Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 38 22 39 PLOT NO C11 SRI TOWER ROAD NO 10 INDUSTRIAL ESTATE INDUSTRIAL ESTATE KANCHARAPALEM VISAKHAPATNAM VISAKHAPATNAM ANDHRA PRADESH 530007 | VISAKHAPATANAM | ANDHRA PRADESH | 530007 | Admitted-Finance |
| 2 | Admitted-Finance A 183 TTC INDUSTRIAL AREA KHAIRANE MIDC THANE BELAPUR ROAD NAVI MUMBAI THANE MAHARASHTRA 400705 | THANE | MAHARASHTRA | 400705 | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
21 Apr 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Manager SRC-Com
SR Complex Hindustan Shipyard Limited Gandhigram Visakhapatnam 530 005
Routines on Propeller shafts, Rudders and Bow Thrusters on MV Swaraj Dweep
2021_HSL_85733_1
20/MV Swaraj Dweep/006/2021-22
Open Tender
Miscellaneous Services
Service
20 days
HSL Visakhapatnam
Please refer Tender documents.
7 documents required · 7 mandatory
₹0
Exempted
28 Apr 2021
16 Apr 2021
21 Apr 2021
16 Apr 2021
21 Apr 2021
16 Apr 2021
120 days
Amount
PROPELLERS (PORT & STBD)
The following routines are to be carried out on PROPELLERS (Port & Stbd), Removal and fitment of propellers by using Hydraulic power pack and Lifting jacks.for required materials,Consumables,Hydraulic power pack,Jacks,Special tools,Measuring instruments,Tallow,Cement,Grease,Varnish,O-rings,Tarpauilns are covered in contractor scope.
Each Surface area: 5.7 sq. mtrs,Solid four blades. 4000 mm dia Each,Pitch : 3168 mm
Rope guard to be removed and fit back after inspection.
Propeller drop measurements to be taken and recorded.
Propeller to be sand disc and polish, any damages to the edges to attend as required.
All readings to be taken in presence of the ship staff and report to be submitted to attending surveyors. All above to be considered for both propellers.
TAIL SHAFT SURVEY (Oil lubricated ), Starboard.
PROPELLER: Keyless, hydraulically tightened. Propeller to withdraw as per maker's instructions. Propeller push up to be done as per push- graph. Propeller cone to be filled with tallow after completion of job.Fit back 04 nos rope cutters & anode rings. Rope cutters & anode rings - Ship supply. Tallow -to be supplied by contractor. Propeller to jack up and fit back. Final clearances on propeller to be taken and same to be verified with initial readings
SKF coupling (hydraulic) to open-up from the shaft tunnel to necessitate removal of the tail shaft outside. Coupling to fit back and tighten as per procedure after tail shaft survey and seal renewal. Tail shaft to be withdrawn outside safely as per procedure and same to be placed on dock floor or taken to yard workshop for inspection and survey. After completion of works and survey, tail shaft is to be fitted back in its position as per procedure.
Tail shaft, stern tube bearings, tapper cone and coupling area to be inspected for any cracks after thorough cleaning. Tail shaft measurements, Stern Bush bearing internal measurements and chrome liners calibration to be taken and recorded. Tail shaft, stern tube bearings and chrome liners to be presented for survey. M.P.I test to be done on tailshaft in presence of class / flag surveyors and report to be submitted.
SHAFT SEAL: Simplex Compact type. Lub oil to be drained and FWD, AFT seals to be removed along with chrome liners. Seal assembly to be dismantled as per procedure and parts to clean, inspect. Chrome liners if found grooved , same to be skimmed as per maker's instructions, Fwd & Aft seals to be assembled with new seal rings as per procedures. After tail shaft inspection and survey, FWD,and AFT Seal assembly to fit back.(Seals - Ship's supply). Lub oil to be filled in Fwd, Aft seal chambers and entire stern tube system including header tanks. Stern tube system to be kept under static pressure for 24 hrs at least. Lub oil - ship supply. While attending repairs, Oil leak if any seal assemblies to be rectified to the satisfaction of ship staff & surveyors prior undocking.
SHAFTING AND SHAFT BEARINGS (PORT) - SURVEY
The following Intermediate shaft bearings to open-up, dismantle and offer for survey. Any recommendation by surveyor, the same is to be attended and rectified to the satisfaction of surveyor/ss/HSL. After survey same to box back. Bearing clearances to be taken before opening and after finishing the job. 1. Port Intermediate shaft bearing bearing #3, 2. Port Intermediate shaft bearing bearing #4.
RUDDER ( PORT & STBD )
RUDDER (TWIN) HEINZ - J. HENZE GMBH ( Port & Stbd ) to be removed,kept on jetty,the following routines to be carried out,fitted back,removal and fitment of Rudders by using Hydraulic power pack and lifting jacks.for required materials,consumables,hydraulic power pack,jacks,special tools,measuring instruments,fish oil,cement,drain plugs, are covered in contractor scope.
HAMBURG GERMANY,TYPE R 3000 K 490 / 12, FLAP RUDDER
06 nos drain plugs to be opened and check for water ingress. Rudders pressure testing is to be carried out by water coloumn as per procedure. After rudder pressure testing and rudders are to float coat (Float coat to be applied in rudder internals), all plugs to be fittedback and satisfactory vacuum test on each plug to be shown. Finally, plugs to be covered with cement properly.
The following are to be carried out on both P & S Rudders in presence of SS/HSL. A) Rudder pin clearance to be taken and recorded (Qty - 06 nos). B) Clearance between seating of rudder stock cone and rudder blade to be taken and recorded (Qty - 02 nos). C) Pintle nut to be inspected for tightness.(Qty - 02 nos) D) Jumping clearances & rudder drop measurement to be taken and recorded.All clearances and measurements to be taken in presence of ship staffs and report to be submitted.All readings to be presented to attending surveyors as part of docking survey.
BOW THRUSTER PROPELLER
MAKE: ULSTEIN PROPELLER A/S,TYPE : 375 TV-C,CONTROLLABLE PITCH,DIA: 2150 MM, 04 BLADES,
Propeller to be sand disc and polish, any damages to the edges to attend as required.apply the grease/varnish. Satisfactory Bow thruster operation to show after undocking. Bow thruster gratings to be removed and refitted,all securing bolts/lock plate welding to be carried out. Bow Thruster tip clearances are to be taken and recorded in presence of SS/HSL.
KALATHIL BROTHERS CONSTRUCTION CO. PVT. LTD.
prabhu engineering works
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
RAO ELECTRICAL ENGINEERING WORKS
JAMI HYDRAULIC
VOYAGER MARINE SERVICES INDIA PRIVATE LIMITED
Goltens India Private Limited
Asha Engineering Works
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .