| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1₹3.7 CrAccepted-AOC 2ND FLOOR KALOOR BUSSTAND COMPLEX BUS STAND COMPLEX KALOOR BUSSTAND COMPLEX ERNAKULAM KERALA 682017 | ERNAKULAM | KERALA | 682017 | ₹3.7 Cr | 1 | Accepted-AOC L1 |
| 2 | Rejected-Technical B71 AKSHAY MITTAL INDUSTRIAL CO OPERATIVE SOCIETY BUILDING NO 5 ANDHERI KURLA ROAD MAROL MAROL ANDHERI EAST MUMBAI MAHARASHTRA 400059 | MUMBAI SUBURBAN | MAHARASHTRA | 400059 | - | - | Rejected-Technical Technically Not Acceptable |
| 3 | Rejected-Technical 41 1294 A6 SECOND FLOOR BEEVI COMPLEX C P UMMER ROAD KOCHI ERNAKULAM KERALA 682035 UDYAM KL 02 0026628 32AAECD3143Q1ZL R M | ERNAKULAM | KERALA | 682035 | - | - | Rejected-Technical Technically Not Acceptable |
| 4 | Rejected-Technical | - | - | Rejected-Technical Technically Not Acceptable |
Tender Value
Refer Docs
Closing Date
1 Jan 2025, 2:00 pmClosed
DGM (SRM)
Ship Repair Materials Department Cochin Shipyard LTD Perumanoor PO
UNSINKABILITY PUNJ AND PUDS TANK LEVEL SENSOR KASPIY SYSTEM JOBS RM 0807
2024_CSL_221474_1
CSL/SR1/41474/VKD436
Open Tender
Marine Services
Works
60 days
Karwar/CSL/Cochinport
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
Exempted
16 Feb 2025
26 Dec 2024
2 Jan 2025
26 Dec 2024
1 Jan 2025
26 Dec 2024
26 Dec 2024 - 1 Jan 2025
Amount
Unsinkability Board(SERVICE COST)
Following to be undertaken as part of SoW :- 3.23.1 Repairs/ Serviceability checks of 272 flood alarm sensors 3.23.2 Repairs/ Serviceability checks of 159 BP converters 3.23.3 Serviceability checks of PDCR and SPDCR control panels including renewal of perished/ brocken control cables, replacement of defective fuses, indication lamps 3.23.4 Proving of circuitory checks of alarm signal from respective flood sensors
PUNJ & PUDS(SERVICE COST)
Operational check/ Defect rectification on PUNJ and PUDUS panel view erratic operation during exploitation.
Tank level sensors (SERVICE COST)
1.9.1. Serviceability checks of Russian make tank level sensors for fuel tanks, DA fuel tanks, Dirty oil and water tanks, feed water tanks and lub oil tanks. 1.9.2. Replacement of defective tank level sensors including removal, calibration and fitment. Qty - 52 1.9.3. Continuity checks of power and signal cabling of all sensors, replace if defective (Approx-500 mtrs) 1.9.4. Provisioning of centralisied monitoring system of tank level at PDCR/ SPDCR and followed by STW and commissioning Type of sensors are as follows:- 1.9.5. АД-4Р-Н (Upper level sensor) - qty – 141 1.9.6. АД-4М-О (Lower level sensor) - qty - 60 1.9.7. ДМ (Level measurement sensor) - qty – 10
Kaspiy system(SERVICE COST)
Repairs/ Serviceability checks of solenoids. Replacement of defective ones. -20Nos 3.125.1 Check all service tallies and cable for correct securing.-1Set 3.125.2 Check that the control panel rubber seals/gaskets are in place and in good condition. 3.125.3.Check wiring/contacts/relays of the panels for wear/deterioration. Project specific defects to DYD for renewal/replenishment if necessary.-14Nos 3.125.4. Carry out repair /calibration of defective 37sensors/gauges at shop floor. -4Nos Serviceability of batteries:- Return all batteries in a filled and charged condition to the battery shop for maintenance-4Nos Capacity test of battery and repair as necessary -4Nos Preservation of battery / system -1Set
Unsinkability Board(MATERIAL COST)
Following to be undertaken as part of SoW :- 3.23.1 Repairs/ Serviceability checks of 272 flood alarm sensors 3.23.2 Repairs/ Serviceability checks of 159 BP converters 3.23.3 Serviceability checks of PDCR and SPDCR control panels including renewal of perished/ brocken control cables, replacement of defective fuses, indication lamps 3.23.4 Proving of circuitory checks of alarm signal from respective flood sensors
PUNJ & PUDS (MATERIAL COST)
Operational check/ Defect rectification on PUNJ and PUDUS panel view erratic operation during exploitation.
Tank level sensors ( MATERIAL COST)
1.9.1. Serviceability checks of Russian make tank level sensors for fuel tanks, DA fuel tanks, Dirty oil and water tanks, feed water tanks and lub oil tanks. 1.9.2. Replacement of defective tank level sensors including removal, calibration and fitment. Qty - 52 1.9.3. Continuity checks of power and signal cabling of all sensors, replace if defective (Approx-500 mtrs) 1.9.4. Provisioning of centralisied monitoring system of tank level at PDCR/ SPDCR and followed by STW and commissioning Type of sensors are as follows:- 1.9.5. АД-4Р-Н (Upper level sensor) - qty – 141 1.9.6. АД-4М-О (Lower level sensor) - qty - 60 1.9.7. ДМ (Level measurement sensor) - qty – 10
Kaspiy system(MATERIAL COST)
Repairs/ Serviceability checks of solenoids. Replacement of defective ones. -20Nos 3.125.1 Check all service tallies and cable for correct securing.-1Set 3.125.2 Check that the control panel rubber seals/gaskets are in place and in good condition. 3.125.3.Check wiring/contacts/relays of the panels for wear/deterioration. Project specific defects to DYD for renewal/replenishment if necessary.-14Nos 3.125.4. Carry out repair /calibration of defective 37sensors/gauges at shop floor. -4Nos Serviceability of batteries:- Return all batteries in a filled and charged condition to the battery shop for maintenance-4Nos Capacity test of battery and repair as necessary -4Nos Preservation of battery / system -1Set
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .