Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance YASHWANT NAGAR KHARADI PUNE 14 | PUNE | PUNE | MAHARASHTRA | 411014 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
15 Oct 2020, 6:00 pmClosed
Executive Engineer Dhule Irrigation Division Dhule
Executive Engineer Dhule Irrigation Division Dhule Sinchan Bhavan Sakri Road Dhule
Preparation of detailed report of Emergency Action Plan and Dam Break Analysis in all respect as per Dam Safety Manual
2020_TIDC_612718_1
E Quotation No. 2 for 2020-21
Open Tender
Consultancy
Item Wise
180 days
Dhule
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
17 Oct 2020
1 Oct 2020
17 Oct 2020
1 Oct 2020
15 Oct 2020
1 Oct 2020
Collection of data as described in below Sr. No. a required for Preparing & submitting report of computerized Emergency Action Plan (EAP) and Dam break Analysis / Study in as per Dam Safety Manual Chapter-8, CWC guidelines for developing emergency action plan of Dam's 2016, CWC guidelines for development & implementation of emergency action plan of Dam's 2006, Technical circular of MERI Nasik No.DSO/PB-4/1582 dated 16/11/2015 & as per the latest government guidelines complete in all respect as directed by the Engineer in charge at all stages. All the technical, non technical staff, Assistants, Labors & vehicle required to collect the following data. i. Introductory, Identification of downstream Inundation Areas, developing notification flowchart & Inundation maps, detection of emergency, Responsibilities, Emergency procedures, probable damage of live stock or property in the flood affected area, Preventive actions. ii. Preparing all the village/wadi/pada/industrial area's boundary wise detailed drawings with 0.50 m. contour interval by using standard software and superimposing it on village map with scale 1:5000 showing Dam Break Flood Lines i.e. Prohibited line( Blue line), Restricted line (Red line) & Caution Zone (Green Line) along with mapping of structures & other important details etc. required for EAP. iii. Appendices & Tables of Information as prescribed in Dam Safety Manual Chapter - 8, CWC guidelines for developing emergency action plan of Dam's 2016, CWC guidelines for development & implementation of emergency action plan of Dam's 2006. .......... (as per notice) 0 to 1,000
1,00,001 & above
Chetak Engineers
Ashish S Waghchaure
SKY TECHNOLOGIES
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .