| # | Company | Status |
|---|---|---|
| 1 | Accepted-Technical 701 7TH FLOOR LE MERIDIEN COMMERCIAL TOWER RAISINA ROAD NEW DELHI SOUTH DELHI DELHI 110019 | SOUTH EAST DELHI | DELHI | 110019 | Accepted-Technical Documents found in order |
| 2 | Accepted-Technical | Accepted-Technical Documents found in order |
| 3 | Accepted-Technical D NO 4 171 7 VISHWAKAMAL BUILDING SECOND FLOOR BAIKAMPADY DAKSHINA KANNADA KARNATAKA 575011 UDYAM KR 11 0000612 | DAKSHINA KANNADA | KARNATAKA | 575011 | Accepted-Technical Documents found in order |
| 4 | Not Admitted-Fee/PreQual/Technical | Not Admitted-Fee/PreQual/Technical Others-Not admitted due to non-submission of deficient documents within stipulated time during TPC stage-I(2nd Meeting) |
| 5 | Not Admitted-Fee/PreQual/Technical 1410 TO 1425 COMMERCIAL A WING THE EPICENTER OFF EASTERN FREEWAY BEST COLONY CHEMBUR MUMBAI MAHARASHTRA 400071 | MUMBAI SUBURBAN | MAHARASHTRA | 400071 | Not Admitted-Fee/PreQual/Technical Others-Not admitted due to firm submitted Bid Security Declaration Certificate with mentioning incorrect NIT No date and name of services as per NIT Chapter-VII clause No.6 Appendix – 10(A) |
Tender Value
Refer Docs
EMD Value
₹7.6 L
Closing Date
21 Oct 2025, 5:00 pmClosed
Office of the Officer Commanding, Water Wing,
OC water wing, WW Rajarhat FTR HQ BSF South Bengal Action area-II, Newtown Kolkata-700161
1st Dry Dock repair and maintenance of Medium Craft Premsagar
2025_BSF_877624_1
WWR/Marine/1st DDR MC Premsagar/606/24-25/9540-42
Open Tender
Marine Services
Works
180 days
HASNABAD KOLKATA WEST BENGAL
As per Tender documents
10 documents required · 10 mandatory
₹0
₹7.6 L
Yes
HQ WATER WING RAJARHAT
12 Jun 2026
16 Sept 2025
24 Oct 2025
17 Sept 2025
21 Oct 2025
26 Sept 2025
17 Sept 2025 - 25 Sept 2025
24 Sept 2025
After cooler required to be flushed and servicing.
Defective hose pipes of both main engines including silencer hose pipe required to service. Check all the belts, if found any defect, replace it as per OEM. All defective hose clamps of Engine rooms are required to be replaced with heavy duty SS clamps
Check & service all sensor if any sensor not in working condition, then it must be replaced with new
The inlet blower and outlet blower open space need to be covered with net to avoid entry of foreign objects.
Check the Vibration damper of main engine if any clearance/defective required to be replaced with new. Engine mounting isolator to be serviced and bolts required to be checked for proper alignment. Defective isolator need replacement
Self-starter & Alternator to be serviced and defective carbon bushes need replacement. Injector required to be serviced and calibrated.
Sea water pipes of Main engine required to be chemically cleaned and it should be completely free of salt /foreign deposits. Any pipe reduced gauge to be replaced.
Complete cleaning of exhaust pipes required to done and if any piece deteriorated need replacement. Check Asbestoses cloth of exhaust pipes of main engines if defective required to be replaced. Exhaust manifold & inlet manifold to be serviced.
Heat exchanger of Main engines required to be cleaned/ flushed and servicing
Engine harness required to be checked and any foreign deposit to be cleaned if defective then replace harness completely.
Check the condition of Turbocharger and required to be repaired.
Control panels of Main engines in engine rooms required to serviced and defective parts need replacement.
Main engine alignment with jet propulsion unit and gear box should be done and synchronized with joystick of console.
All zinc rod (Heat exchanger, sea water line etc.) to be replaced
Engine sea water cooling outlet pipe fitted with hose need to be clamped with two clamps instead of single clamping
BATTERIES: Batteries of on board vessels required to be replaced with new. Details of batteries are under. a. Emergency Batteries- 02 Nos (12v x 200 AHC) b. Service Batteries - 02 Nos ( 12v x 200 AHC) c. Main Engines -03 Nos (12v x 200 AHC ) d. DG Set – 02 Nos (12v x 150 AHC) Total – 09 Nos secondary batteries (Amaron /Exide).
Defective Seal and gasket if any required to be replaced with new.
Defective Solenoid valve & switch and gauges required to be replaced with new one. Gear oil cooler required to be serviced. Gear box foundation to be serviced. If any mounting defect then replaced completely. .
The timing of Gear unit engages and disengages unscheduled on its own which is required to be checked and rectified.
DOCKING AND PILOTING / INSPECTION CHARGES (Inspection charges including IRS fees). Piloting/Sailing charges from Base Wksp WW BSF Hasnabad to dry dock yard and back including cost of fuel required to be mentioned
Main shaft seals STBD & PORT required to be replaced. Inspect the Main shaft seals STBD & PORT required to be replaced. Inspect the impeller and complete servicing should be carried out. Inspect the wear ring clearance, if worn beyond acceptable tolerance then to be renewed. Defective worn hoses, seals, or fittings should be replaced with new.
Inspect the jet unit housing and the surrounding hull area for structural integrity, cracks, or corrosion. Repair any damaged sections to prevent leaks or water intrusion. Ensure the intake duct is free of blockages or deformities
Steering nozzle and reverse bucket required to be serviced. Ensure that they move freely as well as not hindered by corrosion or mechanical issues. All bushes of jet buckets to be replaced.
Defective components of hydraulic system and linkages that control steering and reverse thrust required to be serviced. Lubricate all moving components to ensure smooth operation.
Replace all sacrificial anodes.
Servicing of Oil cooler of jet propulsion system required to be carried out and Hydraulic oil of Jet system required to be replaced with new.
All electronic components and system of jet propulsion installed in Tiller deck and console required to be serviced.
Defective sensors of jet propulsion system required to be replaced with new
Hydraulic oil filter of jet system required to be replaced
Doen jet propulsion auto synchronisation unexpectedly and increasing of RPM and speed. The complete software synchronisation need to be calibrated and updated to avoid auto increasing of RPM and speed,
Digital display of main engine installed in wheel house is required to be serviced and synchronized with Engines parameter. Any other defects to be rectified.
All fuel filters should be replaced with new. Fuel injectors and fuel pump required to be serviced/ calibrated. Defective fuel lines required to be replaced with new.
Heat exchanger element is defective and required to be replaced. Check the thermostat functioning replace with new one. Coolant should be replaced. (12 Ltrs. Approx.)
All type of oil filters are required to be replaced with new. Engine Oil required to be replaced. (15 ltrs approx.)
Air filter required to be replaced with new. Exhaust pipe required to be replaced. Deteriorated /damaged Asbestoses cloth and glass wool of exhaust pipe required to be replaced with new. Turbocharger required to be serviced.
Alternator and self-starter required to be serviced and replace carbon bush assembly etc. Defective belts should be replaced. Defective Control Panel Board, Electric Wiring, Harness including pressure switch, temperature switches, circuit breaker, starter relay etc required to be repaired. If non repairable to be replaced.
Check and correct the alignment between the engine and the generator to prevent excessive vibration and wear. Ensure the generator rotor is balanced to prevent abnormal vibration during operation. After serving of generator, Power output, Frequency, Voltage of generator required to be checked on full load for satisfactory service.
Defective safety shutdown systems i.e. high temperature, low oil pressure, and over-speed sensor etc. required to be replaced with new. Test all control panel functions such as the start/stop mechanisms, gauges, and alarms and necessary servicing should be carried out.
Perform a full load test to ensure the generator can handle the rated capacity without issues. Operate the generator to check for any unusual sounds, leaks, or vibrations, ensuring all repairs and adjustments are successful.
New sea water pump need to be down to existing level. So, that the pump remains under sea water level to lift the water properly
AC SYSTEM All marine ACs as mentioned below and their accessories fitted in Medium Crafts are needs to be serviced thoroughly and defective parts need replacement. All defective PCB, display board, temperature sensor with cable installed in the AC fitting of VIP Cabins, Crew Cabins, Wheel House and dining hall required to be replaced. (01 No. 2700 BTU at Wheel house, 01 No. 1800 BTU each at Crew Cabin 2 & 3, 01 Nos 1200 BTU each at VIP Cabin 1 & 2 , Total = 05 Nos.)
Sea water cooling pump of all AC i.e 05 Nos required to be replaced
All sea water mud box i.e 05 Nos required to be replaced.
AC cooling system motor, suction/delivery, strainer/Filters etc need to be serviced and made functional.
MAST REPAIR WORK Defective base plate of anchor light, navigation light, communication equipment’s main Mast, National and BSF Flag base, Main Mast bottom supporting members & brackets, Mast arm & flag hoisting arrangement etc. required to be cleaned and polishing any defect to be renewed.
NAVIGATIONAL EQUIPMENT The multifunctional digital display chart should be serviced. Inspect and test the display unit and ensure that all features are functioning properly. Additionally, all the connected navigational equipment’s with digital display should be synchronized and calibrated
One add
Echo sounder with sensor required to be made serviceable if not repairable replace with new one. Functioning of display of echo sounder required to be checked while sailing and static position of vessel.
itional dedicated display unit with Google navigational map with android auto screen and route marking facilities feed including Sunderban and inland channels etc. need to be installed. The map should indicate/ show the Nalas of 24 (N) Parganas and 24 (S) Parganas of Sunderban area for navigational purpose.
DGPS/GPS required to be serviced and calibrated
RADAR and AIS system required to be serviced and made operational. Defective parts/connection cables need to be replaced.
All Emergency Positioning Indicating Radio Beacons (EPRIB), Search and Rescue Transponder (SART) required to be serviced as per class norms.
Inspect all navigation lights (e.g., port, starboard, masthead, stern, anchor lights) for damage or malfunction. Replace any faulty bulbs, lenses, or wiring etc . Ensure the navigation lights are functioning in accordance with inland navigation rules and regulations. Test the navigation lights to ensure proper operation, especially for night time navigation and low-visibility conditions.
Loud speaker, PA equipment system to be made operational. Defective cables, mike, Speakers, Amplifier required to be serviced and make operational. Defective navigational wheel house console, Switches, Gauges, indicators and harness required to be replaced with new. Fuel gauge not working properly need to be repaired.
Inspect the anemometer & its display, and servicing and calibration should be carried out.
Inspect VHF radio /marine set antennas for corrosion or damage. Replace damaged antennas and ensure proper mounting. Test the Marine radio system for clear transmission and reception. Ensure that communication channels are working correctly for emergency and routine communication.
PIPE LINES AND VALVE All pipes of fresh water line, fuel supply lines, sewage lines, fire lines, sea water lines and bilge system lines required to be checked /pressure tested and defective/already temporary repair pipes need to be replaced. Diesel Oil Tank vent pipe, Sewage Tank Air Vent wasted portion needs to be replaced. Defective All air vents at main deck required to be renewed. Defective flanges and joints required to renew. All gasket to be replaced
All Non-returning/delivery valves defective required to be change with new one.
After replacing of defective hose pipes, valves, and gas kits, leakage testing must be done and any leakage be rectified.
Defective hose pipes need to be replaced.
All valves including sea chest valves and overboard valves required to be overhauled and to be pressure tested if fails in testing then required to be replaced with new. Various sizes of defective Valve seat, Spindle wheels, nut bolts, gasket, joints, and collar etc. of sea water, fresh water and fuel system required to be replaced.
Colour coding all valves required to be done as per marine standards. Colour coding / direction of flow of all pipes (complete portion of pipe) required to be done as per marine standards.
Defective under water sea suction line, mud box, strainers and other fixture in engine room required to be serviced. Strainer net is required to be replaced with SS/Brass/Gun Metal material instead of MS. Wasted/corroded sea water lines in engine room to be renewed as required.
Anchor Winch motor complete servicing required to be done. Defective Bearing/ bushes etc. to be replaced. Proper alignment to be done. Operating switches of Anchor installed in wheel house required to be replaced with new.
PUMPS AND MOTORS Electric Blower Motor machinery room- 02 Nos required to be serviced (bearings, bushes required to be replaced with new). Fan of blower required to be check and replace if defective
Exhaust fan motors of galley, Jawan toilet, VIP toilet required to be serviced.
Window wiper motor of wheel house front glasses and its accessories required to be serviced. Wipers are required to be replaced with new with heavy duty wipers.
Domestic fresh Water Pump and motor - 2 Nos. (01 AC and 01 DC) required to be serviced. The freshwater automatic cutoff system not working properly required to be serviced.
Fuel transfer pumps & motor-01 No required to be serviced.
Bilge & Fire Pump motor – 01 Nos required to be complete overhauled, malfunction of the auto sensor installed be restored and water pressure required to be checked. Manual bilge pump required to be repair and make operational.
Macerator (sewage discharge pump) -01 Nos required to be serviced
AWNING FITTING Awning to be repaired by providing additional longitudinal/transverse stiffeners. New Canopy cover to be provided Awning to be repaired by providing additional longitudinal/transverse stiffeners. New Canopy cover to be provided
Whenever lift or lower the rescue boat into the water using davit, the gear unit suddenly slips on its own, which increase the risk of accidents. Therefore, the gear unit needs to be properly checked and serviced, and locking system in Gear should be installed to prevent it from slipping.
DAVITS AND BOAT CRADLES Davit base plate and its fasteners are completely rusted at bottom. So that base plate of davit required to be replaced with SS plate and SS fasteners. Davit arm, pulley, gear system needs to be repaired. Davit rope required to be renewed. Gear oil leakage from gear unit of davit required to be repaired and seal of gear unit also required to be replaced with new. Cradle foundation and its rubber pads damages and required to be repaired.
ANCHOR WINCH AND CHAIN / CABLE Overhauling of compete anchor arrangement required to be carried out. Anchor chain certified and rope required to be replaced with new 45 mtrs. Anchor rollers guide/base plate required to be replaced with new Anchor guard plate also should be replaced
BATH ROOM Complete Toilet system of 04 nos bathrooms are required to be serviced (including flushing systems and motors & their accessories.)
Defective flush lever of all existing toilets to be changed with lever system type of same size or existing or be serviced. Leakage in the bathroom to be rectified
All pipe fittings of all Toilets cum bathrooms (04 Nos) to be properly cleaned, defective pipes to be replaced.
Water Taps (Jaguar brand) required to be installed instead of Defective existing leakage taps.
Mirrors of all bathrooms are required to be replaced with new mirror.
Floor of 04 Bath rooms required to be chemically cleaned. Wash basin of bathrooms required to be replaced. The drainage system of the 04 Nos bathrooms is not working properly and leakages be rectified. Non return valves are difficult to maintain. Hence, shifted/installed at place where the maintenance can be possible
Electric pump of flash out system be serviced.
Embarkation ladder 02 Nos required to be inspected, found any damage then repaired.
First aid box 02 nos. required to be renewed and latest medicine be provided.
LIFE SAVING APPLIANCES All lifesaving appliances i.e. Lifebuoys with life line - 04 Nos, Life Jackets with whistle and light – 25 Nos, replaced with normal life jackets with zip and stripes lock for crew comfort , Parachute flairs- 01 set required to be replaced with new .
Foam type fire extinguisher 50 Ltrs. required to be refilled and painting with all marking.
FIRE FIGHTING APPLIANCES Following fire extinguishers required to be replaced with new. a) Water type CO2 9 Ltrs 05 Nos. b) DCP type 6 Kgs 02 Nos. c) Foam type Fire Extinguisher 9 Ltrs 03 Nos. d) CO2 type 4.5 Kgs 01 No
All Fire hydrant/fire hose jet/spray nozzle required to be serviced and pressure should be checked, all canvas hoses required to be replaced with new.
NOVEC 1230 bottle 80 Ltrs. cylinder container Filled with 65 Kgs Novec required servicing and release station & release siren for Novec 1230 required servicing.
All Heat detector, smoke detector, General Fire alarm bells required to be serviced and made functional
DD fire pump required servicing and attachment be installed
Fire alarm system and Fire control unit to be checked and servicing should be done.
Defective wiring, switches, cables and sensors of fire alarm required to repaired/replaced.
Submersible pump with capacity 5 LPS (liter per second) fitted at the lowest keel portion in engine room to pump out bilge water in case flooding due to any valve failure is required servicing. parts.
Pressure testing of all fire lines to be carried out where ever applicable.
All defective Fire Hydrants, Fire hoses, Flanges, fittings, clamps, gaskets, nut and bolts to be repaired.
HOT PLATE SYSTEM All hot plate system 02 Nos and its arrangement required to be renewed. Defective hot plates, coils, wiring, switches etc be serviced. Replace the non-repairable parts. Utensil like Patila seating arrangement be made so that not to be touch the coil directly
All Pilots, passenger seat cover to be replaced with new.
CABIN, HATCHES , DOORS AND WINDOWS (i) 03 Nos wind screen and 01 port side bullet proof glass cracked required to be replaced with new. All wind screen to be checked and if any crack/defect need replacement without compromising the armored protection
All hatche glasses to have sunshade protection and defective condition need replacement. Hatch of wheel house in defective condition required to be repair..
All defective door locking system and handle of doors required to be replaced with new
All defective water tight door seal rubber packing required to be replaced and testing to be carried out..
Defective Hatches rubber biding to be replaced with new one.
Water leakage from wheel house roof required to be repaired properly and shower testing should be carried out..
Faded/damaged VIP cabins side wall, Galley side wall, Passenger cabin side wall , crew cabins side wall , all toilet side walls and wheel house side wall to be renewed.
GALLEY All small drawers of galley required to be serviced. Galley hot plate holding
surface completely deteriorated required to be renewed. Servicing of following equipment installed in galley required to be carried out. Microwave Oven-01 No., Food processor-01 No., Water cooler cum purifiers and RO system- 01 No, Refrigerator-01 No, Deep freezer - 01 No, Water heater/geyser -01 No.
TANKS Both (Port & STBD) Fuel tank require to be cleaned and leakage should be checked. If found any leakage it should repaired and tested by class. Reserve fuel tank at keel to be cleaned and converted to fresh water tank and necessary pipelines is fitted. Fresh water tank is required to be cleaned. Sewage Tank required to chemically cleaned, panting of all tanks should be done as per marine standard.
All wooden furniture, wall almirahs, chart table and dining table of crew cabin 3 required to be cleaned and polished. Cover of dining seat required to be replaced with new.
TVRO (TELEVISION RECEIPT ONLY) TVRO system MODEL- SUPER TRACK S6, Make- KNS along with 03 Nos Tata Play dish required to be serviced and proper functioning should be checked. One year subscription for Hindi and English channels should be recharged. All LED TV and connection be cheeked and defective required to be replaced.
MISCELLANEOUS (EXTERNAL FITMENTS) All Floor (including wheel house VIP cabin and crew cabin) required to be replaced by PVC Lelonium sheet superior quality with proper layout of floor. Anti-skidding floor cover of crew cabins, wheel house, VIP cabins required to be replaced with new.
Window curtain in VIP cabins required to be installed. One curtain to cover complete front glass to blackout the wheel house console navigation aids from sunlight
Man hole of FW, reserve FO tanks rubber packing to be changed, wasted portion to be renewed.
Intercom need to be made operational.
10 Nos of superior quality bunk cushion cover required to be provided for existing cushion of crew cabin 1, 2 and 3.
22 Nos pillow with pillow cover, towel hand white small - 10 Nos, Big Towel- white 10 Nos, and white bed sheet - 22 Nos superior quality required to be provided.
01 no FRP fresh water tank fabricated at TOP of Wheel house and an FRP lid/cover of suitable size needs to be made, which will be fitted to the freshwater tank with heavy duty SS hinges. Additional, an arrangement for a freshwater pump needs to be installed to lift the water into the tank
D shape fender at several places perished. Defective D shape fender installed surrounding the boat to be renewed
All seat fixture and hand rest to be repaired. Defective seat cover to be replaced.
Complete electric panel and its MCBs, fuses, switches etc. to be serviced or replaced with new if defective
03 KW Hybrid inverter with multiple power point mounting (MPPT) along with lithium ion battery for 06 to 08 Hrs back up for 10 fan ,15 light, navigational lights, TVRO/Dining room TV and 02 points for mobile charging. The inverter system will be charged by 01 KW solar panel fitted on the top the cabin and remaining charging of inverter will be done from the running of DG set. Separate wiring to be done or synchronising with existing wiring. The capacity of solar panel can be decrease/increase as per the area available on the top of Cabin/Wheel House.
ELECTRICAL SYSTEM Insulation resistance test (Megger test) and original equipment manufacture’s (OEM) recommendation for preventive maintenance to be carried out for the following electrical items: - a. Power and lighting circuits. b. Main switch board 415 VAC c. 230 VAC distribution board panel d. 24VDC communication distribution board e. 24VDC Navigation communication distribution board f. 24 VDC Distribution board. g. Battery isolators and Engine/control unit complete harnesses etc
All batteries cable, connectors and battery terminals are required to check if found any defect it should replace with new.
All type of electrical cable installed in boat required to be checked and replaced if defective and it should be laying in cable tray no any loose fitted of wire.
All Search light required to be serviced.
All Wiper arrangement along with blades and holder to be replaced. Wiper sprinkler system to be serviced/renewed.
All AC & DC switches, switch board and electrical line wiring to be checked and defective items replaced, servicing and made operational
Shore supply connection required to be serviced and check its function.
Power and lightning circuit to be serviced. Lighting protection under water plate to be checked and made serviceable.
12 Nos emergency lights and its connection required to be checked if defective it should be renewed. Proper fitting of emergency light should be ensured. proper fitting. Engine room Defective LED lights and its fixture is required to be renewed.
Instant hot water geysers required to be serviced at 04 Nos bathrooms
Defective LED light & fixtures SS on the outer deck at Port and STBD side are required to be replaced with new LED lights and new light fixture. Main deck forward side and aft side 02 Nos each 100 watts water proof LED Light with box, MCB and also required to be provided with cover with proper fitting. Engine room Defective LED lights and its fixture is required to be renewed.
VIP Cabins, Wheel house and Jawan Cabin light required to be checked if defective it should be replaced with new.
All bunk fans required to be serviced. Non repairable to be replaced. Old/serviced fan to be painted properly
Wall fans 02 Nos required to be serviced
Bilge alarm system and bilge pump float switch not working properly required to be repaired and it’s proper functioning should be checked.
Clear view screen installed at Port side front glass of Wheel house is to be removed and replaced with new glass, if technically applicable for clear vision of Master.
PAINTING WORK Before painting all portion to be cleaned. Ensure FRP lamination and gel coat wherever applicable to be done complete painting of whole vessel under water, all internal compartment, external decks, bulk heads, all FO tanks, FW tanks, sewage tank, and engine room as per painting scheme required to be done after preparing the surface. Draught Marks also be done. BSF Monogram and national flag sticker of existing size pasted at appropriate place on vessel STBD & Port side. Name of Medium crafts should be mentioned in existing manner at existing place. Painting scheme is as under :-Anti- fouling paint system as per latest international Maritime Organization (IMO) regulations shall be applied to hull bottom (Below water line). The pattern of the paint on the outer body part of the boat will be disruptive with combination of OG & cream / Smoke gray color. Inside of hull paint color should be pale cream (i) Anti – fouling Paint: - (JOTUN MAKE)Pen guard HB prime (Epoxy primer) 01 Coat -100 Micron (DFT)Safeguard universal ES grey tie coat 01 Coat-100 micron (DFT)Sea Quantum Pro-u light red -01 Coat-150 micron (DFT)(Silyl Acrylate Anti- fouling self -polishing paint)Sea quantum pro-u-dark red -01 Coat-150 micron (DFT)(Silyl Acrylate Anti- fouling self -polishing paint) (ii) AFT deck and all rounds walk way anti -skid painting.
4.2 MTRS RESCUE BOAT FITTED WITH 40 HP TWO STROKE OBM Complete servicing of 40 Mercury two stroke OBM is required to be carried as OBM covered approx. 300 run hours. Propellers are required to replace with new.
Portable service Motor Spirit (petrol) fuel tank, priming bulb and fuel line, fuel connectors is required be replaced with new.
Complete servicing of 4.2 Mtrs rigid boats required to be carried out if observed any leakage in FRP body and damage in rubber patch then repaired/renewed. Strength of Transom of rescue
boat is required to be checked if found any defect it should be repaired. 04 life jackets, 01 lifebuoys along with life rope and life rope of rescue boat required to be renewed. 10kg Graphical Anchor with rope, (Length 30 Mtrs & Dia 12mm) and 02 oars required to be provided in rescue boat.
Lifting sling required replacement
OBS FOR MEDIUM CRAFT GANGA S.No Particulars Qty 01 Main Engine all sensor 01 set 02 Alternator Belt for Main Engine 02 Nos 03 PWM-157-515110 signal isolator 02 Nos 04 Engine room Blower Blade(leaf) 12 Nos 05 Alternator Belt for DG set 02 No 06 Sea water pump belt for DG set 02 No 07 ECM for DG set 01 No.08 Engine oil pressure sensor for DG set 01 No.09 Stop solenoid for DG set 01 No 10 Starter relay 12 V for DG set 01 No 11 PCB/Mother Board for Air Conditioner 03 Nos 12 Display board for Air Conditioner 03 Nos 13 Temperature sensor with cable for Air Conditioner 03 Nos.14 Sea water cooling pump for Air Conditioner 05 Nos 15 Mud box for Air Conditioner 05 Nos 16 Air Conditioner machine unit complete as fitted in wheel house 01 No 17 Air Conditioner machine unit complete as fitted in cabin 01 No.18 Air Conditioner stabilizer 02 Nos 19 Anchor winch base plate 01 No 20 Anchor chain guard 01 No 21 Battery charger for emergency battery 01 No 22 Battery charger for Main Engine battery 01 No 23 Battery charger for DG set battery 01 No
Cost of Docking and keeping vessels on dock for completion of repair work & un-Docking.
Cost of insurance (For complete cost of vessel)
Inspection charges including IRS fees.
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 3.34 MB
BOQ_922520.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .