Loading…
Loading…
Tender Value
₹6.4 L
EMD Value
₹12,800
Closing Date
5 May 2026, 10:30 amClosed
Executive Engineer
HP City Transport and Bus Stand Management And Development Authority Tutikandi Shimla -4
SH Dismantling of old slab and P/L tiles flooring and W.S. and S.I. etc
2026_BSMDA_134225_5
No.HPBSMDA/EE/(2)2025-2026 Tender Vol-V
Open Tender
Civil Works
120 days
Sarkaghat
Please refer tender document
9 documents required · 9 mandatory
₹415
HPBSMDA
₹12,800
13 Apr 2026
13 Apr 2026
5 May 2026
14 Apr 2026
5 May 2026
14 Apr 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1.01 | Demolishing R.C.C. work by mechanical means and stockpiling at designated locations and disposal of dismantled materials up to approved dumping site, stacking serviceable and unserviceable material separately including cutting einforcement bars (Serviceable material like steel bars to be handing over to the deptt .), including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | - | Per Cubic Meter | - | - |
| 2.01 | Demolishing cement concrete manually/ by mechanical means including disposal of material within all leads as per direction of Engineer - in - charge. Nominal concrete 1:3:6 or richer mix (i/c equivalent design mix), including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | - | Per Cubic Meter | - | - |
| 3.01 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm (Thirty centimeter) in depth, 1.5 m in width as well as 10 sqm (Ten square meter ) on plan) including getting out and disposal of excavated earth lead upto approved dumping site, All kinds of soil, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | - | Per Cubic Meter | - | - |
| 4.01 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | - | Per Square Meter | - | - |
| 5.01 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | - | Per Square Meter | - | - |
| 6.01 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material upto approved dumping site (Serviceable material like Bricks to be handing over to the deptt .) : In cement mortar, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | - | Per Cubic Meter | - | - |
| 7.01 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfasts etc. complete and stacking within all leads (Serviceable material like adoors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, holdfast etc. to be handing over to the deptt .) : Of area 3 (Three ) sq. metres and below, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | - | Each | - | - |
| 8.01 | Taking out doors, windows and clerestory window shutters (steel or wood) including stacking within all leads (Serviceable material like adoors, windows and clerestory window shutters (steel or wood) shutter including chowkhats, architrave, holdfast etc. to be handing over to the deptt .) : Of area 3 (Three ) sq. metres and below , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | - | Each | - | - |
| 9.01 | Dismantling tile work in floors and roofs laid in cement mortar including stacking material within all leads, including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | - | Per Square Meter | - | - |
| 10.01 | Disconnecting damaged overhead/terrace PVC water storage tank of any size from water supply line and removing from the terrace including shifting at ground level , including all leads, lifts and carriage of materials, complete in all respect of as per entire satisfaction of the Engineer in charge. | - | Each | - | - |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_198500.xls
BOQ • 0.33 MB
SBD.pdf
Tender Documents • 10.51 MB
Download all tender documents and submit your bid