| 1 | L1₹1.8 CrAccepted-AOC 93 AMIT APT SECTOR 13 ROHINI ND 110085 | NORTH WEST | DELHI | 110085 | ₹1.8 Cr | L1 | Accepted-AOC Being a lowest Bidder |
| 2 | L2₹1.9 Cr+₹15.1 L (8.57%)Rejected-Finance D NO 33 15 3A SWAPNA NIVAS KADIYALAVARI STREET SEETHARAPURAM VIJAYAWADA 520002 | VIJAYAWADA | KRISHNA | ANDHRA PRADESH | 520002 | ₹1.9 Cr+₹15.1 L (8.57%) | L2 | Rejected-Finance Not lowest Bidder |
| 3 | L3₹1.9 Cr+₹16.2 L (9.20%)Rejected-Finance | ₹1.9 Cr+₹16.2 L (9.20%) | L3 | Rejected-Finance Not lowest Bidder |
| 4 | L4₹2.0 Cr+₹23.1 L (13.1%)Rejected-Finance | ₹2.0 Cr+₹23.1 L (13.1%) | L4 | Rejected-Finance Not lowest Bidder |
| 5 | L5₹2.0 Cr+₹26.3 L (14.9%)Rejected-Finance | ₹2.0 Cr+₹26.3 L (14.9%) | L5 | Rejected-Finance Not lowest Bidder |
Tender Value
Refer Docs
EMD Value
₹5.6 L
Closing Date
5 Jun 2020, 6:00 pmClosed
AGM (E-C)-I
AGM (E-C)-I, AAI, Vijayawada Airport, Gannavaram 521102
Grading and Drain works in Extended Operational area at Vijayawada Airport
2020_AAI_45178_1
AAI/VIJ/AGM(E-C)-01/2020
Open Tender
Civil Works
Item Rate
180 days
Vijayawada Airport
Please refer Tender documents.
4 documents required · 4 mandatory
₹1,180
Airports Authority of India
₹5.6 L
Yes
1 Sept 2020
20 May 2020
16 Jun 2020
20 May 2020
5 Jun 2020
20 May 2020
20 May 2020 - 5 Jun 2020
Amount
Excavation for earthwork in all kinds of soils, with hydraulic excavator and other suitable machinery of required capacity including transporting of material, loading and unloading with all lifts and leads with in airport plot area which includes existing operational area, trimming bottom and side slopes in accordance with requirement of lines, grades and cross section and construction of embankment to the required alignments grades and cross sections, in layers not exceeding 20cm in depth, breaking clods, watering , rolling each layer with power roller of 8-10 ton capacity, compacted to meet the requirement as per technical specifications and drawings complete as per the direction of Engineer- incharge
Cunstruction of embankment with good earth brought out from approved quarrey outside the airport permises.The complete operation will include spreading the moorum with dozzer, dressing, levelling, providing camber, grading with motor grader and consolidating with vibratory roller 8-10 tonne capacity including making good the undulation etc. As per technical specifications and drawings complete and directions of Engineer-In-Charge. (Cost includes all leads, taxes, royalty and operations).
Surface dressing of the ground including removing vegetation and inequalities not exceeding 15 cm deep and disposal of rubbish, lead up to 50 m and lift up to 1.5 m. All kinds of soil
75 mm thick back filling for pitching including supplying of required materials and consolidation etc. complete with : Stone aggregate 40 mm nominal size
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : 1:4:8 (1 Cement : 4 coarse sand (zone-III) : 8 graded stone aggregate 40 mm nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:2:4 (1 Cement : 2 coarse sand (zone-III) : 4 graded stone aggregate 40 mm nominal size
Dismantling and taking away of Existing Brick work Boundary wall as directed by Engineer in charge including disposal of rubbish beyond AAI premises. Note : Agency has to quote the rate in negative if the takaway material cost is morethan dismatling cost.
Dismantling and taking away of MS Iron gate of size 5m x 2.1m available at old 26 runway end as directed by Engineer in charge including disposal of rubbish if any beyond AAI premises. Note : Agency has to quote the rate in negative if the takaway material cost is morethan dismatling cost.
Dismantling and taking away of Existing barbed wire fencing on Boundary wall as directed by Engineer in charge including disposal of rubbish beyond AAI premises. Note: Agency has to quote the rate in negative if the takaway material cost is morethan dismatling cost.
Dismantling and taking away of MS angles over Boundary wall as directed by Engineer in charge including disposal of rubbish beyond AAI premises. Note : Agency has to quote the rate in negative if the takaway material cost is morethan dismatling cost.
BANAMALI ROUT
SRINIVASA EDIFICE PRIVATE LIMITED
Ruchira Associates
Y SAHITYA
RAJPADMA IN CORP
madhaviengineeringconstructions
alpha engineers
LALITHA CONSTRUCTIONS
stage.html
html • 0.06 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .