Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Admitted-Finance | Admitted-Finance |
Tender Value
Refer Docs
Closing Date
10 Apr 2023, 5:00 pmClosed
Mr. Uday Kumar (Manager)
Ph No - 9493792566
Rate Contract for Hull Out Fit Works vessels under Construction (Hsl Premises and Contractor Premises)
2023_HSL_92458_1
CD/OS/1438/SB-RC-Hull Outfit Works /300/2023
Open Tender
Miscellaneous Services
Service
30 days
Hindustan Shipyard Limited
Please refer Tender documents.
14 documents required · 14 mandatory
₹0
Exempted
Hindustan Shipyard Limited
28 Jun 2023
17 Mar 2023
11 Apr 2023
17 Mar 2023
10 Apr 2023
27 Mar 2023
24 Mar 2023
Amount
Machinery / Equipment Seat/Foundation Fabrication & Erection
Fabrication of machinery seat/Foundation as per Drawing
Erection on board on Deck/Tank top (With Under Deck Stiffening in confined spaces/Tanks/Deck overhead)
Erection on board on Deck/Tank top (Without Under Deck Stiffening)
Erection on board on Bhd/Shell( with/without Stiffening on other side)
Note: HSL Scope: Processed Steel Material Contr. Scope: Marking, Cutting, Fit up, Welding & Dry Survey
Erection of Side Scuttles/Port Holes
a) Up to 600 mm diameter
Note: HSL Scope: Materials supply :Scuttles/Port holes with Dead light covers including Eye brows, chains and holding arrangement Contr. Scope: Erection on board: Shifting to location, marking, Cutting, Fitment, Welding, Dry Survey & Hose Test. Suitable temp stiffening to be provided to avoid any distortion and shall be removed and ground smooth post welding. Provision of holding arrangement for dead light covers. Drilling and fixing of portholes with fasteners if coaming is not welded.
Erection of Windows : Bolting Type / Welding Type
Area Up to 2 sq. m
Area From 2 sq. m to 4 sq. m
Note: HSL Scope: Material supply: Windows and consumables Contr. Scope: Erection on board: Shifting to location, Marking, Cutting, Fitment, Welding, Dry Survey ,Chalk test& Hose Test including eyebrows fitment and welding Suitable temp stiffening to be provided to avoid any distortion and shall be removed and ground smooth post welding
Erection of Window wipers/Clear View Screens
Note: HSL Scope: Window Wipers/Clear View Screens Contr. Scope: Erection on board: Shifting to location, Marking, drilling, Fitment, welding& Dry Survey. Offering trials along with other contractor
Erection of Water Tight Doors
Erection of WT Doors with Frames
Note: HSL Scope: WT doors with frames Contr. Scope: Erection on board: Shifting to location, Marking, Cutting, Fitment, Welding, Dry Survey, Chalk Test & Hose Test. Suitable temp stiffening to be provided to avoid any distortion and shall be removed and ground smooth post welding. Door stopper arrangement to provide as per drawing.
WT Access Hatches
WT Access Hatches with cover( area up to 1 Sq. m)
Note: HSL Scope: Material: Access Hatches Contr. Scope: Erection on board: Shifting to location, Marking, Cutting, Fitment, Welding, Dry Survey, Chalk Test & Hose Test. suitable temp. stiffening to be provided to avoid any distortion and shall be removed and ground smooth post welding. Internals of the deck to be terminated as per the drg in way of the opening
Hinged Covers /Louver with Door
Fabrication & Erection of Hinged Covers /Louver with Door as per Drawing
Area <0.5 sq. m
Area 0.5 to 1 sq. m
Area > 1 sq. m
Note: HSL Scope: Processed Material, Hinges, door rubber packing Contr. Scope: Fabrication: Fit up, Welding & Dry Survey Erection on board: Shifting to location, Marking, Cutting, Fitment, Welding, Dry Survey, Chalk Test & Hose Test. Suitable temp stiffening to be provided to avoid any distortion and shall be removed and ground smooth post welding
Erection of Hinged covers/Louvers
Area <0.5 sq. m
Area 0.5 to 1 sq. m
Area > 1 sq. m
Note: HSL Scope: Material :Fabricated Hinged covers/Louvers with rubber packing Contr. Scope: Erection on board: Shifting to location, Marking, Cutting, Fitment, Welding, Dry Survey, Chalk Test & Hose Test. Suitable temp stiffening to be provided to avoid any distortion and shall be removed and ground smooth post welding
Fabrication & Erection of soft patches
Note: HSL Scope: Material :Processed Material, Rubber, Bolts & nuts, Screws, putty Contr. Scope: Fabrication: Fit up, Welding & Dry Survey , drilling Erection on board: Shifting to location, Marking, Cutting & Removal of Deck, Fitment & Welding of Soft Patch supporting structure, Marking, Drilling & tapping of Holes for fixing of Soft patch, Fitment of Soft Patch using rubber gasket & Fasteners, Dry Survey and Hose testing. Application of putty as required.
Fabrication& Erection of steel Non Water Tight Doors
Fabrication and erection of NWT Doors with Frames
Note: HSL Scope: Processed material Contr. Scope: Fabrication of NWT door with frames as per Drg. Erection on board: Shifting to location, Marking, Cutting, Fitment, Welding, Dry Survey. Suitable temp stiffening to be provided to avoid any distortion and shall be removed and ground smooth post welding
Vertical Ladders
Fabrication of Vertical Ladders
Note: HSL Scope: Processed material Contr. Scope: Marking, Cutting, Fit up, Welding & Dry Survey. Providing securing lugs with necessary drill holes
Erection of Vertical Ladders in tanks/at various deck levels/Bhds etc.
Note: HSL Scope: Fabricated Vertical ladder Contr. Scope: Erection on board: Shifting to location, Marking, Cutting, Fitup, Welding & Dry Survey including erection of rungs/hand rail as required
Inclined Ladders in machinery spaces/Accommodation Spaces
Fabrication & Erection of Inclined Ladders including hand railing (Chequered Plate or Grating ) and fitment and welding/fixing with fasteners of backside cover/dust guard plates .Location: machinery spaces/Accommodation spaces
Note: HSL Scope: Processed Material, piping, Grating or Chequered plate, dust guards, fasteners, bending of railing pipes Contr. Scope:Fabrication: Marking, Cutting, Fit up, Welding & Dry Survey. Erection: Shifting to location on board, Erection, Marking, cutting, fit up, welding & Dry Survey including railing. Providing securing lugs with necessary drill holes
Erection of Inclined Ladders including hand railing (Chequered Plate or Grating ) and fitment welding/fixing with fasteners of backside cover/dust guard plates .Location: machinery spaces/Accommodation
Note: HSL Scope: Fabricated ladder and railing materials Contr. Scope:Erection: Shifting to location on board, Erection, Marking, cutting, fit up, welding & Dry Survey.
Fabrication& Erection of Raised platform/cross over platform in way of Stair case ladders/machinery spaces
Note: HSL Scope: Processed Material, piping, Grating or Chequered plate, angles Contr. Scope:Fabrication: Marking, Cutting, Fit up, Welding & Dry Survey Erection: Shifting to location on board, Erection, Marking, cutting, fit up, welding & Dry Survey. Erection of chequered plates with drilling and tapping.
Fabrication & Erection of Signal mast (Pipe) ,Jack Staff, Ensign Staff)
Signal Mast with yard arms
Jack Staff & Ensign Staff
Note: HSL Scope: Processed Material Contr. Scope:Fabrication of Signal mast, Jack staff, ensign staff as per drg including generation of elements from the steel plates & pipes. Erection on board: Shifting to location, Marking, Cutting, Fit up Welding & Dry Survey. Work includes underdeck stiffening for mast. Fabrication and Fitting of stays for foldable masts
Fabrication & Erection of Plate Mast
Note: HSL Scope: Processed Material Contr. Scope:Fabrication of Plate Mast as per Drg. Erection on board: Shifting to location, aligning, Marking, Cutting, Fit up, Welding & Dry Survey. work includes underdeck stiffening if any
Fabrication & Erection of Collapsible Mast
Note: HSL Scope: Processed Material Contr. Scope: Fabrication of collapsible mast as per Drg. Erection on board: Shifting to location, aligning, Marking, Cutting, Fit up, Welding & Dry Survey. Work includes underdeck stiffening fitment and dry survey. Trial of the mast.
Lifting Beams/Lifting Eyes
Fabrication & Erection of Lifting Beams in machinery spaces
Fabrication & Erection of lifting lugs in machinery spaces ,Lashing eyes on decks and Bhds
Fabrication & Erection of lifting lugs on Hull (on shell plates)
Load test of lifting beam
Load test of lifting eye/lug
Note: HSL Scope: Processed Material, Calibrated load for testing Contr. Scope: Fabrication: Marking, Cutting, Fit up, Welding, Dry Survey as per Drawing Erection: Shifting to location on board, Erection, Fit up, Welding, Dry Survey & Load Testing
Fabrication and Erection of Deck Railing With Stanchions/Guard Rails (Fixed type including processing)
GI storm rails
Note: HSL Scope: Raw Material, pipes, chains, fastners Contr. Scope: Fabrication: Marking, Cutting, Fit up, Welding, Drilling & Tapping, Dry Survey Erection: Shifting to location on board, Erection, Fit up, Welding, Dry Survey. On site modification in coordination with other dept. Chains in way of openings in guard rails is included in the scope of work
Fabrication and Erection of Deck Railing With Stanchions/Guard Rails (Collapsible type including processing).
Fabrication of guard rail by ferruling and fixing on board
Note: HSL Scope: Raw Material, pipes, fasteners, processed material for shoes, bottle screws, pvc coated guard rail wires, shackles, chains, fastners Contr. Scope: Fabrication: Marking, Cutting, Fit up, Welding, Drilling & Tapping , Dry Survey Cutting guard rail wires to size and ferruling Erection: Shifting to location on board, Erection, Fit up, Welding, Dry Survey Fitment of guard rails. On site modification in coordination with other dept.
Fabrication, Erection of Awnings (Pipe stanchions) and stowage arrangement - including Processing
b) Aluminium
Note: HSL Scope: Raw Material Contr. Scope: Fabrication: Marking, Cutting, Fit up, Welding, dry Survey. The stanchion shoes to be drilled as per the deck shoes. Erection: Shifting to location on board, Erection, Survey. For AL welding Qualified welder and Aluminium welding rectifier is a prerequisite. Stowage arrangement as per Drg. Shoes on the hull for the stanchions are to be manufactured and welded on the deck after cutting the openings/ Deck eyes are to be fabricated drilled and welded
Mushroom Head Ventilators
Fabrication of Mushroom Ventilators (Up to 1000 mm OD)
Fabrication of Mushroom Ventilators (Above 1000 mm OD up to 2000 mm OD)
Fabrication of Mushroom Ventilators (Above 2000 mm OD)
Fabrication and erection of deck coamings with flanges and drilling for above
Note: HSL Scope: Processed Steel Material, Spindle, Wheel, Rubber Packing, Meshes & Fasteners Contr. Scope: Fabrication: cutting of elements to required dimensions, sending for rolling to HSL shop, collecting processed elements from dept., Fit up, Welding and assembly of elements as per Drawing. Survey of the ventilator. Shifting to location on board, marking, cutting, fit up and welding of deck coaming and survey.
Erection of Mushroom Ventilators (Up to 1000 mm OD)
Erection of Mushroom Ventilators (Above 1000 mm up to 2000 mm OD)
Erection of Mushroom Ventilators (Above 2000 mm OD)
Note: HSL Scope: Fabricated/Supplied Mushroom Ventilator, rubber gasket, Fasteners, ladder, deck coaming along with flange Contr. Scope: Preparation of gasket, shifting on board, Erection of mushroom head ventilators, Dry Survey & Chalk Test including under deck stiffening & ladder as per Drawing and operation trails
Fabrication & Erection of Goose Neck Ventilators and flaps
Note: HSL Scope: Raw and Processed Material, Eye bolts, wing nuts, rubber packing, rolling assistance Contr. Scope: Fabrication: cutting, Fit up, Welding & Dry Survey as per Drawing Erection: Shifting to on board ,Marking, cutting, fit up, welding, Dry Survey & Chalk/Hose Test as per Drawing
Fabrication & erection of Mooring items on board as per Mooring Layout
Fabrication & Erection of Bollards including under decks stiffening
Fabrication & Erection of Fairlead foundation including under deck stiffening. Erection of fairlead rollers
Erection of Panama Chock including stiffening
Fabrication and erection of mooring eyes on bulwark
Note: HSL Scope: Raw and Processed Material for Bollards, Rollers for Fairleads, Panama chock, CS rods Contr. Scope: Fabrication: Fit up, Welding & Dry Survey as per Drawing Erection: Shifting to location on board, Fit up, welding, Dry Survey including stiffening as per drawing
Flooring in Machinery spaces and other spaces including platforms and steps
MS Flooring including frame work in machinery spaces
AL Flooring including frame work in machinery spaces
Removal & re-fixing of Floor Plates
Removal and re-fixing/modification of floor plates including frame work
Note: HSL Scope: Raw Material Contr. Scope: Erection: Shifting to location on board ,Erection, Fit up, welding, Dry Survey including stiffening as per drawing, Detailed scope of work is placed at S. No 4.2.4 in TTS Document
Fabrication & Erection of Circular/Elliptical Coamings (Not exceed 0.15Sq.m.Thickness: 6 to 14mm)
Fabrication of coaming as per Drg, & Erection of Coamings on Girders/deck/overhead/Bhds on board
Fabrication & Erection of Coamings in confined Spaces/Tanks
Fabrication of Coaming as per Drg,
Note: HSL Scope: Processed Material including Flat bar Bending Contr. Scope: Fabrication: Fit up, Welding & Dry Survey Erection: Shifting to location on board, Erection, Marking, cutting, fit up, welding & Dry Survey. Scope includes arrangement of staging to carry out the works on board. NOTE: Any additional stiffening over and above coaming shall be paid as per Foundation(s no 1.1+1.2 of annexure 1)
Erection of Fenders
Rubber Fender (D Type up to length of 1000 mm)
Rubber Fender (Cylindrical and D type for length above 1000 mm)
Rubber Tyre Fender
Wooden Fender
Half Round Steel pipe/rod fender
Note: HSL Scope: Processed steel Material, pipes, rods, Bolts/Nuts, Fenders to the size, Materials for fitment of Fenders Contr. Scope: Refer S.No. 4.2.5 in TTS Document
Rope Reel /Hose reel/Cable Reel(up to 600 mm dia)
Fabrication of Rope Reel /Hose reel/Cable Reel(up to 600 mm dia) as per Drg
Fabrication of Rope Reel /Hose reel/Cable Reel (above 600 mm dia) as per Drg
Note: HSL Scope: Processed Material as per drg Contr. Scope: Fabrication: Fit up, Welding & Dry Survey
Erection of Rope Reel /Hose reel/Cable Reel as per Drg along with fabrication and erection of foundation and under deck stiffening(up to 600mm dia)
Erection of Rope Reel /Hose reel/Cable Reel as per Drg along with fabrication and erection of foundation and under deck stiffening(above 600mm dia)
Note: HSL Scope: Rope reel, processed steel for foundation Contr. Scope: Fabrication and erection of foundation. Erection of reel: Shifting to location on board, Marking, Erection and Survey. Scope includes arrangement of staging to carry out the works on board.
Fabrication & Erection of Work Bench with Drawers
Note: HSL Scope: Processed Material Contr. Scope: Fabrication: Fit up, Welding & Dry Survey. Manufacture draws and wooden top as required and fix. Erection: Shifting to location on board, Erection, Marking, cutting, fit up, welding & Dry Survey.
Erection of Rungs/Hand Grips/ non-skid bars
Note: HSL Scope: Processed Material including bending if any Contr. Scope: Erection: Shifting to location on board, Marking, cutting, fit up, welding & Dry Survey.
Fabrication & Erection of Life Buoy Stands
Note: HSL Scope: Processed Material Contr. Scope: Fabrication: Bending, Fit up, Welding & Dry Survey Erection: Shifting to location on board, Marking, fit up, welding & Dry Survey.
Life Raft cradle and track
Fabrication and erection of cradle and track
Erection of cradle and track
Note: HSL Scope: Processed Material Contr. Scope: Fabrication: Fit up, Welding & Dry Survey Erection: Shifting to location on board, Marking, cutting, fit up, welding & Dry Survey.
Chain stopper arrangement
Note: HSL Scope: Processed Material / Chain Stopper Contr. Scope: Fit up, Welding & Dry Survey including under deck stiffening & Detailed Scope is placed at S.No.4.2.7 in TTS Document
Fabrication& Erection of Illumination Box
Note: HSL Scope: Processed Material, Perspex sheet, fasteners, packing Contr. Scope: Fabrication: Fit up, Welding & Dry Survey of box and foundation fabrication. Erection: Shifting to location on board, Erection, Marking, cutting, fit up, welding & Dry Survey.
Stowage Arrangement of Boats
Note: HSL Scope: Processed Material, chocks Contr. Scope: Fabrication: Fit up, Welding & Dry Survey Erection: Shifting to location on board, Marking, cutting, fit up, welding & Dry Survey. Chocks fitment.
Fabrication & Erection of Navigational Side Lights foundation
Note: HSL Scope: Processed Material Contr. Scope: Fabrication: Fit up, Welding & Dry Survey. Making hinged door. Erection: Shifting to location on board, Marking, cutting, fit up, welding & Dry Survey.
Fabrication & Erection of Bulwark Door
Note: HSL Scope: Processed Material, hinges Contr. Scope: Fabrication: Fit up, Welding & Dry Survey Erection: On board Fit up, Welding including Stiffening arrangement, Dry Survey
Arrangement of Racks and Lockers in stores
Fabrication & Erection of Racks & Lockers in store rooms as per Drg
Note: HSL Scope: Processed Material, angles, plates Contr. Scope: Fabrication: Fit up, Welding & Dry Survey Erection: On board Fit up, Welding including Stiffening arrangement, Dry Survey
Erection of Fire hose box
Note: HSL Scope: Firehose Box, angles and fasteners Contr. Scope: Fire hose box holding arrangement preparation, On board Fit up, Welding, Dry Survey. Installation of fire hose box
Removal of lifting Lugs/staging supports/temporary supports etc and grind smooth
Note: HSL Scope: Contr. Scope: Cutting, removal, smooth Grinding and shifting the removed material out of ship. Survey.
Manhole coamings and covers
Fabrication of Man Hole Covers
Note: HSL Scope: Processed Material, fasteners Contr. Scope: Fabrication as per Drg, Drilling, tapping , Welding & Dry Survey
Erection of Man Hole Covers
Note: HSL Scope: Fabricated manhole covers, gasket, fasteners Contr. Scope: Cutting, Fit up, Welding & Dry Survey as per Drg on tanks. Boxing up of manholes with gasket
Opening and Boxing up of Manhole covers of tanks
Note: HSL Scope: Tanks identification for Box up, gasket material Contr. Scope: Opening and closing to tightness of MH covers of Tanks. Make and Replace gasket if required. Fasteners to be secured after removal. Vacuum test of manholes with HSL kit.
Loose tanks
Fabrication & Erection of Loose tanks a) Ms
Fabrication & Erection of Loose tanks a) SS
Note: HSL Scope: Processed Material Contr. Scope: Fabrication: Fabrication of tank and foundation/supports. Erection of manholes, penetrations and Welding. Dry Survey and APT as per drg. Hydro test if required is to be carried.Erection of above on board and survey.
Erection of Loose tanks MS/SS along with supporting angles
Note: HSL Scope: Fabricated tank, angles, fasteners Contr. Scope: Erection: Shifting to location on board, Marking, drilling, cutting, erection, fit up, welding & Dry Survey.
Erection of Helideck Tie Down Points/lashing eyes (Including load test) (Up to 150 mm Dia)
Note: HSL Scope: Tie Down Points Contr. Scope: Marking, Cutting, Fit up, Welding, Dry Survey & Load Test
Cutting & Closing of temporary openings in steel Bhd and Decks (Including Fairing)
Cutting of Temporary opening
Note: HSL Scope: Contr. Scope: Marking, Cutting & Removal and stacking of removed cut plate using tack welding nearby location shown by department. Provide Temporary stiffening around opening as required.
Closing of Temporary Opening with existing removed cut out plate
Closing of Temporary Opening with new plate
Note: HSL Scope: Contr. Scope: Edge preparation, fit up and welding, Dry survey & Hose test/vacuum test to the satisfaction of HSL. Fairing, removal of temporary stiffening as required and grinding.
Fabrication of Black Ball (600 dia)/Diamond (600mm Size)/Cylinder (1200x600mm) (upto 2mm thk)
Note: HSL Scope: Processed Material Contr. Scope: Fit up, Welding & Dry Survey
Awning Covers Stitching
Note: HSL Scope: All Material like cloth, eyes, rope Contr. Scope: Stitching as per drawing. Minor modification if required
Erection of Accommodation Ladder arrangement (including rope arrangement and load testing)
Note: HSL Scope: Processed Material &accommodation Ladder, winch rope Contr. Scope: Accommodation ladder on board foundation preparation including stiffening & pulleys arrangement, Fit up, Welding, Dry Survey. Erection of all equipment & Load Testing
Fabrication & Erection of Expanded metal mesh partition with frame
Note: HSL Scope: Processed Material Contr. Scope: Fit up, Welding & Dry Survey and on board erection and survey
Fabrication and erection of Tunnel gratings as per Drg
Fabrication & Erection of gratings
Note: HSL Scope: Steel Material & Fasteners Contr. Scope: Layout Preparation, Flat bar/pipe Preparation, Marking, Cutting, Fit up, Welding, drilling& Dry Survey Erection on board after welding supports. Bolting the gratings as per drg
Fabrication & Erection of Protection covers for Equipment preservation
3 mm sheet
GI sheet
Note: HSL Scope: Processed Material Contr. Scope: Fabrication: Marking, Cutting, Fit up, Welding & Dry Survey Erection: On board shifting, Fitment & Dry Survey
Draft Marks (numeric or alphabet)
Note: HSL Scope: Draft Marks ( numeric and alphabet) cutting as per template made by contractor Contr. Scope: Scaffolding arrangement as required, arrangement of vertical batten from bottom of keel up to required height, marking of gauge lines on shell, gauge line inspection, Draft Marks template Preparation, Letters fit up, Welding & Dry Survey
ICCP Anodes/ echo sounder/speed log Steel casing
Note: HSL Scope: steel casing/housing Contr. Scope: Marking, Fit up, Welding & Dry Survey and Hose test
Sacrificial aluminium/Zinc Anodes
Up to 5 kg
Above 5 kg Upto12 kg
Above 12 kg
Note: HSL Scope: Anodes Contr. Scope: Marking, Fit up, Welding & Dry Survey
Erection of Drain Plugs
Note: HSL Scope: Drain Plugs Contr. Scope: Marking, Cutting, Fit up, Welding & Dry Survey and Vacuum test
Fairing of Hull, deck & Bhds
Below 10 mm thick
Above 10 mm thick
Note: HSL Scope: Contr. Scope: Undulations on Hull, Deck and Bhds are to be faired either by line heating or by providing strong back or by cutting and welding to bring to the acceptable standard
Fabrication of Gangway
MS gangway along with guard rails
AL gangway along with guard rails
Note: HSL Scope: Processed material, Chequered plates, GI Pipes & Wooden Steps Contr. Scope: Layout Preparation, Marking, Cutting, Fit up, Welding & Dry Survey
Fabrication and erection of eyebrows for doors, portholes and windows
Note: HSL Scope: Processed material Contr. Scope: Erection: marking, cutting, on board erection, fit up, welding & Survey
Alpha numeric Ship’s name
Erection of letter or number
Fabrication and erection of letter or number
Note: HSL Scope: Processed letter/number for s no 55.1 and plate for s no 55.2 Contr. Scope: Erection: Supplied name is to be erected on the hull, welded and surveyed. Staging to be erected and removed after completion Fabrication and erection: The template for the letter/number is to be lifted at site marked on plate and cut. Same are to be erected on hull, welded and surveyed
Installation of Ventilation Fans
Upto 50 kgs
50 kgs to 100 Kgs
100 kgs to 200 Kgs
Above 200 kgs
Note: HSL Scope: Ventilation Fan, Fab Fixing Flanges, processed steel/Half round Coamings, fasteners, packing material Contr. Scope: Shifting onboard, Structure/Coaming to be fabricated and the same to be fitted & welded in/on Deck/Bhd (Opening to be cut) and fan flanges to be welded to structure/coaming. Post dry survey of the structure/coaming, Fan to be aligned and fastened with fasteners & packing material and to be surveyed.
Description of Work / Item(s)
Amount
Fabrication of Deck Railing With Stanchions / Guard Rails (Fixed type including processing)
Note: HSL Scope: Raw Material, pipes, fastners Contr. Scope: Fabrication: Marking, Cutting, Fit-up, Welding, drilling, Tapping & Dry Survey
Fabrication of Deck Railing With Stanchions / Guard Rails (Collapsible type including processing)
Fabrication of guard rail by ferruling
Note: HSL Scope: Raw Material, pipes, fasteners, processed material for shoes, pvc coated guard rail wires, shackles, chains Contr. Scope: Fabrication: Marking, Cutting, Fitup, Welding, Drilling, tapping, Dry Survey Cutting guard rail wires to size and ferruling
Fabrication of Circular/Elliptical Coamings (Not exceed 0.15Sq.m.Thickness: 6 to 14mm)
Bending of Steel plate, Fabrication of coaming as per Drg.
Note: HSL Scope: Cut Plates Contr. Scope: Fabrication: Fit-up, Welding & Dry Survey
Rope Reel /Hose reel/cable reel (up to 600 mm dia)
Fabrication of Rope Reel /Hose reel (up to 600 mm dia) as per Drg
Fabrication of Rope Reel /Hose reel (above 600 mm dia) as per Drg
Note: HSL Scope: Processed Material as per drg Contr. Scope: Fabrication: Fit-up, Welding & Dry Survey
Manhole coamings and covers
Fabrication of Man Hole Covers
Note: HSL Scope: Processed Material, fasteners Contr. Scope: Fabrication as per drg, Drilling, tapping , Welding & Dry Survey
Loose tanks
Fabrication of Loose tanks
Note: HSL Scope: Processed material Contr. Scope: Fabrication: Fabrication of tank, Erection of manholes, penetrations and Welding. Dry Survey and APT as per drg. Hydro test if required is to be carried.
Fabrication of steel Non Water Tight Doors
Fabrication of NWT Doors with Frames
Note: HSL Scope: Processed material Contr. Scope:Fabrication of NWT door with frames as per Drg.
Vertical Ladders
Fabrication of Vertical Ladders
Note: HSL Scope: Processed Material Contr. Scope:Marking, Cutting, Fit up, Welding & Dry Survey. Providing securing lugs with necessary drill holes
Fabrication Awning stanchions and stowage arrangement - including Processing
b) Aluminium
Note: HSL Scope: Raw Material Contr. Scope: Fabrication: Marking, Cutting, Fit up, Welding, Dry Survey as per Drawing Erection: Shifting
Fabrication of Work Bench with Drawers
Note: HSL Scope: Processed Material Contr. Scope: Fabrication: Fit up, Welding & Dry Survey Erection: Shifting to location on board, Erection, Marking, cutting, fit up, welding & Dry Survey.
Arrangement of Racks and Lockers in stores
Fabrication of Racks & Lockers in store rooms as per Drg
Note: HSL Scope: Processed Material, angles, plates Contr. Scope: Fabrication: Fit up, Welding & Dry Survey
Fabrication of Tunnel gratings as per Drg
Fabrication of gratings
Note: HSL Scope: Steel Material & Fasteners Contr. Scope: Layout Preparation, Flat bar/pipe Preparation, Marking, Cutting, Fit up, Welding, drilling& Dry Survey
Note: 1. The contractor shall be solely responsible for the items taken from HSL and any excess materials shall be returned. 2. Contractor shall use only approved electrodes and consumables. Any electrodes/consumables issued by HSL will be chargeable.
SRI SRINIVASA ENGINEERING WORKS
Millennium Aero Dynamics Pvt. Ltd.
The Grants
SRI SATYA LAKSHMI ENGINEERING WORKS
SWAPNA FABRICATIONS AND CONSTRUCTIONS
Trinitech Infrastructure (India) Private Limited
KALATHIL BROTHERS CONSTRUCTION CO. PVT. LTD.
KIM FABS
SURYA TEJA ENGINEERIN WORKS
VARAHA NARASIMHA QUALITY SOLUTIONS
VENKATESWARA ENGINEERING WORKS
SEAHORSE MARINE VIZAG
KALA DOCKING AND ENGINEERING WORKS
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
SIRICON ENGINEERS AND CONTRACTORS
SRI SURYA KALA INDUSTRIES
Armor Surface Protection LLP
The Grants
Millennium Aero Dynamics Pvt. Ltd.
Trinitech Infrastructure (India) Private Limited
SWAPNA FABRICATIONS AND CONSTRUCTIONS
KALATHIL BROTHERS CONSTRUCTION CO. PVT. LTD.
KIM FABS
SEAHORSE MARINE VIZAG
SRISAI OILFIELD EQUIPMENTS AND MARINE SERVICES PVT LTD
Armor Surface Protection LLP
SURYA TEJA ENGINEERIN WORKS
VARAHA NARASIMHA QUALITY SOLUTIONS
VENKATESWARA ENGINEERING WORKS
SRI SURYA KALA INDUSTRIES
SRI SATYA LAKSHMI ENGINEERING WORKS
SIRICON ENGINEERS AND CONTRACTORS
KALA DOCKING AND ENGINEERING WORKS
HEMA RAO FAB AND ENGG WORKS
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .