| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | LI₹3.0 LAccepted-AOC CJSF ROAD GALI NO 12 NEAR SHRI RAM GARDEN VIKAS NAGAR PANIPAT 132103 HARYANA | PANIPAT | PANIPAT | HARYANA | 132103 | ₹3.0 L | LI | Accepted-AOC agency has quoted Lowest L1 rates. |
| 2 | L2₹3.2 LRejected-AOC | ₹3.2 L | L2 | Rejected-AOC L2 |
| 3 | L3₹3.5 LRejected-AOC 189 TEACHEARS COLONY THAKUR PLOT TAJBAG NAGPUR 440024 | NAGPUR | MAHARASHTRA | 440024 | ₹3.5 L | L3 | Rejected-AOC L3 |
| 4 | L4₹3.6 LRejected-AOC | ₹3.6 L | L4 | Rejected-AOC L4 |
| 5 | L5₹3.6 LRejected-AOC FLAT NO 201 LAXMI PARK NIWAS BT KAWADE ROAD GHORPADI PUNE 411036 | PUNE | MAHARASHTRA | 411036 | ₹3.6 L | L5 | Rejected-AOC L5 |
Tender Value
₹4.1 L
Closing Date
14 Sept 2021, 6:00 pmClosed
Manager(Engg.E), AAI, Kullu Manali Airport
Manager (Engg.-E), Airports Authority of India, Kullu Manali Airport,Bhunatr Himachal Pradesh-175125.
Annual comprehensive maintenance contract of window / split AC units and water coolers at Kullu Manali Airport, Bhuntar for 2021-23)
2021_AAI_86730_1
CAMC-AC - Water cooler/2021-22
Open Tender
AMC/ Maintenance Contracts
Works
731 days
KULLU MANALI AIRPORT
Please refer Tender documents.
12 documents required · 12 mandatory
₹1,180
Exempted
1 Jul 2022
6 Sept 2021
21 Sept 2021
7 Sept 2021
14 Sept 2021
7 Sept 2021
7 Sept 2021 - 13 Sept 2021
Amount
Annual Comprehensive Maintenance of Window type Air-Conditioners of 1.5 TR Capacity at different locations including voltage stablizers, gas refilling/top up, repairing/replacement of faulty compressors, Cooling Coil, relay, thermostate, contactor and any other consumables/spares required for fault rectification etc. complete as required for Quantity-01 No.
For First Year.
For Second Year.
Annual Comprehensive Maintenance of Hot and cold Split type Air-Conditioners of all brand make of 1.5 TR Capacity installed at different locations including voltage stablizers, gas refilling/ top up, repairing /replacement of faulty compressors, Cooling Coil, relay, thermostate, contactor and any other consumables/spares required for fault rectification etc. complete as required for Quantity - 09 No.
For First Year.
For Second Year.
Annual Comprehensive Maintenance of Split type Air-Conditioners of all make of 1.5/2.0 TR. Capacity at different locations including voltage stablizers, gas refilling/top up, repairing/replacement of faulty compressors, Cooling Coil, relay,thermostate, contactor and any other consumables/ spares required for fault rectification etc. complete as required for Quantity-22 Nos.
For First Year.
For Second Year.
Annual Comprehensive Maintenance of Split type Air-Conditioners (Floor mounting ) of all types and makes of 3.0/3.5 TR. rating (Three phase) at different locations including voltage stablizers , gas refilling/top up , replacement of faulty compressors, cooling coil, relay, thermostate, contactor and any other consumables/ spares required for fault rectification etc.complete as required for Quantity - 15 Nos.
For First Year.
For Second Year
Annual Comprehensive Maintenance of 60/80 litre capacity water coolers cum RO water purifiers of 50 LPH installed at different locations. Membrane of RO shall be replaced when TDS of RO water is more than 150 ppm, quartely replacement of water filters as & when replacement of power supply-carbon filter-gas top up/refilling in compressor,thermostate,relay,water taps and other necessary consumable/spares required for fault rectification etc. complete as required for Quantity - 06 Nos.
For First Year.
For Second Year
Annual Comprehensive Maintenance of Online free standing RO purifier cum water dispenser of 8 to 16 litre tank capacity, having provision for hot, cold and normal purified water installed at different locations.Membrane shall be replaced when TDS of RO water is more than 150 ppm, quartely replacement of water filters as & when replacement of power supply,carbon filter,gas top up/refilling in compressor,thermostate,relay,water taps and other necessary consumable/spares required for fault rectification etc. complete as required for Quantity - 06 Nos.
For First Year.
For Second Year
Dismantling, Shifting, reinstallation, testing and commissioning at desired location with necessary civil opening of wooden or aluminium framing of required size for 1.5 TR. window type AC units etc. complete as required with suitable drain pipe.
Dismantling, Shifting, reinstallation, testing and commissioning of 2.0 TR. split AC units of different capacity and make at desired location with toping/refilling of refrigerant, installation of existing copper piping, drainage pipe inculding wall cutting, repairing upto original finish etc. as per satisfaction of Engg-in- charge.
Dismantling, Shifting, reinstallation, testing and commissioning of 3.0/3.5 TR. split AC units of different capacity and make at desired location with toping/refiling up of refrigerant, installation of existing copper piping, drainage pipe inculding wall cutting, repairing upto original finish etc. as per satisfaction of Engg-in- charge.
Note :- Bid with NIL/Blank/N.A/ZERO/Negative percentage rate quoted in BOQ will be rejected out rightly without giving any reason whatsoever. It will be considered as non-responsive Bid.
MOHANS ENTERPRISES
M K ENTERPRISES
R. D. ENGINEERS
Ganga Enterprises
stage.html
html • 0.06 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .