RequiredExperience with Government
RequiredAnnual Turnover
RequiredCertificate (Requested in ATC)
RequiredOEM Authorization Certificate
RequiredOEM Annual Turnover Bid to RA enabled No Note: 1. OEM Turn Over Criteria: The minimum average annual financial turnover of the OEM of the offered product during the last three years
Requiredending on 31st March of the previous financial year
Requiredshould be as indicated in the bid document. Documentary evidence in the form of certified Audited Balance Sheets of relevant periods or a certificate from the Chartered Accountant/Cost Accountant indicating the turnover details for the relevant period shall be uploaded with the bid. In case the date of constitution/incorporation of the OEM is less than 3 year old
Requiredthe average turnover in respect of the completed financial years after the date of constitution shall be taken into account for this criteria. Inverters Solar Inverter ( 15 pieces ) Technical Specifications 1/7 * As per GeM Category Specification Specification Specification Name Values Bid Requirement (Allowed Values) GENERIC Rating of inverter (KVA) 3.0 KVA 3.0 KVA ISI marked No Yes
RequiredNo If ISI marked yes
RequiredCM/L No. must declare. If ISI mark No write NA - * Nos. of phase single single Inverter output wave form Pure sine wave Pure sine wave Ingress protection rating of inverter IP 23 for indoor use IP 23 for indoor use Built in protection for AC high/low voltage and frequency if connected to AC mains IP 23 for indoor use IP 23 for indoor use Display Type LCD LCD Area required for installation of Solar panels with mounting structure (sq. mt) - * Material of mounting structure Galvanised steel Galvanised steel CONSTRUCTIONAL Mode of operation To be used in conjunction with AC mains * Switching device IGBT IGBT Maximum power point tracking (MPPT) yes * Galvanic isolation between input DC and output AC yes * By-pass facility if connected to AC mains IP 23 for indoor use * Display parameters like DC voltage (V) DC current (A) AC voltage(V) YES * Sequence of power drawing (1) SPV (2) AC MAINS (IF CONNECTED WITH AC POWER) (3) BATTERY BANK * 2/7 Nos. of modules in an array (NOS.) - * Rating of individual PV module (Wp) - * Salt mist corrosion resistant material for body and frame of SPV module Galvanized steel Galvanized steel Provision for Solar generation meter yes * Provision for bidirectional meter (Net Meter) no * Provision of anti rusting/non corrosive mounting structure yes * Sustainability of wind speed. (KM/Hr) 200 200 Type of battery (KM/Hr) Tubular Gel Tubular Gel Capacity of battery bank (VAH) - * 3 stage battery charging (float
Requiredboost and equalize stage) for long life of the battery yes * Reverse polarity protection yes * Complete installation work to be done by supplier yes * Gross weight of the inverter (kg) - * Reverse polarity protection for PV modules yes * FUNCTIONAL Inverter efficiency - * Total Harmonic distortion (%) - * Operating AC voltage range (Volts) - * Operating frequency range (Hz) - * Operating Temperature (degree cel) - * Operating relative humidity (%) - * 3/7 Load power factor - * Output regulation at rated voltage Yes * Over load Protection 110% for 60 Seconds
Required125% for 30 Seconds and 150% for 5 seconds yes * Efficiency of Solar panel (%) - * Battery backup time at rated load (Hour) 4 4 Battery bank Voltage (Volt) - * CERTIFICATIONS Conformity of inverter to environmental testing conditions as per IEC 600688-2 (1
Required2
Required14
Required30) or equivalent BIS standard YES * 90% performance warranty for SPV (years) 10 * 80% performance warranty for SPV (years) 25 * TTC for PV module from any MNRE lab as per MNRE 2015-2016 yes * OEM test report for indigenously produced PV module (s) yes * Availability of Type test report for inverter including environmental tests from Central government/NABL/ILAC accridiated laboratory to prove conformity to the specification yes * Test report number - * Date of test report - * Name and address of laboratory - * Type test report to be furnished on buyers demand yes * * Specifications highlighted in bold are the Golden Parameters. 4/7 * Bidders may note that In respect of non-golden Parameters
Requiredthe specifications 'Values' chosen by Buyer will generally be preferred over 'Bid requirement ( allowed Values) by the Buyer. Additional Specification Documents