Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹36.7 LAccepted-AOC P NO 946 WALAYAR POST PALAKKAD 678624 | PALAKKAD | PALAKKAD | KERALA | 678624 | ₹36.7 L | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | MALABAR CEMENTS LABOUR CONTRACT COOP SOCIETY LTD L1 |
|---|---|---|---|---|
| 1.00Loading of packed cement into Wagons | ||||
| 1.01 | Loading of packed cement bags into Wagons including transporting the required number of printed bags from Packing Plant bag go-down to packer machine and attend to the works in connection with filling of cement in bags with machine, such as positioning of the bags properly for filling, positioning of packed bags on the longitudinal/ radial conveyor, diverting bags at the diverter points, loading & stacking of cement bags inside the wagons as per the directions of the tally checker/ concerned authority of the Company in the shift. Starting/ Stopping of the main belt, wagon loading belts, wagon loading machine, inspection and thorough cleaning immediately after loading and any other work incidental to the above etc. complete | 54,000 | MT | 70 ₹37.8 L |
Tender Value
Refer Docs
EMD Value
₹50,000
Closing Date
11 Mar 2026, 5:00 pmClosed
MANAGING DIRECTOR
MALABAR CEMENTS LTD, WALAYAR PO, PALAKKAD
Loading of Packed Cement into Railway Wagons
2026_MCL_834167_2
MCL/PP/ET-1/2026-27
Open Tender
Miscellaneous Services
365 days
MALABAR CEMENTS LTD, WALAYAR PO
Please refer to tender document
5 documents required · 5 mandatory
₹2,950
Yes
₹50,000
Yes
8 Apr 2026
23 Feb 2026
13 Mar 2026
23 Feb 2026
11 Mar 2026
23 Feb 2026
Loading of packed cement into Wagons
Loading of packed cement bags into Wagons including transporting the required number of printed bags from Packing Plant bag go-down to packer machine and attend to the works in connection with filling of cement in bags with machine, such as positioning of the bags properly for filling, positioning of packed bags on the longitudinal/ radial conveyor, diverting bags at the diverter points, loading & stacking of cement bags inside the wagons as per the directions of the tally checker/ concerned authority of the Company in the shift. Starting/ Stopping of the main belt, wagon loading belts, wagon loading machine, inspection and thorough cleaning immediately after loading and any other work incidental to the above etc. complete
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
techsummary_1414243.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.06 MB
DOCUMENT.pdf
Tender Documents • 0.21 MB
BOQ_1414243.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid