pcs),B-3-4 (1pc),ST Plant(1pc), B-8-10(2pcs),B-11-12 (2pcs),B-7-9(1pc), A-5-6 (4pcs), A-3-4(4pcs),B-17-18(2pcs), B-15-16(1pc),C-1-3(4pcs), Koyla Vihar Basundhara 1A Building (2pcs), 10 No. Building(2pcs),8 No. Building (2pcs),3 No.Building(2pcs),4 No.Building(2pcs).
Supply and fixing of New Hinge of L.T.Kiosk Boxes at- Ambika Apartment opp(2pcs), Behind Loards Building(Aminia) Box No.1(2pcs),Beside A.R.Motor (3pcs),Shyam Vihar Phase-I outside(1pc), Rani Apartment (4pcs),Burman House-RH 45/5(2pcs).
Same as sl.no.13.But for F.P.Boxes at- Fortune Square Box No.3 (2pcs), Ambey Residency (4pcs), M-Bazar (2pcs), VIP Enclave-D-II Block(2pcs),Opp Santi Kunja (8pcs),opp Belvedere Building (4pcs),Regent Court-Block-1 (4pcs),Phase-II(Block-H Backside) Box No.2(2pcs), Shyam Vihar Phase-II-S/Stn Box No.1(2pcs), Anupama Housing Complex Phase-III-S/Stn(2pcs), Play Ground (4pcs),7C Building(2pcs),D Block-S/Stn(2pcs), Mandalganthi Apartment S/Stn(4pcs),Kendriya Vihar S/Stn Box No.1(1pc),B-3-4(2pcs),
Same as sl no.14.But for S.J.Boxes at- Anupama Housing Complex Phase-I-4B Building (2pcs), Pump House(D Block) (4pcs),Kendriya Vihar S/Stn (2pcs), B-7-9 (2pcs), A-3-4(4pcs), C-1-3(4pcs),Koyla Vihar Abhinandan-Yamuna Block(4pcs), Koyla vihar Basundhara 4 No.Building(2pcs).
Supply and fixing of New Top of F.P. Boxes by supply of 16 SWG. Ms. Sheet with running welding at-Regent Court-Block-1,Block-3 Inside Gitanjali Apartment Box No.1,No.2, Koyla Vihar Avinandan Yamuna Block, Indra Pastra Complex Phase-I E-1 Block,A4 Block,A1 Block.
Same as sl no.16.But for L.T.Kiosk Boxes at- Behind Loards Building(Aminia) Box No.2,Mio Amore Beside Lane Box No.1.
Same as sl no.16.But for S.J.Boxes at- Anupama Housing Complex Phase-I-4B Building,8A Building, Pump House(D Block), Anupama Housing Complex-Phase-II Shelter-Pump House, Kendriya Vihar A-5-6,
Repairing the Top of L.T.Kiosk Boxes at-Beside Arsalan-New Avenue Nursing Home(2pcs),
Supply and fixing of New Aptorn of S.J.Boxes by supply of 16 SWG. Ms. Sheet with running welding at-Anupama Housing Complex Phase-I-Pump House(D Block) (1pc),30D Building (1pc),Koyla Vihar Basundhara 1A Building (1pc),
Supply and Fixing of New Handle of L.T.Kiosk Boxes at-Durga Bhawan (1pc),
Same as sl no.21.But for S.J.Boxes at- Anupama Housing Complex Phase-I-4B Building(1pc),
Same as sl no.21.But for J.Boxes at-Anupama Housing Complex Phase-I D Block-Beside S/Stn(1pc).
Same as sl.no.21.But for F.P.Boxes at-Anupama Housing Complex S/Stn-3 (2pcs), Anupama Housing Complex S/Stn-1 (2pcs), Mandalganthi Apartment S/Stn (4pcs).
Supply and fixing of New Base of L.T.Kiosk Boxes by supply of 16 SWG. Ms. Sheet with running welding at-Charigram School, Beside A.R.Motor.
Repairing the Aptorn of F.P. Boxes at- Outside Sagar Jyoti Apartment Box No.1(2pcs), Koyla Vihar Avinandan Opp 1A Building(1pc),
Same as sl no.26.But for S.J.Boxes at- Anupama Housing Complex Phase-I 9A Building(1pc),
Lessee of F.P.Boxes. Height 12’’(40mmX40mm) angle and thickness 6mm by supply of including materials at- Inside Gitanjali Apartment Box No.1 (4pcs), No.2(4pcs), Opp Santi Kunja (4pcs), Inside Belvedere Building Box No.1(4pcs), No.2 (4pcs),Regent Court-Phase-I-Box No.1(4pcs), No.2(4pcs), Block-1 (4pcs), Shyam vihar Phase-II-S/Stn Box No.1(4pcs), No.2(4pcs), No.3(4pcs), Anupama Housing Complex S/Stn-3 (4pcs), S/Stn-1(4pcs), Phase-III-S/Stn (4pcs), Phase-I-35D Building (4pcs), Kendriya Vihar S/Stn Box No.1 (4pcs),No.2(4pcs), Anupama Phase-IV-GG Building(4pcs), Yamuna Block (4pcs), Koyla Vihar Avinandan Opp 1A Building (4pcs), S/Stn Box No.1 (4pcs), No.2(4pcs), 8 no. Building (4pcs), Indra Pastra Complex Phase-I-Opp B2 Building Box No.1 (4pcs), No.2(4pcs),M-Bazar (4pcs), Anupama Housing Complex-Phase-I 4B Building (4pcs), Kendriya Vihar Avinandan-Pump Room(4pcs), Indra Pastra Complex Phase-I E-1 Block (4pcs),A4 Block(4pcs),A1 Block (4pcs).
Same as sl no.28.But for S.J.Boxes at-Anupama Housing Complex-Phase-I 8A Building(4pcs), 2C Building (4pcs),Pump House (D Block) (4pcs),30D Building(4pcs), Kendriya Vihar- C-1-3 (4pcs), Koyla Vihar Abhinandan -Yamuna Block (4pcs),Yamuna Block-Exit Gate (4pcs), Koyla Vihar Basundhara 1A Building (4pcs),1B Building (4pcs), 10 No. Building (4pcs),2 No. Building (4pcs), 9 No. Building (4pcs),8 No.Building (4pcs),3 No. Building (4pcs),4 No. Building (4pcs),5 No. Building (4pcs), Anupama Housing Complex-Phase-II Shelter Building 73(4pcs),Building 64(4pcs), Building70(4pcs),Building 63/71(4pcs), Anupama Housing Complex-Phase-I 28D Building (4pcs), Mandal Ganthi Apartment 60CC(4pcs),53DD(4pcs), Kendriya Vihar A-5-6(4pcs),
Making of foundation of Lessee of F.P.Boxes by supply of Sand, Cement, Stone chips etc. at- Inside Gitanjali Apartment Box No.1 (4pcs),No.2(4pcs), Opp Santi Kunja (4pcs), Inside Belvedere Building Box No.1(4pcs),No.2 (4pcs),Regent Court-Phase-I-Box No.1(4pcs), No.2(4pcs), Block-1 (4pcs), Shyam vihar S/Stn Box No.1(4pcs), No.2(4pcs), No.3 (4pcs),Anupama Housing Complex S/Stn-3 (4pcs), S/Stn-1(4pcs), Phase-III-S/Stn (4pcs), Phase-I-35D Building (4pcs), Kendriya Vihar S/Stn Box No.1(4pcs), No.2(4pcs), Anupama Phase-IV-GG Building(4pcs), Yamuna Block(4pcs), Koyla Vihar Avinandan Opp 1A Building (4pcs), S/Stn Box No.1(4pcs), No.2(4pcs), 8 no.Building (4pcs), Indra Pastra Complex Phase-I-Opp B2 Building Box No.1(4pcs), No.2(4pcs), M-Bazar (4pcs), Anupama Housing Complex-Phase-I 4B Building (4pcs), Kendriya Vihar Avinandan-Pump Room(4pcs), Indra Pastra Complex Phase-I E-1 Block(4pcs), A4 Block(4pcs),A1 Block(4pcs).
Same as sl no.30.But for S.J.Boxes at-Anupama Housing Complex Phase-I-8A Building(4pcs),2C Building (4pcs), Pump House(D Block)(4pcs),30D Building (4pcs), Kendriya Vihar-C-1-3(4pcs), Koyla Vihar Abhinandan-Yamuna Block (4pcs), Exit Gate(4pcs), Koyla Vihar Basundhara 1A Building (4pcs),1B Building (4pcs), 10No.Building(4pcs),2 No. Building (4pcs), 9 No. Building(4pcs), 8 No. Building (4pcs),3 No. Building (4pcs), 4 No. Building (4pcs),5 No. Building(4pcs).,Anupama Housing Complex-Phase-II Shelter Building 73(4pcs), Building 64(4pcs), Building70(4pcs),Building 63/71 (4pcs), Anupama Housing Complex-Phase-I 28D Building (4pcs), Mandal Ganthi Apartment 60CC(4pcs),53DD(4pcs), Kendriya Vihar A-5-6(4pcs),
Making of New Plinth of F.P.Boxes by supply of sand, cement, bricks etc. at- Inside Gitanjali Apartment, Opp Santi Kunja, Inside Belvedere Building Box No.2. Regent Court-Phase-I-Box No.1,No.2, Block-1, S/Stn Box No.1,No.2, No.3,Anupama Housing Complex S/Stn-3, S/Stn-1,Phase-III-S/Stn, Phase-I-35D Building, Kendriya Vihar S/Stn Box No.1, No.2, Anupama Phase-IV-GG Building, Yamuna Block, Koyla Vihar Avinandan Opp 1A Building, S/Stn, 8 No. Building, Indra Pastra Complex Phase 1 Opp B2 Building, Anupama Housing Complex-Phase-I 4B Building, Koyla Vihar Avinandan-Pump Room, Indra Pastra Complex Phase-I E-1 Block.
Same as sl no.32.But for S.J.Boxes at-Anupama Housing Complex-Phase-III-Pump Room,Phase-I-8A Building, 2C Building, Pump House (D Block), 30D Building, Kendriya Vihar -C-1-3, Koyla Vihar Abhinandan-Yamuna Block, Exit Gate, Koyla Vihar Basundhara 1A Building, 1B Building, 10 No. Building, 2 No. Building, 9 No. Building, 8 No. Building, 3 No. Building, 4 No. Building, 5 No. Building, Anupama Housing Complex-Phase-II Shelter Building 73,64,70, 63/71, Anupama Housing Complex-Phase-I 28D Building, Mandal Ganthi Apartment 60CC, 53DD
Removal the old paints from all side by scrubbing with emery paper to prepare the surface to paint of F.P. Boxes and painting two coats of Red oxide as primer and two coats Grey at inside and two coats Aluminum paint as per specification at-Rajarhat Residency(16.57Sqm), Fortune Square Box No.1 (14.24Sqm),No.2(14.24Sqm), No.3 (14.24Sqm), Meadows Square Box No.1(14.24Sqm), No.2(14.24Sqm), Assam Petrolium(11.37Sqm), Ambey Residency(14.24Sqm), Star Enclave Inside Box No.1 (16.57Sqm),No.2 (11.37Sqm), Beside Chanok Hospital (16.57Sqm),Haldiram Enclave Box No.1(14.24Sqm), No.2(14.24Sqm), Inside Gitangali Apartment Box No.1(17.55Sqm), No.2 (17.55Sqm),Outside Sagar Jyoti Apartment Box No.1(14.24Sqm), No.2(14.24Sqm) ,M-Bazar (16.57Sqm), VIP Enclave A Block(8.10Sqm), B-II Block (16.57Sqm), D-II Block (16.57Sqm), E Block(16.57Sqm), Opp Santi Kunja(16.57Sqm), Opp Belvedere Building(8.10Sqm), Inside Belvedere Building Box No.1(17.79Sqm),No.2(12.20Sqm), Regent Court(Phase-I) Box No.1 (16.57Sqm),No,2(16.57Sqm), Block-1(16.57Sqm), Block-3 (16.57Sqm), Phase-2 Block-H Backside Box No.1(14.24Sqm), No.2(14.24Sqm), Block-G (14.24Sqm), Block-C Regent Sagar(12.20Sqm), Inside Shyam Vihar(16.57Sqm), Shyam Bihar Phase-II 2 No.Building (8.36Sqm), 7 No. Building(8.36Sqm), 5 No. Building(16.57Sqm),S/Stn Box No.1(14.24Sqm), Box No.2 (14.24Sqm), No.3(14.24Sqm), Anupama Housing Complex S/Stn-2 Box No.1 (17.85Sqm), No.2(16.57Sqm),S/Stn-3 (17.85Sqm), S/Stn-1(16.57Sqm), Anupama Housing Complex Phase- III S/Stn (17.87Sqm),4B Building (12.76Sqm), Playground (12.20Sqm), 7C Building (12.76Sqm), Beside C Block (12.76Sqm), D Block S/stn (12.76Sqm), 23D Building (12.76Sqm),35D Building (16.57Sqm), Mangalganthi Apartment-S/Stn(17.85Sqm), Kendriya Vihar -S/Stn Box No.1 (17.24Sqm),No.2(17.24Sqm), B-3-4(14.25Sqm), B-8-10 (14.25Sqm), C-9-10 Box No.1 (17.24Sqm),No.2(17.24Sqm), A-1-2(14.25Sqm), B-15-16 (14.25Sqm), Anupama Phase-4 GG Building(17.85Sqm), Yamuna Block(17.85Sqm), Pump Room (17.85Sqm), Koyla Vihar Basundhara-Opp 1A Building (17.85Sqm), S/Stn Box No.1 (17.24Sqm),No.2(17.24Sqm), 8No.Building(17.85Sqm),Indra Pastra Complex Phase-1-opp B2 Building Box No.1(16.57Sqm), No.2(16.57Sqm), E1 Block (16.57Sqm), A4 Block (16.57Sqm), A1 Block (16.57Sqm).
Same as sl no.34.But for L.T.Kiosk Boxes at-Narayan Institute opp Box No.1(5.93Sqm),No.2(5.06Sqm), Rajarhat Residency Opp Box No.1 (2.74Sqm), No.2(2.74Sqm), Opp Fortune Square(5.06Sqm), Dream Plaza (5.06Sqm), Ariyan Hospital (5.06Sqm), Beside Dhaba Akante (5.06Sqm), Beside Arsalan-New Avenue Nursing Home(2.74Sqm), Grihangan Apartment(3.25Sqm), Ambika Apartment(3.25Sqm), Ambika Apartment opp(3.25Sqm), Dayanand Public School (3.25Sqm),Behind Loards Building(Aminia) Box No.1 (5.06Sqm),No.2(5.06Sqm), No.3(5.06Sqm),No.4(5.06Sqm), Mio Amore Beside Lane Box No.1(5.06Sqm),No.2(5.06Sqm), Chinar Park Adhibasi Brinda Club Box No.1(5.06Sqm), No.2 (5.06Sqm), Star Enclave Outside Box No.1(5.06Sqm), No.2 (5.06Sqm) , Beside A.R. Motor(5.06Sqm), Haldiram Enclave(5.06Sqm),Outside Gitanjali Apartment(5.06Sqm), Hotel Rupasi Bangla(2.04Sqm), Federal Bank(3.25Sqm), M-Bazar Box No.1(9.12Sqm), No.2 (2.04Sqm),Outside Smart Bazar(2.02Sqm), Santi Kunja Box No.1(5.06Sqm), No.2(3.25Sqm), Outside Belvedere Building Box No.1(3.25Sqm),No.2(3.25Sqm), Bidhannagar Pouranigam Borough 2 Office(5.06Sqm), Pump Room(3.25Sqm), Surya Apartment (3.71Sqm), Shyam Vihar Phase-I Outside(9.12Sqm), Charigram School(5.06Sqm), Sarkar Bagan Box No.1 (5.06Sqm), No.2 (5.06Sqm),Isha & Disha Apartment (5.06Sqm),Rani Apartment (6.60Sqm),Durga Bhawan (4.83Sqm), Burman House-RH45/5 (3.25Sqm), Raghunathpur Uttar Para (6.60Sqm),Surendra Apartment (5.06Sqm),Annapurna Apartment (3.25Sqm),Apollo Pharmacy (Raghunathpur Balaka Sangha) (3.25Sqm), Outside Anupama Phase-4(6.60Sqm), Koyla Vihar Abhinandan-Gate (3.25Sqm), Yamuna Block (3.25Sqm),Exit Gate(5.06Sqm), Indrapastra Apartment Phase-III No.1(3.25Sqm), No.2(4.86Sqm).
Same as sl no.34.But for S.J. Boxes at- Anupama Housing Complex Phase-II-Building 73(2.81Sqm),81(2.81Sqm), 79(2.81Sqm), 77(2.81Sqm), 64(2.81Sqm), 70(2.81Sqm), S/Stn (2.81Sqm), Pump House (2.81Sqm), Anupama Housing Complex Phase-III-S/Stn (2.81Sqm),Pump Room (2.81Sqm),Building 87-88 (2.81Sqm),63/71(2.81Sqm) Anupama Housing Complex-Phase-I-8A Building (2.07Sqm), 9A Building (2.07Sqm), 4B Building (3.25Sqm), 3C Building (2.07Sqm), 2C Building (2.07Sqm),7C Building(2.07Sqm),15C Building (2.07Sqm),Pump House D Block(2.07Sqm),Opp Pump House D Block(2.07Sqm), 23D Building (2.07Sqm),24D Building(2.07Sqm), 37D Building (2.07Sqm),30D Building (2.07Sqm), 35D Building (2.07Sqm),29D Building (2.07Sqm),28D Building (2.07Sqm),43E Building (2.07Sqm), 46E Building (2.07Sqm),51E Building (2.07Sqm), Mangalganthi Apartment-60CC(2.81Sqm), 57CC(2.81Sqm),53DD (2.81Sqm), 55DD(2.81Sqm), Kendriya Vihar- B 1 /2(3.61Sqm), S/Stn(3.61Sqm), Canteen (3.61Sqm),B-3-4 (3.61Sqm),ST Plant(2.05Sqm), B-5-6(3.61Sqm), B-8-10(3.61Sqm), B-11-12 (3.61Sqm), B-7-9 (3.61Sqm),A-5-6(3.61Sqm),A-3-4 (3.61Sqm),B-19-20(3.61Sqm), B-17-18(3.61Sqm), B-15-16 (3.61Sqm), B-13-14(3.61Sqm), C-7-8(3.61Sqm),C-5-6 (3.61Sqm), C-1-3(3.61Sqm), Koyla Vihar Abhinandan-Yamuna Block (2.81Sqm),Exit Gate (2.81Sqm), Koyla Vihar Basundhara-1A Building (2.81Sqm) ,1B Building (2.81Sqm),10 No.Building (2.81Sqm),2 No.Building (2.81Sqm),9 No. Building (2.81Sqm),8 No.Building (2.81Sqm),3 No. Building (2.81Sqm),4 No.Building (2.81Sqm),5 No. Building (2.81Sqm).
Same as sl no.34.But for J. Boxes at- Anupama Housing Complex Phase-I-D-Block Beside S/Stn (.94Sqm), Kendriya Vihar-Opp B-3-4(1.05Sqm),Play Ground Box No.1(1.05Sqm), No.2(1.05Sqm).
ASCON ELECTRICAL CO
M/s. Global Enterprise
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .