Chief Officer Bhuj Nagarpalika
SUPPLAY AND INSTALLATION PUMPS WITH ACCESSORIES FOR BHUJ NAGARPALIKA
359370
2026-27
Open
Machineries/ Mechanical Equipment
Works
Kutch
1 document required · 1 mandatory
₹900
Chief Officer, Bhuj Nagar Palika, Bhuj
₹10,656
26 Oct 2026
26 Oct 2026
26 Oct 2026
9 Nov 2026
26 Oct 2026
120 days
NAME OF WORK :- SUPPLAY AND INSTALLATION PUMPS WITH ACCESSORIES FOR BHUJ NAGARPALIKA
Quantities Tendered Rate
Item of work Unit according to
Rate in Figure estimated quantities
Supply, installation, testing & commissioning of sewage submersible, non clog type suitable for working on three phase, 50 Hz ±
3%, 415 V ± 10%, AC supply, 1450 RPM synchronous speed with 3 core flat copper cable from pump to starter panel with
cable end terminations, all supports, clamps, pipe fittings along with mechanical seal, bearing bush, strainer etc. complete set &
following M.O.C: Casing: CI, Impeller: SS CF8M, Wearing ring & Bearing bush: Bronze, TC mechanical seal, CS / SS bearing,
SS shaft with sleeve, SS strainer & MS motor body.
Supply, installation, testing & commissioning of non clog seweage vertically mounted end suction type vertical centrifugal pump
set of required capapcity & head with suitable TEFC squirrel cage foot mounted induction motor (with minimum IE-3 efficiency
class), working on three phase 50 Hz ± 3%, 415 V ± 10% AC supply, 1500 RPM synchronous speed including suitable
provision of extended shaft of 2 meters length to couple with motor along with base frame, coupling with guard, foundation bolts,
strainer etc. complete set as per relevant IS & following M.O.C: Casing: 1.5 to 2% Ni. CI; Impeller & wearing ring: SS / CF8M,
Shaft with sleeve: SS & Base frame: CI; Guide Pipe: SS.
DOL / Star Delta starter suitable for local & remote pump control application consisting of MPCB, overload relay and
contactorsas per Type II coordination including digital voltmeter, analogue ammeter with selector switch, run hour meter,
requiredprotective relays & control accessories.
2.00 D.O.L starter for 3 HP 6924.00 NOS
1.00 S.D. starter for 10 HP 9128.00 NOS
1.00 S.D. starter for 12.5 HP 11119.00 NOS
PVC insulated flat submersible cable as per detailed technical specifications of R/C of GWSSB conforming to IS 694, IEC
60.00 For 3 HP (D.O.L. starter) 120.00 RMT
30.00 For 10 HP ( S.D.starter) 120.00 RMT
30.00 For 12.5 HP ( S.D.starter) 120.00 RMT
Quantities Tendered Rate
Item of work Unit according to
Rate in Figure estimated quantities
Providing & Supplying of ISI Marked High Density Poly Ethylene (HDPE - PE-100) Pipes in standard length suitable for Sewage
& Industrial Effluents as per IS Specification no. 14333-1996 or its latest revision / amendments including all local & central
taxes & duties, freight charges, loading, unloading & conveyance to departmental stores etc. complete.
50.00 90 MM DIA 10kg/cm2 268.00 RMT
Supply, Testing and Commissioning (SITC) of Silent Type Diesel Generating (DG) Set(s) of prime power rating (kVA) as
specified, complete as a packaged system, conforming to CPCB IV+ (or better) emission norms, and complying with all
applicable statutory requirements, codes and standards including (but not limited to) IS 4722:1968, IS 13364 (Part 2) and BS
5514 (latest editions/amendments). The DG set shall be suitable for 415 V ±10%, 50 Hz ±5%, 3-phase, 4-wire operation at
lagging power factor, 1500 RPM, for tropical conditions, and shall be capable of delivering 10% overload for one (1) hour after
twelve (12) hours of continuous operation (ISO 8528), unless otherwise stated by the OEM. The scope shall include complete
accessories, interconnections, foundations/anti-vibration arrangements, exhaust system, acoustic enclosure, earthing (as
required), consumables for first commissioning, and all works necessary to render the installation fully functional and compliant,
as directed by the Engineer-in-Charge (EIC). Factory testing shall be carried out with fuel and load bank at 0.8 power factor and
the DG set shall be offered for inspection prior to dispatch. The DG set shall be provided with a durable QR code/label fixed on
the enclosure/control panel, linking to a document repository containing (as a minimum) approved GA drawings, wiring
diagrams, foundation and installation details, OEM catalogues, operating & maintenance manuals, factory test reports, type test
certificates (where applicable), warranty certificate, geo-tag of manufacturing location, and rating plate data as per relevant
IS/BS/ISO requirements. The OEM/Contractor shall provide a Remote Monitoring System (RMS) with minimum one (1) year
connectivity (SIM/data plan/server access as applicable), including dashboard access, user ID/password, and data download
facility. RMS shall, at minimum, capture and report: DG status (Auto/Manual/Off), start/stop events, kW/kVA/kVAR, V/I/Hz, PF,
run hours, fuel level, battery voltage, alarms/trips with time stamp, and GPS/location (where supported). All
licences/subscriptions required for the stated period shall be included in the quoted price.
(A) Diesel Engine:
Turbocharged, 4-stroke, water-cooled, multi-cylinder diesel engine, suitably rated for the specified DG set prime rating at site
conditions, complete with dynamically balanced flywheel, heavy-duty engine mounting, and electric starting arrangement. The
engine governing shall be electronic (isochronous/droop as per OEM standard) and shall comply with ISO 8528/BS
requirements for steady-state speed regulation. Engine shall be complete with dry type air cleaner with restriction indicator, lube
oil cooler (if required), radiator/cooling package (as applicable), and all sensors/switches required for protections and
annunciation. The engine shall be capable of 10% overload for one (1) hour after twelve (12) hours continuous operation and
shall be suitable for continuous duty under tropical ambient conditions. The offered engine model shall be CPCB IV+ compliant
and shall be supplied with complete emission control/after-treatment system (including DEF/urea dosing where applicable)
along with all accessories, tanks, pumps, heaters and controls required for compliant operation. The supply shall include first fill
of lubricating oil, coolant and consumables required for initial commissioning and testing. All fasteners, couplings, guards,
hoses and standard/recommended accessories required for safe and reliable operation shall be included and shall be subject to
inspection/approval by the EIC.
(B) Engine-Mounted Instrumentation/Control Panel:
Engine-mounted instrument/control panel shall be microprocessor based, with LCD/LED display, event log and alarm/trip
annunciation, complete with all wiring, harnesses and terminations. Indications/protections shall include (minimum) the following
and any additional protections recommended by the OEM: (i) Start/Stop key switch and/or push buttons with emergency stop;
(ii) Output breaker: suitably rated 4-pole ACB/MCCB/MCB as applicable, with minimum 25 kA rupturing capacity (or as per fault
level at site, whichever is higher), with shunt trip where required; (iii) Jacket water/coolant temperature – indication and high
temperature alarm/trip; (iv) Lube oil pressure – indication and low pressure alarm/trip; (v) Lube oil temperature (where provided)
– indication/alarm; (vi) Battery charging indication, battery voltage indication and charging failure alarm; (vii) Engine speed
(RPM) indication and overspeed trip; (viii) Engine running hours meter (non-resettable); (ix) Fuel level indication and low fuel
alarm; (x) Fail-to-start / crank fail alarm; (xi) Under/over frequency and under/over voltage protection (alternator side) as
applicable; (xii) Common alarm and common trip indication with potential-free contacts for BMS/remote annunciation. All
meters/indications shall be of proven industrial quality and the panel shall be wired, ferruled and labelled. The contractor shall
submit wiring diagrams, protection settings and datasheets for approval prior to dispatch/installation.
(C) Alternator:
(A) Diesel Engine:
Turbocharged, 4-stroke, water-cooled, multi-cylinder diesel engine, suitably rated for the specified DG set prime rating at site
conditions, complete with dynamically balanced flywheel, heavy-duty engine mounting, and electric starting arrangement. The
engine governing shall be electronic (isochronous/droop as per OEM standard) and shall comply with ISO 8528/BS
requirements for steady-state speed regulation. Engine shall be complete with dry type air cleaner with restriction indicator, lube
oil cooler (if required), radiator/cooling package (as applicable), and all sensors/switches required for protections and
annunciation. The engine shall be capable of 10% overload for one (1) hour after twelve (12) hours continuous operation and
Quantities shall be suitable for continuous duty under tropical ambient conditions. The offered engine model shall be CPCB IV+ compliant Tendered Rate
estimated but and shall be supplied with complete emission control/after-treatment system (including DEF/urea dosing where applicable)
Item of work Unit according to
along with all accessories, tanks, pumps, heaters and controls required for compliant operation. The supply shall include first fill Rate in Figure estimated quantities
of lubricating oil, coolant and consumables required for initial commissioning and testing. All fasteners, couplings, guards,
hoses and standard/recommended accessories required for safe and reliable operation shall be included and shall be subject to
inspection/approval by the EIC.
(B) Engine-Mounted Instrumentation/Control Panel:
Engine-mounted instrument/control panel shall be microprocessor based, with LCD/LED display, event log and alarm/trip
annunciation, complete with all wiring, harnesses and terminations. Indications/protections shall include (minimum) the following
and any additional protections recommended by the OEM: (i) Start/Stop key switch and/or push buttons with emergency stop;
(ii) Output breaker: suitably rated 4-pole ACB/MCCB/MCB as applicable, with minimum 25 kA rupturing capacity (or as per fault
level at site, whichever is higher), with shunt trip where required; (iii) Jacket water/coolant temperature – indication and high
temperature alarm/trip; (iv) Lube oil pressure – indication and low pressure alarm/trip; (v) Lube oil temperature (where provided)
– indication/alarm; (vi) Battery charging indication, battery voltage indication and charging failure alarm; (vii) Engine speed
(RPM) indication and overspeed trip; (viii) Engine running hours meter (non-resettable); (ix) Fuel level indication and low fuel
alarm; (x) Fail-to-start / crank fail alarm; (xi) Under/over frequency and under/over voltage protection (alternator side) as
applicable; (xii) Common alarm and common trip indication with potential-free contacts for BMS/remote annunciation. All
meters/indications shall be of proven industrial quality and the panel shall be wired, ferruled and labelled. The contractor shall
submit wiring diagrams, protection settings and datasheets for approval prior to dispatch/installation.
(C) Alternator:
Synchronous, brushless alternator of appropriate kVA rating, 415 V, 3-phase, 50 Hz, 1500 RPM, 0.8 lagging PF, continuous
duty, dynamically balanced rotor, self-cooled, self-excited and AVR regulated. Enclosure shall be SPDP, minimum IP23.
Insulation shall be Class H with suitable tropicalization; temperature rise shall be within limits of the applicable standard. The
alternator shall comply with IS 13364 (Part 2), IS 4722 and/or BS 2613 (latest), as applicable. Voltage regulation with AVR shall
be within ±1.0% (steady state) or OEM standard whichever is better. The alternator shall be capable of 10% overload for one (1)
hour after twelve (12) hours of continuous operation. Harmonic distortion shall be suitable for non-linear loads; alternator shall
be equipped with appropriate AVR features (e.g., soft start, UFRO) and shall be suitable for motor starting duties typical to the
installation. Terminals shall be brought out to a terminal box with adequate space for termination and shall include earthing
terminals. All routine/type test certificates (as applicable) shall be submitted for acceptance.
(D) Base Frame & Foundation: Engine and alternator shall be mounted on a suitably designed, fabricated MS channel base
frame with stiffeners, lifting arrangement and coupling guard, duly painted/treated for corrosion protection. The set shall be
installed on an adequately designed cement concrete foundation/pedestal with anchor bolts, pockets, grouting and anti-vibration
mounts (AVMs) / spring isolators as per OEM recommendations and site conditions. Vibration levels shall be within OEM
permissible limits. The contractor shall be responsible for alignment, levelling, tightening torque and re-check after load trial,
complete in all respects.
(E) Fuel Tank: In-built/base fuel tank fabricated from minimum 3 mm thick MS sheet, duly leak-tested, complete with filling
arrangement, vent, drain, cleaning opening, level indication and isolation valve(s). The capacity shall be adequate for minimum
eight (8) hours continuous operation at full load. Fuel piping between tank and engine shall be MS ‘C’ class pipes of suitable
diameter with compatible flexible connections (where required), complete with all valves, clamps, supports, unions and fittings.
Any additional safety provisions required by local fire authority/UGVCL/competent authority (such as double wall/bunding, flame
arrestor, etc.) shall be provided within the quoted scope.
(F) Exhaust System: Heavy-duty residential type exhaust silencer suitable for CPCB IV+ installation (with DEF/after-treatment
system wherever applicable) along with exhaust piping of required length, bends, supports and flexible bellow, complete with
rain cap, drain arrangement and all accessories. Exhaust piping shall be thermally insulated/lagged and cladded where required
to ensure personnel safety and to limit heat radiation inside the DG room/enclosure. The complete exhaust arrangement shall
be designed such that engine exhaust back pressure remains within OEM permissible limits and shall comply with applicable
statutory and safety requirements.
(G) Starting System:
12 V / 24 V DC electric starting system (as per OEM design) comprising starter motor(s), battery charger/alternator charging
arrangement, relays, cabling and terminals, complete with maintenance-free batteries of suitable Ah capacity to ensure
minimum three (3) consecutive cranking attempts. System shall include battery isolator and indication of charging
healthy/failure. All battery interconnections shall be with crimped lugs, insulated sleeves and proper supports, complete in all
(H) Acoustic and Weatherproof Enclosure: Acoustic enclosure shall be factory-fabricated, weatherproof and corrosion
protected, suitable for outdoor installation, with minimum IP65 protection (or better) for the enclosure body. Enclosure design
Insulation shall be Class H with suitable tropicalization; temperature rise shall be within limits of the applicable standard. The
alternator shall comply with IS 13364 (Part 2), IS 4722 and/or BS 2613 (latest), as applicable. Voltage regulation with AVR shall
be within ±1.0% (steady state) or OEM standard whichever is better. The alternator shall be capable of 10% overload for one (1)
hour after twelve (12) hours of continuous operation. Harmonic distortion shall be suitable for non-linear loads; alternator shall
be equipped with appropriate AVR features (e.g., soft start, UFRO) and shall be suitable for motor starting duties typical to the
installation. Terminals shall be brought out to a terminal box with adequate space for termination and shall include earthing
terminals. All routine/type test certificates (as applicable) shall be submitted for acceptance.
Quantities (D) Base Frame & Foundation: Engine and alternator shall be mounted on a suitably designed, fabricated MS channel base Tendered Rate
estimated but frame with stiffeners, lifting arrangement and coupling guard, duly painted/treated for corrosion protection. The set shall be
Item of work Unit according to
installed on an adequately designed cement concrete foundation/pedestal with anchor bolts, pockets, grouting and anti-vibration Rate in Figure estimated quantities
mounts (AVMs) / spring isolators as per OEM recommendations and site conditions. Vibration levels shall be within OEM
permissible limits. The contractor shall be responsible for alignment, levelling, tightening torque and re-check after load trial,
complete in all respects.
(E) Fuel Tank: In-built/base fuel tank fabricated from minimum 3 mm thick MS sheet, duly leak-tested, complete with filling
arrangement, vent, drain, cleaning opening, level indication and isolation valve(s). The capacity shall be adequate for minimum
eight (8) hours continuous operation at full load. Fuel piping between tank and engine shall be MS ‘C’ class pipes of suitable
diameter with compatible flexible connections (where required), complete with all valves, clamps, supports, unions and fittings.
Any additional safety provisions required by local fire authority/UGVCL/competent authority (such as double wall/bunding, flame
arrestor, etc.) shall be provided within the quoted scope.
(F) Exhaust System: Heavy-duty residential type exhaust silencer suitable for CPCB IV+ installation (with DEF/after-treatment
system wherever applicable) along with exhaust piping of required length, bends, supports and flexible bellow, complete with
rain cap, drain arrangement and all accessories. Exhaust piping shall be thermally insulated/lagged and cladded where required
to ensure personnel safety and to limit heat radiation inside the DG room/enclosure. The complete exhaust arrangement shall
be designed such that engine exhaust back pressure remains within OEM permissible limits and shall comply with applicable
statutory and safety requirements.
(G) Starting System:
12 V / 24 V DC electric starting system (as per OEM design) comprising starter motor(s), battery charger/alternator charging
arrangement, relays, cabling and terminals, complete with maintenance-free batteries of suitable Ah capacity to ensure
minimum three (3) consecutive cranking attempts. System shall include battery isolator and indication of charging
healthy/failure. All battery interconnections shall be with crimped lugs, insulated sleeves and proper supports, complete in all
(H) Acoustic and Weatherproof Enclosure: Acoustic enclosure shall be factory-fabricated, weatherproof and corrosion
protected, suitable for outdoor installation, with minimum IP65 protection (or better) for the enclosure body. Enclosure design
shall provide adequate fresh air intake and hot air discharge for engine radiator and alternator cooling such that the internal
temperature rise remains within OEM limits at full load. Provision shall be made for safe access/maintenance including lockable
doors, viewing window (where provided), emergency stop access, and cable entry glands. Noise level of the complete DG set
with enclosure shall not exceed 75 dB(A) measured at 1.0 m distance in free field conditions, in accordance with applicable
CPCB requirements. The enclosure shall comply with CPCB IV+ (or better) requirements and other applicable local
rules/regulations. All louvers, acoustic infill/insulation, fasteners and sealing arrangements shall be of fire-retardant/industrial
grade as per OEM standard. Any deviation from the specified noise/IP requirements shall be treated as non-compliance unless
explicitly approved by the EIC in writing.
Erection, testing, commissioning and satisfactory performance demonstration shall be carried out as per site requirements and
as directed by the Engineer-in-Charge. The scope shall include pre-commissioning checks, insulation resistance tests, no-load
and load trials, safety/protection checks, and performance test on load bank (where directed) with submission of test records.
The contractor shall provide initial consumables including first fill of diesel fuel (minimum up to 80% of fuel tank capacity),
lubricating oil, coolant, etc. required for commissioning and the specified tests. The bidder/OEM shall provide comprehensive
warranty/guarantee for the complete DG system (engine, alternator, control panels, RMS, enclosure and all accessories) for a
minimum period of two (2) years from the date of commissioning/handing over, whichever is later, covering defects in materials
and workmanship. During warranty, all spares/repairs/replacements and visits required to maintain the DG set in serviceable
condition shall be carried out at no additional cost. All necessary statutory approvals, inspections, testing and certification from
the Electrical Inspector/competent authority (including provision, testing and sealing of energy meter(s) wherever applicable)
shall be arranged and obtained by the contractor within the quoted scope and time, at no extra cost. Required O&M manuals, as-
built drawings, warranty certificates and training to operating staff shall be provided prior to handing over.
Note: The DG set specifications shall comply with the latest CPCB guidelines/notifications and all applicable local
rules/regulations prevailing as on the last date of tender submission applicable local rules/regulations prevailing as on the last
date of tender submission
healthy/failure. All battery interconnections shall be with crimped lugs, insulated sleeves and proper supports, complete in all
(H) Acoustic and Weatherproof Enclosure: Acoustic enclosure shall be factory-fabricated, weatherproof and corrosion
protected, suitable for outdoor installation, with minimum IP65 protection (or better) for the enclosure body. Enclosure design
shall provide adequate fresh air intake and hot air discharge for engine radiator and alternator cooling such that the internal
temperature rise remains within OEM limits at full load. Provision shall be made for safe access/maintenance including lockable
doors, viewing window (where provided), emergency stop access, and cable entry glands. Noise level of the complete DG set
Quantities with enclosure shall not exceed 75 dB(A) measured at 1.0 m distance in free field conditions, in accordance with applicable Tendered Rate
estimated but CPCB requirements. The enclosure shall comply with CPCB IV+ (or better) requirements and other applicable local
Item of work Unit according to
rules/regulations. All louvers, acoustic infill/insulation, fasteners and sealing arrangements shall be of fire-retardant/industrial Rate in Figure estimated quantities
grade as per OEM standard. Any deviation from the specified noise/IP requirements shall be treated as non-compliance unless
explicitly approved by the EIC in writing.
Erection, testing, commissioning and satisfactory performance demonstration shall be carried out as per site requirements and
as directed by the Engineer-in-Charge. The scope shall include pre-commissioning checks, insulation resistance tests, no-load
and load trials, safety/protection checks, and performance test on load bank (where directed) with submission of test records.
The contractor shall provide initial consumables including first fill of diesel fuel (minimum up to 80% of fuel tank capacity),
lubricating oil, coolant, etc. required for commissioning and the specified tests. The bidder/OEM shall provide comprehensive
warranty/guarantee for the complete DG system (engine, alternator, control panels, RMS, enclosure and all accessories) for a
minimum period of two (2) years from the date of commissioning/handing over, whichever is later, covering defects in materials
and workmanship. During warranty, all spares/repairs/replacements and visits required to maintain the DG set in serviceable
condition shall be carried out at no additional cost. All necessary statutory approvals, inspections, testing and certification from
the Electrical Inspector/competent authority (including provision, testing and sealing of energy meter(s) wherever applicable)
shall be arranged and obtained by the contractor within the quoted scope and time, at no extra cost. Required O&M manuals, as-
built drawings, warranty certificates and training to operating staff shall be provided prior to handing over.
Note: The DG set specifications shall comply with the latest CPCB guidelines/notifications and all applicable local
rules/regulations prevailing as on the last date of tender submission applicable local rules/regulations prevailing as on the last
date of tender submission
1.00 (A) Continuous Rating of 10 KVA ,BHP not less than 15 BHP 348585.00 Each
Note : gst will be paid as per government rules.
I/We am/are willing to carry out the work @............... % above/below ( Percent should be written in figures and
words ) The tendered amount mentioned above amount of my /our tender works out as under
Tendered amount Rs……………………….. Tendered amount Rs………………………..
Add ……...% above Rs…………………. Deduct ……...% Below Rs………………….
(Please strike out which ever is not applicable )
All work shall be carried out as per public works department handbook and other specifications of division or as directed.
Rates quoted inclusive of clearance of sight (prior to commencement of work and at its close) in all respect
and hold good for work under all conditions , sight, moisture, weather etc
one percent labor cess will be deducted from the valued work done as per ' Bulding and other construction
work welfare cess act' G.R. No. GHR - 2005/04/CWA/2004/841/M-3 Dt. 31/01/2005
Signature of the Contractor.
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
RAW_HTML
1. Standard Bidding Document Book.pdf
2.Invitation.pdf
3. Sch-B.pdf
4 Terms and Conditions.pdf
5.PQ Criteria.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .