Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.7 LAccepted-AOC R O VILL HASOL P O CHUKHATH TEHSIL JAWALAMUKHI DISTT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | ₹2.7 L Quoted ₹3.3 L | L1 | Accepted-AOC Awarded |
| 2 | L2₹4.0 LRejected-Finance V P O TEHSIL JAWALAMUKHI DISTT KANGARA HP | ₹4.0 L | L2 | Rejected-Finance L2 |
| 3 | L3₹4.7 LRejected-Finance R O VILL HASOL P O CHUKHATH TEHSIL JAWALAMUKHI DISTT KANGRA | KANGRA | HIMACHAL PRADESH | 175013 | ₹4.7 L | L3 | Rejected-Finance L3 |
| Sl No | Description | Qty | Unit | Vijay kumar kushwaha L2 | M/S VIKAS CONSTRUCTION L3 | Vikas Thakur L1 |
|---|---|---|---|---|---|---|
| 1.00 | Dismentalling of head assembly and rejointing completer in all respect as per direction of Engineer in charge with in all leads and lifts | 14 | Nos. | 350 ₹4,900 | 380 ₹5,320 | 300 ₹4,200 |
| 2.00Extrection of riser pipe including dismentalling complete in all respect as per direction of Engineer in charge with in all leads and lifts | ||||||
| 2.10 | 32 mm dia | 573 | Rmt | 38 ₹21,774 | 42 ₹24,066 | 30 ₹17,190 |
| 2.20 | 65 mm dia | 108 | Rmt | 38 ₹4,104 | 40 ₹4,320 | 35 ₹3,780 |
| 3.00Lowering of riser pipe including fitting complete in all respect as per direction of Engineer in charge with in al leads and lifts. | ||||||
| 3.10 | 32 mm dia | 573 | Rmt | 39 ₹22,347 | 45 ₹25,785 | 30 ₹17,190 |
| 3.20 | 65 mm dia | 108 | Rmt | 38 ₹4,104 | 48 ₹5,184 | 35 ₹3,780 |
| 4.00 | Extrection of connection rods 12 mm dia complete in all respect as per direction of Engineer in charge with in all leads and lifts | 681 | Rmt | 35 ₹23,835 | 39 ₹26,559 | 32 ₹21,792 |
| 5.00 | Lowering of connection rods 12 mm dia complete in all respect as per direction of Engineer in charge with in all leads and lifts. | 681 | Rmt | 35 ₹23,835 | 42 ₹28,602 | 32 ₹21,792 |
| 6.00Cutting / threading of riser pipe of following dia complete in all respect as per direction of Engineer in charge with in all leads and lifts. | ||||||
Tender Value
₹2.9 L
EMD Value
₹5,804
Closing Date
15 Oct 2025, 10:30 amClosed
EE Jal Shakti Division Thural
EE Jal Shakti Division Thural
Repair and flushing of hand pumps Mark-II and mark-III
2025_HPIPH_116875_1
EE/JSVD/THL/2025-26-7461-96 Dt. 04.10.2025
Open Tender
Repair and Maintenance Services
30 days
EE Jal Shakti Division Thural
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
EE Jal Shakti Division Thural
₹5,804
12 Feb 2026
4 Oct 2025
15 Oct 2025
4 Oct 2025
15 Oct 2025
4 Oct 2025
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid