Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹35.1 LAccepted-Finance GRAM POST KARMI KAPKOT DISTRICT BAGESHWAR | BAGESHWAR | UTTARAKHAND | 263619 | L1 | Accepted-Finance Accepted | |
| 2 | L2₹35.3 L+₹25,038.14 (0.71%)Rejected-Finance ABC OF VIJAYPUR SECTION UNDER EDD BAGESHWAR | L2 | Rejected-Finance Rejected | |
| 3 | L3₹35.7 L+₹60,388.02 (1.72%)Rejected-Finance BHIKYASEN ALMORA | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | maa bhagwati electricals L1 | SHRI SAI ENTERPRISES L3 | GURUKRIPA ENGINEERS AND CONTRACTORS L2 |
|---|---|---|---|---|---|---|
| 1.00NON-CENTRALIZED MATERIAL (SUPPLY) | ||||||
| 2.00 | E-CLAMP FOR 11 KV | 96 | Nos | 259 ₹24,864 Lowest | 260 ₹24,960 | 262 ₹25,152 |
| 3.00 | HOODING ClAMP FOR FUSE SET/TPMO-SP-23,N&B | 8 | Nos | 259 ₹2,072 Lowest | 260 ₹2,080 | 262 ₹2,096 |
| 4.00 | STAY CLAMP FOR SP-23 SINGLE END | 48 | Nos | 324 ₹15,552 Lowest | 325 ₹15,600 | 325 ₹15,600 |
| 5.00 | STAY CLAMP FOR SP-23 DOUBLE END | 42 | Nos | 356 ₹14,952 Lowest | 360 ₹15,120 | 358 ₹15,036 |
| 6.00 | SHACKLE INSULATOR CLAM FOR SP-10 | 114 | Nos | 233 ₹26,562 Lowest | 235 ₹26,790 | 235 ₹26,790 |
| 7.00 | EARTH EIRE CLAMP WITH N&B | 40 | Nos | 324 ₹12,960 Lowest | 325 ₹13,000 | 325 ₹13,000 |
| 8.00 | STAY CLAMP FOR SP-21 WITH NUT&BOLT | 100 | Nos | 291 ₹29,100 Lowest | 300 ₹30,000 | 293 ₹29,300 |
| 9.00 | STAY CLAMP FOR SP-10 WITH NUT& BOLT | 50 | Nos | 235 ₹11,750 Lowest | 240 ₹12,000 | 237 ₹11,850 |
| 10.00 | PG CLAMP RABBIT TO RABBIT | 252 | Nos | 536 ₹1,35,072 Lowest | 540 ₹1,36,080 | 538 ₹1,35,576 |
Tender Value
₹35.1 L
EMD Value
₹75,000
Closing Date
7 Apr 2025, 3:00 pmClosed
Superintending Engineer
Superintending Engineer EDC Ranikhet
Additonal Transformer for voltage improvt. and additional Phase existing Transformer in Vijaypur section under EDD Bageshwar
2025_UPCL9_81930_1
EDC(R)-73/2024-25
Open Tender
Electrical Works
Item Rate
90 days
Bageshwar
As per Tender Document
2 documents required · 2 mandatory
₹2,360
Executive Engineer
₹75,000
25 Oct 2025
25 Mar 2025
8 Apr 2025
25 Mar 2025
7 Apr 2025
25 Mar 2025
Amount
NON-CENTRALIZED MATERIAL (SUPPLY)
E-CLAMP FOR 11 KV
HOODING ClAMP FOR FUSE SET/TPMO-SP-23,N&B
STAY CLAMP FOR SP-23 SINGLE END
STAY CLAMP FOR SP-23 DOUBLE END
SHACKLE INSULATOR CLAM FOR SP-10
EARTH EIRE CLAMP WITH N&B
STAY CLAMP FOR SP-21 WITH NUT&BOLT
STAY CLAMP FOR SP-10 WITH NUT& BOLT
PG CLAMP RABBIT TO RABBIT
SHACKLE INSÜLATOR 100X115 MM WITH N&B
STAY INSULATOR
BRACING CLAMP TOP FOR SP-23 WITH N&B
BRACING CLAMP BOTTOM FOR SP-23 WITH N&B
EARTH WIRE CLAMP FOR SP-10 With N&B
EARTH WIRE CLAMP FOR SP-21 With N&B
SHACKLE INSULATOR CLAMP FOR SP-21
NUT & BOLTS
AL. CRIMPING TYPE LUGS 70 SQ.mm
TOP CHANNEL HOLDING CLAMP FOR SP-23 POLE
LABOUR PART (WORK)
CHEMICAL EARTHING
ERECTION OF EARTHING ROD
FABRICATION OF STEEL
RE-ALIGNMENT OF TPMO
EXCAVATION OF PIT FOR STAY SET
ERECTION OF LT STAY SET
ERECTION OF 11 KV STAY SET
GROUTING OF STAY SET
EXCAVATION OF PIT FOR POLE
ERECTION OF SINGLE SP-10 POLE
ERECTION OF SINGLE SP-21 POLE
ERECTION OF SINGLE SP-23 POLE
ERECTION OF SP-23 DOUBLE POLE
GROUTING OF POLE
MUFFING OF POLE
PAINTING OF SP-10 POLE
PAINTING OF SP-21/23 POLE
LAYING OF LT PVC CABLES (>150 SQMM)
INST. OF 25 KVA DTR ON POLE STRUCTURE
FIXING OF TPMO
FIXING OF FUSE SET.
FIXING OF LIGHTNING ARRESTOR
LAYING OF RABBIT CONDUCTOR IN HT LINE
LAYING OF 3P 5W LT LINE (WEASEL)
LAYING OF 1P 2W LT LINE(WEASEL)
LOPPING & CHOPPING OF TREE BRANCHES
T-OFF CONNECTION COMPLETE 11 KV LINE
CONST. INST. OF DANGER BOARD/NUMBER PLATE
MAKING OF SECTION POLE
CARTAGE SP-10 POLE, 100-150 KM
CARTAGE SP-21/23 POLE, 100-150 KM
CARTAGE OF PETTY MATERIAL, 100-150 KM
CARTAGE OF 16/25 KVA DTR, 100-150 KM
HEADLOAD CARTAGE SP-10 POLE (0-1 KM)
HEADLOAD CARTAGE SP-21/23 POLE (0-1 KM)
HEADLOAD CARTAGE OF MATERIAL (0-1 KM)
HEADLOAD CARTAGE OF 25 KVA DTR (0-1 KM)
GURUKRIPA ENGINEERS AND CONTRACTORS (BID ID -370973)
SHRI SAI ENTERPRISES (BID ID -372210)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .