| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹34.4 CrAccepted-AOC | ₹34.4 Cr | L1 | Accepted-AOC For being L1 |
| 2 | L2₹38.0 CrRejected-Finance | ₹38.0 Cr | L2 | Rejected-Finance Not being L1 |
Tender Value
₹19.8 Cr
EMD Value
₹13.1 L
Closing Date
17 Jan 2023, 12:00 pmClosed
Chief Engineer Project Swastik, C/O 99 APO
Chief Engineer Project Swastik, Border Road Organisation, C/O 99 APO, Pin 931717
RISK AND COST TENDER FOR DESIGN AND CONSTRUCTION OF 189.50 MTR LONG MAJOR PERMANENT BRIDGE WITH PSC CONTINUOUS CANTILEVER SUPER STRUCTURE CABLE SUSPENSION BRIDGE AND ABUTMENT ON OPEN WELL FOUNDATION OVER RIVER TEESTA AT KM 0.00 ON ROAD SANKLANG-TOONG
2022_BRO_569994_1
80541/E8
Open Tender
Civil Works - Roads
720 days
km 0.00 on Sanklang-Toong road
As per tender document
8 documents required · 8 mandatory
₹0
₹13.1 L
Yes
O/o Chief Engineer Project Swastik, Gangtok
9 May 2023
19 Dec 2022
18 Jan 2023
19 Dec 2022
17 Jan 2023
27 Dec 2022
19 Dec 2022 - 26 Dec 2022
27 Dec 2022
Amount
Design and construction of 189.50 mtr long permanent bridge with PSC continuous cantilever super structure/cable suspension bridge and abutment on open foundation/well foundation over river Teesta at km 0.0 on road Sanklang-Toong under project Swastik with span arrangement as per Approved GAD and other approved design and drawings based on Special conditions, Particular specifications of the tender document including load testing of super structure as specified, all preparatory works, POT & POT cum PTFE bearings, construction of substructure and PSC superstructure including design of superstructure, launching/erection of staging work if required, Wearing coat having non skid surface, strip seal expansion joints, RCC hand railings, Kerbs, RCC crash barrier, guard posts, drainage arrangement over carriage way and footpath, service arrangement for utilities, painting with non-corrosive paint (The painting will be done with cold galvanized painting popularly known as zinga coating painting as per fifth revision of MoRT&H specifications for roads and bridge works to all exposed steel works and kerbs, protective works, temporary river training works and diversions, 1.5 mtr wide foot path both sides and all other items of work required and necessary for the complete construction of the bridge including curing but excluding works on approaches.
Ms Poddar Infratech Private Limited
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf