Loading…
India Infra Updates on WhatsApp
Join the Tenderkart WhatsApp channel for India Tender Updates
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance MARINE CORPORATION OF INDIA PROP ANAND SHIP CARE INSTITUTE PVT LTD 25 9 14 MARINE TOWERS RAJAVARI VEEDHI VISAKHAPATNAM | Admitted-Finance |
| 2 | Admitted-Finance 22 1 48 1 CHENGALARAOPETA BEACH ROAD VISAKHAPATNAM ANDHRA PRADESH 530001 | VISAKHAPATANAM | ANDHRA PRADESH | 530001 | Admitted-Finance |
| 3 | Admitted-Finance PLOT NO 195 QUAY STREET OPP NAGINA HOTEL DARUKHANA REAY ROAD EAST MUMBAI MAHARASHTRA 400010 | MUMBAI SUBURBAN | MAHARASHTRA | 400010 | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
28 Apr 2023, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
E.S.S Vindhya-Manager(Purchase)
Ph No - 9493792124
Removal, Repair, Installation and Trials of CLS, ELSE, LOX, VPL and Starting air system for EKM Class Submarine
2023_HSL_92644_1
CD/OS/1446/CLS/EKM/22 dated 19 April 2023
Open Tender
Miscellaneous Services
Service
30 days
Hindustan Shipyard Limited
Please refer Tender documents.
11 documents required · 11 mandatory
₹0
Exempted
11 May 2023
19 Apr 2023
29 Apr 2023
19 Apr 2023
28 Apr 2023
20 Apr 2023
Amount
Centralised Lubrication System (CLS)
(a) Disconnect all the grease pipes from grease distributors and degutt the same from onboard.
(b) Degutt distributor connected valves from onboard
(c ) Degutt shut off CLS device from onboard
(d) Degutt, blow through for clearing old grease, & repair of grease pipelines (as per HSL report), pressure test at shop floor and anneal, fitment onboard and pressure test along with system
(e ) Degutt of hoses with end connections from onboard
(f) Onboard fitment of hoses with end connections
(g) Test the system for hermetic nature by operating liquid under the pressure 200 kg/cm2 and functional trials with grease
Chilled Water System (CWS)
Degutt expansion tank and gauge glass from onboard
Emergency Life Saving Equipment (ELSE)
Degutt rod drives of ventilation valves for diver supply and exhaust valve.
Fire Smothering System (LOX)
(a) Degutt the reservoir from onboard
(b) Degutt the old nozzles from onboard
(c )Degutt the pressure switches from onboard
(d) Degutt from onboard, dismantle, carry out defect survey, repair as per defect survey, testing at hop floor and fitment onboard for the following valves
Straightway shut off valve Dy10 Py200
Pressure gauge valve Dy6 Py400
Pressure gauge valve Dy6 Py100
Shut off angle union valve Dy10 Py100
Straightway shut off bellows valve Dy20 Py64
Straightway shut off bellows valve Dy32 Py64
Shut off check straightway bellows valve Dy20 Py64
Non return uniflow valve Dy20 Py64
Full lift safety union valve Dy10 Pw10/16
Alarm safety valve Dy6
Automatic reducing valve Dy6/10 Py400
Disconnecting valve Dy10 Py16
Angle shut off union valve Dy10 Py100
Manually operated two way air control valve ID10, Pd45
(e ) Degutt air bottles from onboard
(f) Prove the system
Fixed Fire Fighting System (VPL)
(a) Degutt reel drums from onboard
(b) Degutt Quick-release hoses ID32, from onboard.
(c) Degutt the reservoir and dosimeter from onboard.
(d) Degutt from onboard, dismantle, carry out defect survey for the following valves and cocks, undertake repair as per defect survey and pressure test at shop floor
(i) Reducing valve Dy6/10 Pw200
(ii) Straightway shut off non-return valve Dy10 Py100
(iii) Angle shut off non return valve Dy20 Py40
(iv) Pressure gauge valve Dy6 Py100
(v) Pressure gauge valve Dy6 Py400
(e ) Degutt Safety valves and reducers 200/15 kg/cm2 from onboard
(f) Blow through bulkhead pipes to clear clogging and carry out flushing for the entire system
(g) Pressure test the assembled system for 15 kg/cm2
Charge reservoir & dosimeter with foam chemical, check time required for discharge of foam from 1 point with a container till 1 dose is exhausted. This should be between 2 - 7 minutes & trials
Starting sir system (DGSA) (as per Scope of work)
MANDATORY SPARES
CLS - Hose connection (with end fittings)
VPL - Teflon ring
VPL - Half ring
VPL - Springs
VPL - Reel drum hoses
VPL - Quick release hoses
LOX - Pressure switches
8WMC - Tyre (Pattern : SR6001D-8(SH)MC-1-5C(P) )
8WMC - Friction Pads
8WMC - Sealing Ring
Note : Bidders are requested to quote inline with Price Bid format mentioned in TTS
Description of Work / Item(s)
Amount
ANTICIPATORY SPARES
FSS - Air Bottle
VPL - Disperser
VPL - Sight Glass
VPL - Relief Valve
VPL - Diaphragm
VPL - Pressure Switch
SRI SRINIVASA ENGINEERING WORKS
Marine Corporation of India, Anand Ship Care Institute Pvt Ltd
ULTRA MARINE
Marine Corporation of India, Anand Ship Care Institute Pvt Ltd
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .